Loading...
5.3 ERMUSR 11-10-2020UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Michelle Canterbury– Executive Administrative Manager MEETING DATE: AGENDA ITEM NUMBER: November 10, 2020 5.3 SUBJECT: 2021 Utilities Fee Schedule ACTION REQUESTED: Approve the 2021Utilities Fee Schedule for Adoption into Ordinance by the City Council. BACKGROUND: Typically, the Elk River Municipal Utilities Commission approvesthe budget in December. In January, the rates and fees are published. Per legal counsel, the Utilities’ ability to collect on fees would be strengthened by having them listed as part of the City’s Master Fee Schedule and adopted into city ordinance after being approved by the Commission. DISCUSSION: Annually ERMU staff reviews the proposed fees for the upcoming year. Proposed changes are highlighted in yellow on the attached fee schedule. Proposed changes include: Water Connection Charge and Water Availability Charge – Based on the cost of service study conducted in 2020 which included an analysis for ERMU’s water access charge (WAC), staff recommends increasing the Water Connection Charge and Water Availability Charge. The study determined that ERMU’s current WAC fee of $3,764per unitwas less than it should be to cover the true cost for a customer to buy into the existing water system at $3,990. The proposed change results in a 6% increase to the Water Connection Charge and Water Availability Charge. Hydrant Wrench – After review of our hydrant meter rental agreement and associated procedures, staff has determined that a hydrant wrench fee should be added to the fee schedule. The hydrant wrench fee would be charged only in instances when the wrench is damaged or not returned. FINANCIAL IMPACT: The proposed fees have been added or adjusted to cover the cost of providing services to our customers. ATTACHMENTS: Proposed - 2021 Utilities Fee Schedule ______________________________________________________________________________ Page 1 of 1 71 Elk River Municipal Utilities Proposed 2021 Utilities Fee Schedule Proposed Proposed CĻĻ 5ĻƭĭƩźƦƷźƚƓ 2020 2021Increase ELECTRIC New Residential Electric Connection - Developer - Lot with ERMU water service$ 475.00 $ 475.00 New Residential Electric Connection - Developer - Lot without ERMU water service$ 575.00 $ 575.00 New Residential Electric Connection - Builder$ 875.00 $ 875.00 New Wire Footages over 200' (per foot)$ 4.00 $ 4.00 New Service Frost Trenching (per foot)$ 5.00 $ 5.00 New Commercial & Industrial Electric Connection50%50% Service Upgrades or Additions for Existing Customers100%100% Minimum Temporary Electric Service Fee - Existing Transformer$ 150.00 $ 150.00 Minimum Temporary Electric Service Fee - Without Existing Transformer$ 500.00 $ 500.00 Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture $ 2,700.00 $ 2,700.00 Street Light - 23' Decorative Pole with Cobra Fixture $ 1,800.00 $ 1,800.00 Street Light - 14' Decorative Pole with Cobra Fixture$ 4,100.00 Street Light - 14' Decorative Pole with Acorn Fixture$ 5,300.00 Security Light - Wood Pole with Fixture$ 975.00 $ 975.00 Security Light - Existing Pole$ 125.00 $ 125.00 Pole Attachment Fee (per pole)$ 6.50 $ 6.50 Manual Meter Reading Fee (per month)$ 10.00 $ 10.00 WATER Water Access Charge = Water Connection Charge + Water Availability Charge$ 3,764.00 $ 3,990.00 6% Water Connection Charge (Per Plumbing Unit) - Builder$ 3,396.00 $ 3,600.00 6% Water Availability Charge (Per Plumbing Unit) - Developer$ 368.00 $ 390.00 6% Abandoned Water Service$ 2,500.00 $ 2,500.00 Hydrant Water Sales - Rental (per week)$ 50.00 $ 50.00 Hydrant Water Sales - Units (per 1000 gallons)$ 4.00 $ 4.00 Hydrant Wrench$ 40.00 New Deposit for 5/8" Hydrant Meter$ 150.00 $ 150.00 Deposit for 2 1/2" Hydrant Meter$ 1,000.00 $ 1,000.00 Private Hydrant Maintenance Program Monthly Fee$ 5.00 $ 5.00 Manual Meter Reading Fee (per month)$ 10.00 $ 10.00 ADMINISTRATIVE Administrative Fee for Continued Submission of Checks After No-Check Notice Given$ 20.00$ 20.00 Billable Cost of Materials Markup15%15% Billable Labor Markup55%55% Billable Vehicle / Equipment (per employee per hour)$ 30.00 $ 30.00 Commercial Application Fee$ 20.00 $ 20.00 Electric Service Disconnect/Trip Fee - Meter Technician $ 50.00 $ 50.00 Electric Service Disconnect/Trip Fee - Line Crew$ 150.00 $ 150.00 Water Service Disconnect/Trip Fee - Water Operator$ 100.00 $ 100.00 Energy Audit$ 150.00 $ 150.00 Meter Tampering Fee$ 250.00 $ 250.00 Meter Testing Fee$ 50.00 $ 50.00 NSF Fee$ 20.00 $ 20.00 Penalty Amount10%10% Photocopies (per page)$ 0.25 $ 0.25 Red Tag Handling Fee$ 20.00 $ 20.00 72