6.1j ERMUSR 12-08-2020UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: December 8, 2020 6.1j SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: Delivered four new water meters. Sealed the water meter, installed an encoder receiver transmitter, and took curb stop ties from four water services. Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH Completed 18 routine fluoride samples o All samples met MDH standards o Submitted MDH Fluoride Report During planning meetings for the Highway 169 Redefine project, MnDOT indicated they would like some of the water main relocations required for the project to be done next year, ahead of their work. Staff is working with Elfering and Associates to plan these relocations. Most of the other water main work will be performed by MnDOTs contactor during construction of the freeway. We have drained the Freeport Water Tower for the winter. Throughout previous winters, the tower was subject to roughly buildup on top of the water, which is extremely damaging to the structure and paint. We will wash and refill the tower sometime in the spring. During watermain valve exercising, water operators discovered that the service valve serving a customer on School Street is leaking. The property owners have been informed that they are required to have the valve repaired. Verizon Wireless has completed reinstallation of their equipment on Auburn Street Water Tower. Water Department staff has been working with City staff on replacing fire hydrants for the Public Safety Building project and adjusting gates at the Lake Orono Dam to maintain lake levels for the Lake Orono Restoration and Enhancement project. ATTACHMENTS: November 2020 Pumping by Well ______________________________________________________________________________ Page 1 of 1 162 16% , 6.816 , 26% , Well #3 10% , 11.028 , 4.494 , Well #4 Well #2 163 11% , 11% , 4.878 , 4.782 , Well #9 8% , November 2020 Monthly Pumping By Well Well #5 10% 8% , , 3.517 , 4.086 3.613 , , Values Are Displayed in Millions of Gallons (Well #, Gallons Pumped, Percentage of Pumping) Well #8 Well #7 Well #6