Loading...
6.3 SR 12-21-2020Request for Action To Item Number Mayor and City Council 6.3 Agenda Section Meeting Date Prepared by Presentations, Awards, December 21, 2020 Cal Portner, City Administrator and Recognition Item Description Reviewed by Activity Center Update — Michael Sedley, IAG Commercial Reviewed by Action Requested Receive information. Background/Discussion The City Council contracted with IAG Commercial Real Estate to broker the sale of the Activity Center property. Michael Sedley has been marketing the property and will provide an update on the progress thus far. He will also discuss some items to consider based upon the feedback he has received thus far. Financial Impact N/A Mission/Policy/Goal The Elk River mission statement components include a desire to responsibly grown and meet the changing needs of the community. Attachments ■ MVp Mechanical Service Co Inspection ■ Redline Building Services Quote ■ Thurnco, Inc. Quote The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei l_ y. M TUREJ Updated.• August 2020 MVp Mechanical Service Co 5667 Main Ave NE Albertville, MN 55301 US 763-477-8976 info@mvpmechanical.com http://www.MVpMechanical.com INVOICE BILL TO 413 Proctor Ave NW 413 Proctor Ave NW Elk River, MN JOB SITE ADDRESS 413 Proctor Ave NW ACTIVITY Inspection Boiler verification and check. NO official combustion analysis has been performed. Minor issues found. ``' Combustion air damper motor is leaking oil, this is a sign of upcoming motor failure which may prevent boiler from operating. AC has not been inspected or verified at this time due to the colder temperatures. ** The AC condensers are older and may present some issues down the line. This building is well maintained at this time. Inspect boilers and control system. #2 boiler has cracked refractory, not a major concern. Adjust all boiler high temp to 180* for best operating efficiency. Outside air damper motor is leaking motor lubricant from it reservoir and needs to be replaced. Properly replace air filters in west air handler. Tighten belt and adjust. >>** Most issues can be repaired using locally available parts and may be able to operate reliably for years to come if properly maintained and serviced. 7-1 Recommended repairs you may want to consider... Pricing for boiler replacement (priced as each) Includes r/r and disposal. 7-1 Recommended repairs you may want to consider... Replace combustion air damper motor. Still researching proper replacement/modification as this motor is from 1993, Estimate Only 7-1 Recommended repairs you may want to consider... System startup in spring. (Chemical clean outdoor condensers, check zones, motors and dampers, condensate drain lines and belts.) - PLUS any needed refrigerant, repairs, belts or parts. INVOICE # 120320mv1 DATE 12/03/2020 DUE DATE 01/02/2021 TERMS Net 30 ,,. RATE AMOUNT 1 480.00 480.00 0 9,000.00 0.00 1,250.00 0.00 1,800.00 0.00 Building at 413 Proctor Ave NW 12-9-2020 Elk River, MN 55330 Reroof both sections of building (10,200 square feet) Assessment: I inspected both sections of roofing currently on the building and found one to be a rubber membrane and the other a built-up roof. I believe that you could get approximately 5 more years out of each roof with some minor repairs. It has been communicated to me that there are not any significant roof leaks at this time. At this point the built-up roof is in fair shape, but sometimes when we get a hard freeze and thaw, they can suddenly split. Work to Reroof: • Remove the roof membrane from both roofs • Add 1.5" of Iso insulation and mechanically fasten down through the wood deck. The replacement of 200 square feet of wet existing insulation is included in this price, although we are not aware of any at this time. Additional insulation replacement will be a time and material charge discussed and approved by owner. • Fully adhere 0.6 mil EPDM membrane over the new insulation. • The perimeter will have to be built up to accept new insulation height which will also require replacing the top layer of Color Clad metal. • Replace scuppers and downspouts with new. This proposal does not include any modifications to electric or plumbing or HVAC or drains. Warranty by roofer is for 20 years. We will provide the city permits. Price could change if city has additional requirements. Total Price------------------------------------------------------------ $92,600.00 Pricing is valid for 90 days from date of quotation. All pricing is based upon the current costs of materials. Randy Swanson REDLINE Building Services, Inc. CELL PHONE FAX rardy(5redlineservices.com 1920 Shawnee Fid. 61 2.414.BB53 952.440.B4BB 952.440.41 99 www.redlineservices.com Eagan, MN 55122 MN State 0ic n v R n c a n• 20317320 13810 Hill Ridge Drive • Minnetonka, MN. 55305 • Phone 61 2-210-7622 • Email thurnco@gmail.com TO: IAG Commercial Real Estate/ Mr. Michael Sedley FROM: Thurnco Inc. Date: December 13, 2020 Re: Roof replacement of 413 Proctor Ave. NW, Elk River MN SUMMARY: The above -mentioned building currently has 2 different flat roof systems. The West section is a Firestone adhered EPDM roof, the East section has an asphalt and gravel (BUR) roof. As requested, a re -roof cost to replace the roofing, associated sheet metal fascia and have the insulation meet current "R" code / tapering requirements we be completed as follows; 1) Remove both the existing adhered EPDM membrane and BUR roofs and sheet metal fascia. (Would need space for a roll -off dumpster next to the building in an area that could be cordoned off for safety) 2) Furnish and mechanically fasten new layer(s) of insulation to meet or exceed current state code for average "R" 30 and minimum 1/8" per foot tapering to promote drainage. 3) Furnish and install any required new dimensional wood around roof perimeter to accommodate new insulation heights. 4) Furnish and install an adhered 60 Mil. EPDM roof system as per manufacturers 20- year specifications. 5) Flash -in all existing roof penetrations, interior roof drains and membrane seams as per manufacturers specifications. 6) Fabricate and install new standard color 24 Gauge pre -finished fascia metal and any existing scuppers. 7) Clean-up and haul away all roofing related debris to an authorized land -fill. Thurnco Inc would provide all required equipment, labor and materials to complete the roofing work as mentioned above for the cost of $117,000.00 This bid is based on current materials costs and would not include winter conditions. Roofing work would be expected to be initiated in spring of 2021. Above bid doesn't include any work by other trades (plumbing, electrical, HVAC, Etc.) in the unlikely event that any badly deteriorated metal decking is discovered during roofing tear -off. Areas would be shown to owner(s) representative. After areas agreed upon decking patching/ replacement would be done at the substantiated cost of materials and labor at the cost of $70/ man-hour. Payment plan negotiable, upon final payment provide owners with a manufacturers full system 20 year NDL warranty on all EPDM and workmanship. Thurnco Inc. is a factory approved applicator of Genflex/ Firestone and Carlisle roof systems. We have been installing adhered roof systems for 37 years. An extensive local reference list would gladly be furnished upon request. CONTRACT ACCEPTED BY: Thank you for the opportunity to bid this work. Please feel free contact me with any questions. Michael Thurnblom President 612 210-7622