5.9. SR 01-04-2021Request for Action To Item Number Mayor and Council 5.9 Agenda Section Meeting Date Prepared by Consent January 4, 2021 Jason Cook, P.E., Project Manager Item Description Reviewed by 2021 Street Improvements: Approve Plans and Justin Femrite, P.E., Public Works Director Reviewed by Ordering Advertisement for Bid Cal Portner, City Administrator Action Requested Adopt, by motion, a resolution approving the plans and ordering advertisement for bids. Background/Discussion The 2021 Street Improvements project has been designed and plans and specifications have been created based on the project detailed in the Capital Improvement Plan as depicted in the attached 2021 Pavement Management figure with the following exceptions: Lincoln Street and Kennedy Street in the NE region of the city have been re-evaluated and we recommend moving them to the 2023 project year. Twin Lake Road was found to require a full pavement replacement due to the bituminous make up of the existing road not being sufficient to handle the traffic volumes and loading. The proposed improvements generally include pavement mill and overlay, full depth reclamation and pavement replacement. Also included are spot curb and sidewalk repairs, as well as some trail overlays. The plans and specifications now need to be approved and ordered to be advertised for no less than 21 days to receive competitive bids. The following is the anticipated project schedule: ■ January 27, 2021 — Receive Bids ■ February 2021 — Consider Bid Award ■ Summer 2021 — Construction Season Financial Impact There are eight state aid routes within the project limits eligible for state aid funding. The remainder of the project cost would be funded through the city franchise fee. Mission/Policy/Goal Long Term: Maintain Infrastructure. Attachments ■ Resolution Approving Plans and Ordering Advertisement for Bids. The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei ly. M TUREJ Updated.• August 2020 City of Elk River City of Elk River City Council Resolution 2 1 - A Resolution of the City Council of the City of Elk River Approving Plans and Ordering Advertisement for Bids for 2021 Street Improvements Project WHEREAS, Bolton & Menk, Inc. has prepared plans and specifications for the 2021 Street Improvements Project, and WHEREAS, the improvements shall consist of the resurfacing of those roadways identified in the current 2021 pavement management plan and as modified by the Public Works Director; and WHEREAS, in order to obtain competitive bid pricing, the project documents shall be advertised for no less than 21 days where they will be publicly read. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota, as follows: Such plans and specifications, copies of which are on file in the City Offices, are hereby approved. 2. Bolton & Menk, Inc. shall prepare and cause to be inserted in the official paper and on QuestCDN an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published for no less than 21 days, shall specify the work to be done, shall state that bids will be received on QuestCDN until 10:00 am on January 27, 2021 at which time they will be publicly opened and read by the Project Manager. The bids will then be tabulated, and will be considered by the council at approximately 6:30 p.m. on February 1, 2021, in the Council Chambers of the City Hall. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless submitted on QuestCDN and include a bid bond payable to the City of Elk River for five percent (5%) of the amount of such bid. Passed and adopted this 41h day of January 2021. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk Preliminary Proposed Street Improvements Proposed Construction 2021 BITUMINOUS OVERLAY - 12.2 miles RiVer FULL DEPTH RECLAMATION - 1.5 miles 0 0.25 0.5 1 Miles