Loading...
6.1g ERMUSR 01-12-2021UTILITIES COMMISSION MEETING TO:FROM: ERMU Commission Thomas Geiser – Operations Director MEETING DATE: AGENDA ITEM NUMBER: January 12, 2021 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: Staff continues to work with Kodet Architectural Group, Ltd. ondesign elements for the field services building expansion. Staff is also in the process of developing ERMU’s contractwith RJMConstructionfor construction management services. Staff continues to have meetings with T2 Utility Engineers, WSB Engineering, and MnDOTfor the upcoming Highway169 Redefine project. ERMU has received the Notice and Order from MnDOT which authorizes us to start obtaining material and contact the State’s assigned engineer to schedule relocation and/or adjustment work for the water and electric infrastructure. As part of the Highway 169 Redefine project, the electric department is working with Great River Energy on a plan to relocate transmission poles that ERMU service lines are attached to. ______________________________________________________________________________ Page 1 of 1 104