7.2 PRSR 02-10-2021
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and
community engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
7.2
Agenda Section
Action Item
Meeting Date
February 10, 2021
Prepared by
Michael Hecker, Parks and Recreation Director
Item Description
Woodland Trails Regional Park Parking Lot
Reviewed by
Justin Femrite, Public Works Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Discuss the expansion of the Woodland Trails Regional Park parking lot.
Recommend, by motion, the expansion of the Woodland Trails Regional parking lot.
Background/Discussion
Commissioner Mike Niziolek requested a discussion of the Woodland Trails Regional Trails Regional Park
(WTRP) to discuss parking lot expansion due to the increase in the number of park users.
The parking lot is scheduled for pavement maintenance in the form of a mill and overlay in 2021 together with
construction of a new access trail as part of the Active Elk River project. Staff discussed the possibility of
increasing the number of parking spots as part of this maintenance work. According to the 2016 WTRP
Master Plan, the lot should be reconfigured to support angled parking and one-way traffic.
Financial Impact
An expansion would be funded through Park Dedication and estimated at about $40,000. The Pavement
Management Fund supports rehabilitation of exiting pavements, not new construction/expansion. The trail
funded through Active Elk River is about $55,000.
Mission/Policy/Goal
N/A
Attachments
Parking Lot Plans
920
930
940
950
960
970
980
990
1000
1010
920
930
940
950
960
970
980
990
1000
1010
0+00 957.20956.5956.12955.41+00 956.76955.2957.66956.62+00 958.36957.7958.20958.13+00 957.44957.2956.68956.64+00 956.71956.3957.55956.95+00 958.40957.4958.82958.16+00 958.61958.0958.38958.17+00 958.34957.8959.20959.38+00 960.11960.2959.86959.69+00 959.18958.4958.50958.910+00 957.83958.5956.92957.611+00 955.84955.6954.75954.512+00 953.68953.5952.213+00 13+50
2.08%
-4.47%
-3.75%1.79%-2.17%
-0.75%-4.57%
-1.53%1.70%-0.47%2.06%-1.36%VPI: 0+38.84EL: 956.97VPI: 0+53.76
EL: 957.28
VPI: 0+60.25
EL: 956.99 VPI: 12+49.12EL: 953.69VPI: 12+65.13
EL: 953.57 VPI: 12+92.69EL: 952.31VPI: 10+71.89EL: 957.53VPI: 2+62.87
EL: 958.78
A = -3.32%
K = 27.10
L=90'
VPI: 5+81.32
EL: 958.93
A = -2.17%
K = 27.63
L=60'
VPI: 8+58.99
EL: 960.42
A = -3.42%
K = 17.55
L=60'
VPI: 0+93.32
EL: 955.75
A = 5.54%
K = 10.84
L=60'
VPI: 4+25.47
EL: 956.29
A = 3.23%
K = 18.55
L=60'
VPI: 7+48.86
EL: 958.15
A = 2.53%
K = 23.68
L=60'HP: 2+66.30EL: 958.41HP: 5+98.29EL: 958.82HP: 8+65.19EL: 960.17LP: 1+03.95EL: 956.11LP: 4+23.93EL: 956.53LP: 7+30.02EL: 958.26VPC: 2+17.87EL: 957.98VPC: 5+51.32EL: 958.42VPC: 8+28.99EL: 959.80VPT: 1+23.32EL: 956.29VPT: 4+55.47EL: 956.80VPT: 7+78.86EL: 958.76VPT: 3+07.87EL: 958.09VPT: 6+11.32EL: 958.79VPT: 8+88.99EL: 960.01VPC: 0+63.32
EL: 956.88
VPC: 3+95.47EL: 956.75VPC: 7+18.86EL: 958.29CCC
C
C
C
C
C
C
C
C
C
C
C
M
FF=95
6
.
2
8
P
P
P
P P
P
P
CB
R=952.57
I=NE (12INCH HDPE)950.37I=I=I=I=I=
I=9
4
9
.
4
5I=949.5
8
M
P
P
P
O
E OEOEOE
OE
>>
>>
0+0
0
1+00 2+00 3+00
4+00
5+00 6+00
7+00
8+00
9+00 10+00
11+00
12+00 13+0013+34.72BP: 0+00.00E
P
:
1
3
+
3
4
.
7
2
PC: 0+70.02
PC: 12+44.42
PC: 2+89.28 PC: 3+76.45PC: 4+84
.60
PC: 8+12.09
PC: 10+12.48
PT: 1+14.03
PT: 12+69.09
PT: 3+05.76 PT: 4+56
.42PT: 5+85.08PT: 8+48.34
PT: 10+69.06
95
6
.
8
0
95
7
.
3
0
95
7
.
6
4
95
8
.
2
9
95
6
.
9
2
DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
SHEET
Bolton & Menk, Inc. 2021, All Rights ReservedcH:\ELKR\0R1123284\CAD\C3D\123284C601.dwg 2/1/2021 3:41:40 PMDESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
ISSUED FOR DATENO.
R
7533 SUNWOOD DR NW, SUITE 206
RAMSEY, MINNESOTA 55303
Phone: (763) 433-2851
Email: Ramsey@bolton-menk.com
www.bolton-menk.com
OF
CITY OF ELK RIVER
2021 STREET IMPROVEMENTS
61
ZFL
JML
JWC
R13.121582
JASON W. COOK
12/30/202047451
SAP 204-104-008
SAP 204-118-001
SAP 204-132-005
SAP 204-133-006
SAP 204-136-001
SAP 204-144-001
SAP 204-146-001
SAP 204-156-001
STATE AID PROJECT NUMBERS
R
IMPROVEMENT LAYOUT
1FEETSCALE
0 50 100
HORZ.
FEETSCALE
0 5 10
VERT.
RELOCATE SIREN POLE
TIE-IN TO EXISTING TRAIL
1
WOODLANDS TRAILS PARK IMPROVEMENTSELK RIVER RD NWRELOCATE GUY WIRE ANCHOR
RELOCATE "NATIVE
PRAIRIE PLANTING "
SIGN
86 PARKING STALLS
4 DISABILITY STALLS
REPLACING 72 PARKING STALLS & 2 DISABILITY STALLS
CLEARING & GRUBBING (0.1 ACRE)
THIS PATH SOUTH OF LARGE TREE
AVOIDS OTHER TREES
PROTECT TREE
RELOCATE "T - INTERSECTION"
TRAFFIC SIGN
IMPACTED PRAIRIE
GRASS LOW SPOT5.13' FROM EDGE OFSIGN TO EDGE OF TRAIL30'30'
32'24' B-FR160' (20 MPH)R110'
(20
MPH
)
2
4
'
B
-
F