Loading...
6.1e ERMUSR 02-09-2021______________________________________________________________________________ Page 1 of 2 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Tom Sagstetter – Conservation & Key Accounts Manager MEETING DATE: February 9, 2021 AGENDA ITEM NUMBER: 6.1e SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In the last 30 days, the level two charger located downtown had 32 sessions and provided customers with 477 kWh of green energy. The DC fast charger at the Coborn’s fuel station had 12 sessions and provided 145 kWh. The charger in the ERMU/City Hall parking lot had 6 sessions and provided customers with 100 kWh. There was a total of 50 charging sessions and 722 kWh of energy provided over the last 30 days. • The major topics in 2021 for the Minnesota Municipal Utilities Association’s government relations group are: renewable energy proposals, Energy Conservation & Optimization (ECO Act), department of labor charges for inspecting load management radio receivers, Gopher State One Call processes, broadband funding, and bonding for public facilities. • Staff is continuing to work with Waste Management; McGrann, Shea, Carnival, Straughn & Lamb legal services; and Dave Berg Consulting, LLC on the future operations of the landfill-gas-to-electric plant. • Energy City Commission has been working with the Elk River Parks and Recreation Department to determine the location of the demonstration solar-powered shelter. The location and type of structure will be finalized in preparation for the Orono Park redevelopment project. The plan is to pour the concrete in 2021 with the construction of the shelter and solar photovoltaic array to occur in 2022. • Staff completed the annual compliance filing on Distributed Generation Docket No. E999 21-10. This filing provides the Minnesota Department of Commerce with a complete list of all the distributed generation resources that are interconnected, or in the process of interconnection, with the distribution system. This year ERMU connected eight new solar photovoltaic systems. This was the most systems connected in one year. A summary is attached. 120 ______________________________________________________________________________ Page 2 of 2 • Finalized the participants and talking points for the Data Center Summit 2021 discussion panel, held in partnership with City of Elk River Economic Development Authority (EDA), occurring on March 17. Each year the Minnesota Real Estate Journal provides training seminars for brokers and agents for continuing education credits to retain their licenses. This year ERMU and the EDA will provide a session on “Deciding Factors for Data Center Locations.” Speakers will be from Elk River, Xcel Energy, and Minnesota Municipal Power Agency. ATTACHMENTS: • 2020 Distributed Generation and Cogeneration Summary 121 CUSTOMER NUMBER FACILITY CAPACITY (kW) YEAR INTERCONNECTED PRODUCTION (kWh)/year CONSUMPTION (kWh)/year Customer 3 5 2019 7,502 362,900 Customer 4 13.3 2017 15,265 13,320 Customer 5 5 2002 4,736 33,681 Customer 6 17.755 2019 18,653 37,774 Customer 7 6.27 2016 8,001 8,695 Customer 8 11.4 2017 14,715 19,517 Customer 9 11.88 2019 14,035 13,260 Customer 10 5.13 2016 5,288 24,131 Customer 11 9.48 2008 8,392 16,476 Customer 12 17.28 2017 13,920 20,045 Customer 13 7.5 2019 7,719 9,391 Customer 15 5 2020 5,780 7,783 Customer 16 7.6 2020 3,808 17,677 Customer 17 20 2020 398 24,375 Customer 18 6.785 2020 6,072 12,057 Customer 19 10 2020 - 14,416 Customer 20 5 2020 810 12,975 Customer 21 7.6 2020 615 14,582 Customer 22 5 2020 - 10,434 Total 135,709 584,650 CUSTOMER NUMBER FACILITY CAPACITY (kW) YEAR INTERCONNECTED PRODUCTION (kWh) CONSUMPTION Customer 14 30 Prior to ERMU Service N/A 26,330 Total - 26,330 CUSTOMER NUMBER FACILITY CAPACITY (kW) YEAR INTERCONNECTED DELIVERED (kWh) Customer 1 670.00 2001 765,600 Customer 2 3,200.00 2002 24,342,495 Total 25,108,095 2020 DISTRIBUTED GENERATION & COGENERATION SOLAR WIND Wheeling 122