Loading...
6.1j ERMUSR 02-09-2021______________________________________________________________________________ Page 1 of 2 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Dave Ninow – Water Superintendent MEETING DATE: February 9, 2021 AGENDA ITEM NUMBER: 6.1j SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Delivered eleven new water meters. • Sealed the water meter, installed an encoder receiver transmitter, and took curb stop ties from eleven water services. • Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH • Completed 21 routine fluoride samples o All samples met MDH standards o Submitted MDH Fluoride Report • Submitted Discharge Monitoring Report (DMR) to the Minnesota Pollution Control Agency (MPCA) for the Water Treatment Plants. • Submitted DMR to the MPCA for the Diesel Generation Plant. • On January 30, we received a report of water boiling out of the ground on the west side of Jackson Avenue, north of School Street. Utility staff was able to shut off the ten-inch water main and excavate to find a radial crack in the pipe. Rental of a larger excavator was needed due to the depth of the water main; repair of the leak was done in house by utility staff. • During our routine annual inspections of the iron and manganese filter at water treatment plant #4 the water operators found that the filter media was uneven, indicating an issue with backwashing. They also witnessed that there were some small “mud balls” (clumps of media, iron, and manganese) on top of the filter media. We have added a high strength chlorine solution to the filter and are running a series of air washes and backwashes to break up the clumps. Filter media will need to be added to replenish what was lost due to backwashing. The water plant control programing will be modified to fix issues with the backwash sequence. • The diaphragm pump that feeds sodium permanganate failed at water treatment plant #6. We have replaced it with a new peristaltic chemical feed pump which will be more accurate and reliable. 131 ______________________________________________________________________________ Page 2 of 2 • Installation of the water main for a future municipal well was included in the plans for Fire Station #3. ERMU’s cost for this portion of the project will be $60,130. This will come from the $500,000 in the water main construction capital budget. • Water department staff continues to work on plans for relocating water main that MnDOT has identified as conflicting with the Highway 169 Redefine project. • The water operators have continued to work on the annual preventative maintenance of our water treatment plants. ATTACHMENTS: • January 2021 Pumping by Well • Photos – Water Main Break - Jackson Avenue 132 Values Are Displayed in Millions of Gallons (Well #, Gallons Pumped, Percentage of Pumping) Well #2, 8.382, 20% Well #3, 11.361, 27% Well #4, 2.033, 5% Well #5, 4.782, 12% Well #6, 1.194, 3% Well #7, 4.53, 11% Well #8, 4.741, 11% Well #9, 4.741, 11% January 2021 Monthly Pumping By Well 133 Photos—Water Main Break—Jackson Avenue 134