Loading...
85-057 RES RESOLUTION 85- 57 . A RESOLUTION ORDERING PREPARATION OR FEASIBILITY STUDY FOR STREET AND UTILITY IMPROVEMENTS ON MAIN STREET AND ORONO ROAD (IMPROVEMENT PROJECT 85-5) WHEREAS, it is proposed to improve sanitary sewer service, water main service, storm drainage service and to provide street improvements on Main Street and Orono Road and assess the benefitted property for all or a portion of the cost of the improvements, pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Elk River, Minnesota, that the proposed improvements be referrred to Mr. Terry Maurer, the City's Consulting Engineer, for study, and the Engineer is instructed to report to the Council with all convenient speed advising the Council in a preliminary way whether the proposed improve- ment is feasible and as to whether it should be best made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Passed and adopted by the Elk River City Council on this twenty-first day of October, 1985. . -~'---7--" '\ -, .', ~AL'~ /'" (" /? /' .., / ,~,c,__-_. ,/ - ,/ > " . .~l-~L-r~ ~ -Pf- ,-e-:r/ '{e Richard Hinkle, Mayor ' ATTEST: tor .