Loading...
9.4 SR 02-16-2021Request for Action To Item Number Mayor and City Council 9.4 Agenda Section Meeting Date Prepared by Work Session February 16, 2021 Justin Femrite, P.E., Public Works Director Item Description Reviewed by Trail Rating Index and Maintenance Goals Cal Portner, City Administrator Reviewed by Action Requested Provide direction, by consensus, to establish trail maintenance standards and discuss funding strategy. Background/Discussion In the fall of 2020, staff was directed to map all trail segments and rate their pavement condition on a 0-10 index, much like the street pavement rating index which uses a 0-100 index. The Park and Recreation Commission reviewed the trail condition rating system at their February 10, 2021, meeting. Staff is asking for concurrence around a rating goal for the average condition of the trail system. From this, funding scenarios will be reviewed and recommended to achieve the system average goal as we work into budget and CIP development this year. Financial Impact N/A Mission/Policy/Goal The Elk River Mission states council and staff work with citizens to develop a sustainable and prosperous community for all to live, work and play: and to appropriately govern in an ever -changing environment. Attachments Street Pavement Condition Map — 2020 Trail Condition Map — 2020 Asphalt Trail Rating System The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei ly. M TUREJ Updated.• August 2020 i - i Ir \11-f i �- City of Elk River Pavement Condition Ratings - 2020 90 - 100 Excellent 80 - 90 70-80 60-70 50-60 40 - 50 30 - 40 20 - 30 10-20 0 - 10 Failed .t December 2020 1 System Average 75.28 ! - i City of Elk • River 0 0.5 1 2 Miles _._._._._._._._._._._._._,_._._.......... .......................... ................................................ - - i City of Elk River Trail Condition Ratings - 2020 December 2020 i System Average i 10 - Excellent 5'99 i 9 8 ! i i 7 i i 6 ` 5 City of �'•�.�, 4 Elk 3 e , 2Ri er �• i •. i 1- Failed 0 0.5 1 2 Miles �`..- Asphalt Trail Rating System None None No longitudinal cracks. Occasional transverse crack, widely spaced (40' or greater). All cracks sealed or tight (open less than 1/4"). New Construction. Fog seal within 2- years of construction. Recent overlay, like new. Fog seal within 2- years of last overlay. First signs of aging. Recent fog or micro seal. Little or no maintenance required. Very slight or no raveling, surface shows few signs of wear. Longitudinal and transverse cracks (open 1/4") spaced 10' or more apart, little or slight crack Shows limited signs of aging. Maintain with raveling. Few patches and trail edges in excellent condition. Tree root or rodent standard crack filling (routed and rubber filled). damaged (heaves or sunken) areas spaced 500' or more. Slight raveling (loss of fines), surface showing signs of wear or degradation. Shows signs of aging. Sound structural Longitudinal and transverse cracks (open 1/4"- 1/2") spaced 10' or less apart with condition. Cracks treated with a combination some block cracking developing. Patches and trail edges in good condition. Tree of standard filling and velocity patching. root or rodent damaged (heaves or sunken) areas spaced between 200'-500'. Surface condition should be extended with micro seal. Moderate raveling (loss of fines and course aggregate). Longitudinal and Surface aging and edge degradation. transverse cracks (open more than 1/2") with secondary cracks now developing. Recondition most cracks and edge deformation Signs of longitudinal cracking developing along trail edge. Patches and trail edges with velocity patching. Potential candidate in fair condition. Tree root or rodent damaged (heaves or sunken) areas spaced for a micro seal or bituminous overlay after between 100'-200'. patching. Severe surface raveling. Longitudinal and transverse cracks (open more than Very aged with structural edge degradation. 1/2") with secondary cracks fully developed. Longitudinal cracks developed along Recondition with patching of worst areas and trail edge. Patches and trail edges in fair condition. Tree root or rodent bituminous overlay of full section. Consider damaged (heaves or sunken) areas spaced between 50'-100'. root treatment in isolated areas. Severe surface loss with closely spaced longitudinal and transverse cracks that Candidate for a Full Depth Reclamation (FDR) have developed into second and third cracks. Patches and trail edges in fair to with new pavement. Consider root treatment poor condition. Tree root, rodent damage and other pothole areas spaced less as part of the reconditioning effort. than 50'. Severe surface loss with closely spaced longitudinal and transverse cracks that Nearly unusable. Redesign and reconstruction have developed into full alligatoring. Patches and trail edges in poor condition. of trail including aggregate base, areas of Tree root, rodent damage and other pothole areas spaced less than 50'. subgrade correction and drainage improvements. Severe distress with extensive loss of surface integrity Failed. Redesign and reconstruction of trail including aggregate base, areas of subgrade correction and drainage improvements. Supplement distress review with the Asphalt PAS ER Manual, produced by the University of Wisconsin -Madison Transportation Information Center.