Loading...
3.1. SR 02-22-2021 Request for Action To Item Number Mayor and City Council 3.1 Agenda Section Meeting Date Prepared by Consent February 22, 2021 Brandon Wisner, Engineering Project Manager Item Description Reviewed by Fire Station #3 - Bid Category #5A Steel Cal Portner, City Administrator Supply - Rebid Recommendation Reviewed by Action Requested Approve, by motion, Fire Station #3 - Bid Category #5A Steel Supply to Distinctive Iron in the amount of $382,956.25. Background/Discussion At the February 4, 2021, meeting, Council approved a rebid of category #5A Steel Supply since only one bid was submitted. This rebid was posted in the Star News on February 6 and 13. A total of six bids were received and publicly opened on February 18, 2021. The total amount is higher than the bid last month since it was found that some fabricated steel details were not originally identified. This would have ended up being a more expensive change order during the project. The difference will not increase the total project budget. Financial Impact Budgeted Mission/Policy/Goal  Responsibly Grow Attachments  Bid Category #5A Steel Supply – Rebid Recommendation  Bid Tabulation The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: August 2020                February 19, 2021    Mr. Brandon Wisner  City of Elk River  13065 Orono Parkway  Elk River, MN 55330    RE: City of Elk River Fire Station #3 | Bid Category #5A Steel Supply – Rebid Recommendation    Dear Mr. Wisner,    Terra Construction (Terra) received bids at the City of Elk River on Thursday, February 18, 2021 for the  above referenced project.  A total of six (6) bids were received and read aloud.  A copy of this bid  tabulation is attached.    Terra has completed its review of the bids and recommend to the City Council that they approve the  award of the contracts as follows for Bid Category #5A Steel Supply.            Addendum #6 was issued during this re‐bid that added seven (7) custom fabricated steel details at the  transom windows that were previously not shown in the construction documents.  Distinctive Iron did  acknowledge receipt of all six (6) addendum on their bid form and during our post‐bid scope review  with them, they did confirm that these were included in their bid.    Please feel free to contact me with any questions.      Respectfully Submitted,     Terra Construction    Ben Newlin  Vice President    Attachment:  Bid Tabulation – Bid Category #5A Re‐Bid    SUPPLIER AWARD AMOUNT Distinctive Iron - Elk River, MN 382,956.25$ BID CATEGORY BC#5A - Steel Supply Bid Tabulation Project Name Elk River Fire Station #3 Bid Opening 2/18/2021 BID CATEGORY 5A - Steel Supply Re-Bid Ben's Structural Fabrication Briese Iron Works Construction Systems, Inc.Distinctive Iron Thornberg Steel Thurnbeck Steel Fabrication 1-6 1-6 1-4 1-6 1-6 1-6 395,000.00$ 407,070.00$ 478,000.00$ 382,956.25$ 482,000.00$ 461,525.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 395,000.00$ 407,070.00$ 478,000.00$ 382,956.25$ 482,000.00$ 461,525.00$ Alternates Total BASE BID + ALTERNATES 21025 Commerce Blvd., Suite 1000 Rogers, MN 55374 SUB-CONTRACTOR Addendum Acknowledged BASE BID Add Alternates1 - N/A 2 - N/A