7.3. SR 03-15-2021it ci
Elk*
River
Request for Action
To
Item Number
Mayor and City Council
7.3
Agenda Section
Meeting Date
Prepared by
Public Hearings
March 15, 2021
Zack Carlton, Planning Manager
Item Description
Reviewed by
Riverwalk Apartment — Stonewood
Chris Leeseberg, Senior Planner
Reviewed by
Development, LLC
■ Zone Change: FAST to Planned Unit
Cal Portner, City Administrator
Development
■ Conditional Use Permit: Establish Residential
PUD
■ Easement Vacation: Zane Street Right -of -
Way and Drainage and Utility Easements
■ Final Plat: Delta Addition
Action Requested
Adopt, by motion, an ordinance amendment changing the zoning from
FAST (A) to Planned Unit Development, with the condition that the
Conditional Use Permit (CUP) is also approved and recorded.
Approve, by motion, the CUP establishing the PUD for Riverwalk
Apartments with the following conditions to satisfy the standards set
forth in Section 30-654:
1. Council approval of the associated applications - Zone Change
(ZC 21-01), Easement Vacation (EV 21-02) and Platted
Exemption (PE 21-01)
2. The CUP will not be recorded until a PUD agreement has been
approved by the City Council.
3. All comments from the comment letter dated February 26, 2021,
be addressed.
4. Comments from outside agencies, MnDOT and the DNR are
addressed.
5. Staff approval of all site, civil, and architectural plans. �P
6. Park dedication shall be paid in accordance with city ordinances ti"y
and fee schedule at the time of building permit release.
Adopt, by motion, a resolution vacating certain portions of the right -
Figure I
of -way for Zane Street and existing drainage and utility easements upon
condition that the associated plat, The Delta, is approved by the City Council.
The Elk River Vision P I I E I E U I Y
A welcoming community with revolutionary and spirited resourcefulness, exceptional [NATURE]
service, and community engagement that encourages and inspires prosperity. Updated. August 2020
Adopt, by motion, a resolution approving the plat of The Delta upon condition that the plat will not be recorded
until all conditions of approval for the associated CUP (CU 21-03) have been satisfied.
Background/Discussion
Case Nos. - ZC 21-01, CU 21-03, EV 21-02, & PE 21-01
The applicant, Stonewood Development LLC, is proposing to establish a high -density PUD that includes two 89-
unit buildings. The project would be constructed in two phases, the first of which includes demolition of the
former Saxon Motors building. The two -phased project is reflected in the proposed plat, The Delta, which
establishes two lots in place of the existing three lots included in the subject area.
To establish the PUD and construct the project, the property must be rezoned to from FAST to PUD. The
project also includes an easement vacation and platted exemption that will be reviewed by the City Council. The
last step will be approval of a PUD Agreement that outlines the project and provides a framework for the project,
which includes materials and colors, building design and architecture, and deviations from ordinance standards.
Comprehensive Plan
The Comprehensive Plan guides the property for high -density residential uses within the FAST plan. The project
complies with the Comprehensive Plan.
Park Dedication
The Park and Recreation Commission recommended cash dedication for all 178 units and a trail easement along
the top side of the bluff. The City Council has also directed staff to amend the city's fee schedule and ordinance to
cap Park Dedication Fees for multi -family projects at $500,000. This project will benefit from that change.
Easement Vacation
The applicant has requested vacation of certain portions of the existing Zane Street right-of-way. The vacation will
facilitate development of a new cul-de-sac south of Elk River Residential Suites and improvements on the subject
site. The applicant has also requested vacation of all existing drainage and utility easements to clean-up the site for
development. Required easements, including those that preserve access to existing infrastructure, will be recorded
as part of the new plat, The Delta.
Applicable Regulations
Easement Vacation
Right-of-way and drainage and utility easements can only be approved if the City Council determines the vacation
to be in the public benefit. The right-of-way vacation does not vacate an entire street, nor does it eliminate access
that already exists. Instead, the vacation supports development of a cul-de-sac at the end of Zane Street,
improving mobility for all uses along this segment of the street, and accommodates development of the unique
site. The street vacation is in the public benefit.
Vacation of the drainage and utility easements facilitates development of the subject parcel and all required
easements will be dedicated with the new plat.
Platted Exemption
The applicant has applied for a platted exemption that combines three existing parcels into two, facilitating
development of the two -phased Riverwalk project. City ordinances do not require a plat for a reduction in the
number of lots as it does not meet state requirements for a subdivision of land. However, combining parcels
across plat boundaries requires a plat per standards from Sherburne County. With dedication of easements and
appropriate rights -of -way for the new cul-de-sac, the plat meets city standards.
Financial Impact
None. However, the applicant also applied for a TIF district which will be reviewed by the City Council on April
5, 2021.
Mission/Policy/Goal
■ Responsibly grow
■ Meet changing needs - Agile
Attachments
■ Planning Commission Packet dated March 4, 2021.
■ Ordinance Amendment — Zone Change
■ Resolution — Easement Vacations
■ Plat of The Delta
■ Resolution — Plat Approval
Request for Action
ver
To
Item Number
Planning Commission
3.3
Agenda Section
Meeting Date
Prepared by
Public Hearings
March 4, 2021
Zack Carlton, Planning Manager
Item Description
Reviewed by
Riverwalk Apartment — Stonewood
Chris Leeseberg, Senior Planner
Development, LLC
Reviewed by
■ Zone Change: FAST to Planned Unit
Development, Case No. ZC 21-01
■ Conditional Use Permit: Establish Residential
PUD, Case No. CU 21-03
Action Requested
Recommend, by motion, approval of the Zone Change with the
condition that the CUP is also approved and recorded.
Recommend, by motion, approval of the Conditional Use Permit with
the following conditions to satisfy the standards set forth in Section
30-654:
1. Council approval of the associated applications - Zone Change
(ZC 21-01), Easement Vacation (EV 21-02) and Platted
Exemption (PE 21-01)
2. The CUP will not be recorded until a PUD agreement has been
approved by the City Council.
3. All comments from the comment letter dated February 26,
2021, be addressed.
4. Comments from outside agencies, MnDOT and the DNR are
addressed.
5. Staff approval of all site, civil, and architectural plans.
Background/Discussion
The applicant, Stonewood Development LLC, is proposing to establish
a high -density Planned Unit Development (PUD) that includes two 89-
unit buildings. The project would be constructed in two phases, the
first of which includes demolition of the former Saxon Motors
building.
In order to establish the PUD and construct the project, the property must be rezoned to from FAST to PUD.
The project also includes an easement vacation and platted exemption that will be reviewed by the City Council.
The last step will be approval of a PUD Agreement that outlines the project and provides a framework for the
The Elk River Vision rNATUREE]
I 1 E I E I s
A avelcoming community With revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and insires pro perity. Updated. August 2020
project, which includes materials and colors, building design and architecture, and deviations from ordinance
standards.
Comprehensive Plan
The Comprehensive Plan guides the property for high -density residential uses within the FAST plan. The project
complies with the comprehensive plan.
Site Plan
The project includes two residential buildings constructed along Zane Street, which will now end in a new cul-de-
sac. The project area will be accessed via three driveways — one for each phase and one shared driveway between
the two sites. The majority of surface parking is located between the street and the buildings and remainder of the
parking is provided beneath the buildings. There are no improvements proposed below the bluff, but the existing
stormwater pond will be improved and repaired. A sidewalk will also connect the site to the sidewalk along Zane
Street.
Parking
Ordinance requires parking to be provided at 2.5 stalls/unit — one of which must be within a parking garage. The
project includes at least one covered stall per unit but does not meet the standard for total parking. The deviation
varies between phases but is above two-stalls/unit which has been approved in the past. The project also includes
multiple encroachments into the required parking setbacks. Staff suggested a few changes to improve site
access/circulation and snow storage for the newly proposed cul-de-sac. The setback encroachments can also be
approved as part of the PUD process.
Architecture
The materials proposed for the project are consistent with requirements for apartment buildings throughout the
city. The final design of the building will be refined as the project approaches permitting. The final design and
color selection will be improved in the PUD agreement which will be approved by the city prior to permit
issuance.
Environmental
Due to the location above the bluff along the Mississippi River there are additional requirements from the DNR.
Any deviations can be approved through the PUD process. Requirements of concern include impervious surface
limitations, bluff setback encroachments, and building height. Impervious surfaces are proposed at 26.7% - or
1.7% over the limit of 25%. Ordinance includes a 30-foot buffer from the top of a bluff, the proposed fire -lanes
will be removed, eliminating a majority of the encroachment concerns, but there are still a few encroachments
from parking and drive lanes.
Applicable Regulations
Zone Change
The property is consistent with the guidance from the Comprehensive Plan and Focused Area Study, both of
which guide the property for high -density residential uses. The project is consistent with the Comprehensive Plan.
Conditional Use Permit
In approving a Conditional Use Permit, the council may impose such specific conditions with regard to the
development or operation of the proposed use as it considers necessary to satisfy the seven standards set forth in
Section 30-654 and the requirements contained in this article and to promote compatibility with and minimize any
potentially adverse effects upon adjacent properties, the neighborhood or the city.
The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location:
WIN not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public
health, safety, morals, comfort, convenience orgeneral n elfare of the neighborhood or the city.
The property has been guided for residential uses since 2014. The guidance provides consistency with
other residential uses in the area in an effort to reduce impacts to other properties in the immediate
vicinity.
Staff does not see a need to impose specific conditions to satisfy this standard.
2. mill be consistent n4th the comprehensive plan.
The property is guided for FAST, which promotes high -density residential uses. The use will be consistent
with the comprehensive plan.
Staff does not see a need to impose specific conditions to satisfy this standard.
3. W1711 not impede the normal and orderly development and improvement of surrounding vacantpropery.
The surrounding properties are fully developed, with many already constructed as high -density residential,
and the proposal will not impede the normal and orderly development of surrounding vacant properties.
Staff does not see a need to impose specific conditions to satisfy this standard.
4. Weill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fare
protection, drainage, refuse disposal, n ater and sen er systems, parks and schools; and will not, in particular, create traffic
congestion or interference n4th traffic on adjacent and neighboring public thoroughfares.
Essential public facilities are available for the subject parcel so the use will be served adequately by and will
not adversely affect essential public facilities and services including streets, police and fire protection,
drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create
traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. The Park
and Recreation Commission has recommended additional trail easements along the bluff to support the
city's park and trail master plan.
Staff does not see a need to impose specific conditions to satisfy this standard.
5. WIN not involve uses, activities, processes, materials, equipment and conditions of operation that mill be detrimental to any
persons or propery because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations.
As the proposed use is guided by the comprehensive plan, the use will not involve uses, activities,
processes, materials, equipment and conditions of operation that will be detrimental to any persons or
property because of excessive traffic, noise, smoke, fumes, glare, odors, dust, or vibrations.
Staff does not see a need to impose specific conditions to satisfy this standard.
6. Weill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance.
The Wild and Scenic standards for projects along the Mississippi River include numerous requirements for
projects along the river. Some of these have been discussed earlier in the staff report. Regulating authorities
understand that areas in urbanized sections of the river should be treated differently than undisturbed areas
and as such, some deviations can be supported.
Staff has included a requirement that comments from the comment letter be addressed prior to recording.
7. mill fully eo*ywitb all other requirements of this Code, including any applicable requirements and standards for the
issuance of a license orpermit to establish and operate the proposed use in the city.
The PUD process provides an opportunity for deviations from strict ordinance standards. These have been
discussed and any additional deviations will be identified in the PUD agreement to be approved by the city.
Included conditions of approval address deviations from city codes.
If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a
report stating how the proposed use does not comply with the standards set forth in Section 30-654.
Financial Impact
None
Mission/Policy/Goal
■ Responsibly grow
■ Meet changing needs - Agile
Attachments
■ Location Map
■ Applicant's Narrative
■ Site Plans
■ Architectural Plans and Renderings
■ Comment Letter dated February 26, 2021
S�CO3 4403
4pp
1
75-00 :3:310
175-73315
}. d )INw '1
k+ -
a
Stone`vood Development
3 +7'1'y =vx+
k
Case No: ZC 2 1 -0 1
PE 2 1 -01
ClJ 21-03 Eli
EV 21-02 Kivu
' DALE BUCHHOLZ
�J CONSTRUCTION
January 25, 2021
City of Elk River
Attn: Zech Carlton, AICP
13O65 Orono Parkway,
Elk River, MN 55330
Dear Zachary,
For your review are Dale Buchholz Construction/Stonewood Development's application items for the Conditional
Use Permit (CUP), Zoning Change, and Plat for the property located at 17354 Zane Street, Elk River 55330.
Provided below are a list of contact information including nome(s), address(s) and phone number(s) of the: owner
of record, authorized agents or representatives, engineer, surveyor, and any other relevant associates.
Owner of Record:
Patrick Briggs
Sun Rae Apartments, LIE
PO Box 719, Big Lake MN 55309
(612) 919-1561
patIthehripgscompanies.com
Prospective Buyer/ Developer:
Mark Buchholz
Stonewood Development, LIE
4379 33" Avenue South, Suite 121, Fargo, ND 58104
(701) 371-1646
mdhuchholzNmail.com
Architecture:
Rhet Architecture (Rhet Fiskness)
27 II`h Street North, Fargo, ND 58102
(701) 388-2867
rhet5rhet-nrrhr.nm
Surveyor:
Craig Wensmann, PIS
Bogart, Pederson 6 Associates, Inc.
13076 First Street
Becker, MN, 55308-9322
(763)-262-8822
cwensmannLbouart-uederson.com
Civil Engineer:
Wayne Stark, P.E., LEED AP BD+C
Stark Engineering, LIE
13070 Ist St, Becker, MN 55308
DALE BUCHHOLZ
,i CONSTRUCTION
Way nes9starkengineer.com
Narrative:
Stonewood Development is proposing to continue to build on the concept and vision that the Briggs Companies had
previously been pursing for the redevelopment of the former Saxon Motors site. The Saxon site's scenic Mississippi River
views, excellent access to both the light rail and major commuter roads, and amenities within close proximity make the land
a natural site for residential multifamily housing. The project the Briggs Companies recently submitted calls for the
following improvements: (for reference purposes the Briggs Companies' application has been included as an
addendum to this narrative)
"It is our [Briggs Companies] intent to construct 2 phases of a New 89-unit, 4 story Apartment
Building consisting of 58-- Studios, 84--1 Bedroom Suites and 36-- 2 Bedroom Suites.170 Total
Units. 1st -4'h floor exterior fagade would include a combination of Horizontal 6 G" EDCD Steel
siding 8 Cultured Stone. Aluminum Trim Coil for Accents on all balconies to include Steel
Railings and Maintenance free decking, with a privacy wall on each balcony. All Trims including
Garage doors, soffit, facia, to include Aluminum Wrap Accents. 180 indoor parking stalls,180
uncovered parking stalls."
Stonewood Development's intentions are to maintain virtually the same site layout as well as the building
footprint(s) and orientations found in the Briggs' site plan. It is our understanding that the site currently operates
within the comprehensive plan set forth by the city of Elk River, but will require a conditional use permit along
with a PUB approval. The buildings will provide contemporary feel and he aesthetically enhanced through varying
parapet heights and wall depths, as well as through the use of timeless materials and colors. The building
interiors will offer common area amenities such as a Wi-Fi lounge and a coffee bar, which will promote positive
interaction among the residents and enhance their overall living experience. The secured entrances and video
monitored entry points will provide reassurance of a secure living environment for the residents. The unit
interiors will feature spacious open floor plans with designer -driven finishes, as well as other notable upgrades
such as 9 foot ceilings, an elevator, quartz counter tops, stainless steel appliances, central air, LVT wood plank
flooring, tile back splashes, complimentary in -unit washer 6 dryer, private balconies, and on -site property
management. Stonewood Development is still in the process of evaluating the unit mix in the Brigg's proposal,
however similar to the Brigg's proposal the buildings will consist of a mix of efficiencies, I bedroom, and 2
bedroom units with the precise number of each still yet to be determined.
The Saxon site is truly a great example of what Redevelopment Tax Increment Financing programs was designed
to accomplish as this redevelopment project would be economically unfeasible but for Tax Increment Financing.
That being the case Stonewood Development's desire to complete the redevelopment is conditioned on receiving a
Redevelopment TIF with terms similar to the Briggs Companies' request which included "a 26 year redevelopment
TIF project at a 90% capture rate." Together Stonewood Development with the assistance of the City of Elk River
will transform what has been a blighted site for several years into what will truly be an impressive development
for the entire city of Elk River. Research has shown that there is strong demand within the Elk River market for
this type of housing and the project itself will be a catalyst for local economic growth as a result of the labor and
AA
' DALE BUCHHOLZ
CONSTRUCTION
material that will be sourced locally. With forty years of past experience the Buchholz group is well positioned to
successfully complete a project of this magnitude and importance. Their history and ongoing commitment to
constructing quality buildings and management will provide the residents with a superior living experience.
Stonewood Development would like to thank everyone involved for their time and consideration as well as for the
opportunity to he a part of the growth of Elk River
\THE
\\\ CROSSINNADS
\ I EARKNG BUILDIN
G
\ ------
— — RLGEE I —A`
-- — -t-- G _F_
v 11y 100 FT SETRACK FROM
\ EKA GN 2
v EL .I BGGNGARr
11 I
WOODED V 111\ I )
- - - - - - - - - - - � -- --- ----
1-
\
CROSSROADS \ V I 1
I
------ \\\A \ \
A- ,
--------------- \, \\\\
VFFA
TRACT C V �`
BLOCK 1 N N
\\
-1\--------------- \
--- ---
� 7 �---CURB & GUIEER
L, BIrt1 RGUS PARKING
1 I
10G YR NBASE FF oRD— -- 1 \ /
EL-8628 (NAW 88) \ e /
P� \
WOODED \
� F. A '
11 FT TO" OF
BWFF SELBACK
\ LTIT
I
k IF AN LOGU._\ 1
. TELEV, ,8 A
BARKEI
TT T,
' 1
I
I
(
i
� I
BGuw ER
cAR
RE�AiwAA_
RAr�P ALL
1
BLOCK 2 3E
�a�uo�S11 L nry
w
— carvc�aEw�(rva)
%oirv6
EXIT BUILDING
ROOF=906.66
FIF—
uorE w16siN6c6ie tww
— — — — — — — — — -- — — — — —
BNLory
I SECONDS ADDITION
RE
,GP �E K �=.�rvG o�Nrvo
BLBF —__ �
La,
11 (
If >F
E
NA IAIIRKIN,NG AR A I —,_�
(N
—
B.
ELEI — 893,7\
A S i
ELETNI
E,
�F
E
*ro,
•Ills yawl
o
NOTES:
1. BASE PLAN USED IS A SURVEY PREPARED BY BOGART, PEDERSON
-
& ASSOCIATES.
=s P@
2, ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE
-_ _
APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS
AND ELEVATIONS PRIOR TO CONSTRUCTION, CONTRACTOR SHALL
-mv`
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE —CALL
ONLINE OR BY CALLING 811 OR 1-800-252-1166.
3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE
-
OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS
OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT
_
STANDARD SPECIFICATIONS FOR CONSTRUCTION.
Xi
J
a
(N
z
ZO
H
Vl z
w8
w
zQ �
0
�o 0
�w
w
�z >
�z w
Q�
0
Y w O
Q w
W:
-
w Z
> J .. O
wwu° Vl
REVIEW PLAN
= C_1
NOT FOR CONSTRUCTION
o
•� 1 �^� i _ENCLOSURE i'eiTUMwous ( A
vnU�RETE `
1T TTS'ED .�.. I I I I I I I I ^I\ I
\ I I ® LT • xll vwaa �
OF
I \
SOFww
� B30 FT TOPLUFF SETDATIK�—� ,aw pT=E go� �V � as.o=
PHASE 20 T_
1 ` 89-UNIT \ o --EMEv = 893.1E
ELEVATION OUNDART APARTMENT 1\
1 BUILDING
1 1 I A-E-822 SF �a
I
wooDEO TT =879.50
I J L
w( '� \
A "
FE
FNULUXN 1 aOIN �. m
----- �.�
voe
B sE NoaRoD
ELIVAT
_
EL=asze (nOiw 887 I\ \j ( _—
_ _— C)
E, t4 \ _ EaaED—
� f WOODED R TT „Ta I — eesz
�✓� 1 L�.R aCUPB
6
BLUFF SETBACK— 1 ass aoavc nceFr rzo' I sc ixri�.annox easry II I
o
I
PHASE 1
\ L' I ` APARTMENT c /
% BUILDING S
V 1 1 1 A-27,743 SIF / DJ
Ii 11 I PPE-887.00
GCE=878.50
A a , /
TNr1
LEv
' \ nn H v NS m / �r 890.00
777
I �
�k
I 1
P �F BLUFF___ I e a NT, R 1�
A
NOTES:
1, BASE PLAN USED IS A SURVEY PREPARED BY BOGART, PEDERSON
& ASSOCIATES.
2, ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE
APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS
AND ELEVATIONS PRIOR TO CONSTRUCTION, CONTRACTOR SHALL
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE —CALL
ONLINE OR BY CALLING 811 OR 1-800-252-1166,
3, ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE
OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS
OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF ARCOT
STANDARD SPECIFICATIONS FOR CONSTRUCTION.
4, EXISTING ZONING: FOCUSED AREA STUDY (FAST).
PROPOSED: PLANNED UNIT DEVELOPMENT (PUD).
IMPERVIOUS SURFACE AREA (SF)
RIVERWALK
ARTS
RIVERWALK
ARTS 2
TOTAL
EXISTING
130, 009
60,711
190, 719
PERCENT
64. 47.
15.87.
32.57.
PROPOSED
74, 397
82, 225
156, 522
PERCENT
32. 29
23.27.
26.77
LOT AREA
231, 056
355,172
586, 228
PARKING STALL COUNTS
RIVE R WALK
APTS
RIVERWALK
APTS 2
COVERED
90
90
SURFACE
100
103
TOTAL
190
193
UNITS
89
89
RATIO
2,13
2,17
REVIEW PLAN
NOT FOR CONSTRUCTION
z
J
z
z
Q
J
N Z)
C-2
� a a 'i , � i i ' i it i I, i I '�, III(\III i II it O�i( J'�>•' i �������rt�� � r_ei uMiNous �� �a >>>�\ � A
I
Ilk
l ii�lii yin , ��
a moo_ w ill ����u��A�LY�� A— ,� _-- _ _�\
�� ��1 �1 ��}�oEV
i
o
F, ii �� ' ii i I ' � �0,
E, ' i i i l ii 1 ��A�V1,,,,, I DEE!
Ali
-
\ , PHASE 2 - fl, BM VNH 0
I I \ 89-UNIT _
\
l , , E1 1 NOA NFAFPARTMENT
BUILDING
/ "a��1
NOTES:
A-27,822 sIr
- 1. BASE PLAN USED IS A SURVEY PREPARED BY BOGART, PEDERSON
`Y a 79. WOODEKv l , a N l I l l�i A OFE-8
& ASSOCIATES.
IF
Z,� 2, ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE
APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS
AND ELEVATIONS PRIOR To coNSTRucTION, CONTRACTOR SHALL o
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE —CALL R
HE ,rye, - .��� ONLINE OR BY CALLING 811 OR 1-800-252-1166, ag
W
3, ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE °
��\ \ \ ( OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS s33
OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT a
STANDARD SPECIFICATIONS FOR CONSTRUCTION. IS
wm
a ao-asoHDPI
'�ssv
z�
4. THE FOLLOWING SEQUENCE AND PROTOCOLS SHALL BE FOLLOWED
d )
s a.x
s�� �.o si � FOR EROSION AND SEDIMENT CONTROL DURING THE SITE
♦ v— _F ,� DEVELOPMENT PROCESS:
o e L, off " ( A. INSTALL PERIMETER CONTROLS (SILT FENCE & ROCK
AHZ
wee — — ( CONSTRUCTION ENTRANCE) AS SHOWN ON THE PLANS PRIOR
TO START OF WORK.
I � \
w<s, ry,v B. SOIL STOCKPILES OR CONCRETE WASHOUTS ARE NOT ALLOWED
ON THE PPOJECT SITz
E"
C. MAINTAIN ALL TEMPO ARY EROSION CONTROL DEVICES IN PLACE p L R 0
WOO ) "v ass.° _ �._<_` aa��a az UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN jrZ
fs „� -i - STABILIZED. INSPECT TEMPORARY EROSION CONTROL DEVICES W J
ON A WEEKLY BASIS AND AFTER EACH 112" OR MORE RAIN Ad Q-
Y ) <H _ I EVENT. CLEAN OR MAINTAIN THESE DEVICES AS NEEDED TO BE J
�V e -sox sae, od so _ I ) EFFECTIVE. REPLACE DETERIORATED, DAMAGED OR ROTTED Z
w EROSION CONTROL DEVICES IMMEDIATELY,Ei
I D. REMOVE ALL SOILS AND SEDIMENTS DEPOSITED ONTO PUBLIC Q Z
AND/OR PRIVATE PAVEMENT AREAS WITHIN 24 HOURS OF 0 0U
DEPOSITION. REMOVAL OF TRACKING MATERIALS SHALL BE
s �i) PHASECOMPLETED AT THE END OF EACH WORK DAY WHEN IT
APARTMENT OCCURS. SWEEPING MAY BE ORDERED AT ANY TIME IF
a BUILDING CONDITIONS WARRANT.
A-27,743 SIF .J,: R° �T? E PERFORM SITE REMOVALS, GRADING, EXCAVATION AND
IFFE 887W EMBANKMENT. SEED AND MULCH ALL DISTURBED AREAS
878.50
�_ A"S OUTSIDE OF PROPOSED PAVEMENT AND BUILDING AREAS WITHIN
72 HOURS OF THIS WORK
'W F. INSTALL BUILDING AND BITUMINOUS PAVEMENT SECTION. FINE z
�,N GRADE SITE AND RESTORE GREEN AREAS WITH PERMANENT w � EEva" VEGETATION PER LANDSCAPE PLANS. z Q
o �G. STORMWATER BAPS SHALL NOT BE EXCAVATED TO FINAL 5 O O r — GRADE UNTIL CONTRIBUTING DRAINAGE AREA HAS BEEN -w w
I% ,I CONSTRUCTED AND FULLY STABILIZED, E z >
H. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL d z o
DEVICES AFTER SITE HAS UNDERGONE FINAL STABILIZATION Q
AND PERMANENT VEGETATION HAS BEEN ESTABLISHED WITH AT o
LEAST 70% COVERAGE 0
�> w
> J .. 0
67w °v,
REVIEW PLAN
a„ i — NOT FOR CONSTRUCTION C-3
ISILT TE �HED
\ I I T
\ I
\ I \T \
I
I
sETaO
I
OF
i 1 uFF re
ELEVATION DOUNDAR
DD R D ASE FLDDD--�
WOODED V\ I 1
_----___ _
---}--- T
100 HE BASE FLOOD
I xn.vemm�nwxnnenm ngwix
I �
#- s
ELEVATION BOUNDARY --
EL-ssze nuAw aaJ
I S
� � WOODED —11"., r I
I
✓ e° FF TOR
IIL AIH
I �y
IERVCEA NorLF
-
LF
eeY
� es�s�a;fsss
4'sss
TOP �F aLgFF-_ F5
I
F4i ..... 11
I
I
�ltjIL"-t yv
° L-_L1 - VA\\\ VA
=19 TRACT C
--
---------------
PHASE 2
89-UNIT
APARTMENT
BUILDING
A=27,822 SF
FFE=890.00
GFE-879. 50
PHASE 1
'
-
=9k4PS4r✓X„,',;;
89-UNI7
APARTMENT
BUILDING
A=27,743 SF
FFE=88T.00 E
f
GFE=8T6. 50
—_
I I
III II
—
I� O
r„rr
yvy� v
/ 4E11
/
ELEV H
s / I
A4�, \S uH 1I3\
PLANTING LEGEND
�sDDEDLAwN
LANE
ROCIEEIc reDED ovEreWEED DArereIEre
FRE
E�rvoreosEEDeD LAwN
N70SRACTOR IHALL EE COME FAMILIAR WI TH
Exls.wrec
THE LOCAL ON OF ALL e AND Eu.ureE urvoearelc ourvD serevEs� ANDND
OTHER DELETERINUI MATERIAL
ED G=D E Co MMEM C FAT CGTRU tE E PVC EDGING INITALL EDGING LEVEL ME EVEN PER NORMAL INDUITRI ITANDARD1 AND RE
.RIRTE oRNN.ERPLANTNRNNTRACTORNRRRREIT-MEI,RNNR.NTRIEERRENECE�NRIND
NDLNDEC EEADreICEDreAPPreDVAL A,DT OVENLANDEC E
a6wEED�ArereIEDEEreIC=DDMIT=AMPLEDEreDCIE
ECOMMENDEDDVMANDEACTDreEre RPERENNA,IORIDROVEDEQUALPREEMERGENTHERBCDEAPPLEDATRATE=
a z >
DED1TO
RECEIVE 4DEPTH -EDDEDCEDAR WOOD MULCH RENDCATEDDELOw
PLANTING DEDIMEL-NAREAE
LMD'CAPE ARCH TECT'ITEOre,AODBE CONI IDERE
RE PLA
FOR APEreODALILEARUPON COMPLETION OFPLANTING
DEAD R'DBEREPLACENT ED NTRACTORCONTRACTOR IHALLGURFANTEED
RE P
EAR DO AD
a 3
z w
> o
�
N AD " NET ' TO YTR` DART ' L—N AREA'
IURFACEI
osubdrvDiseo IV. Sec. "30;934-"Landscaping,
TO BE OF GAT ED W THPo Up 'PRAYHE"'oToR' 'TRUE BED' To BE
,1la11—Mm^Dmum—.1-1mee e5",""":m""�„"e�"11 e��m"e ev 41.
GRAPHIC SCALE
REVIEW PLAN
NOT FOR CONSTRUCTION
HER
HANSON
DRAFTED BY
JH
FACE— BY
JH
DIE
1-26-21
RR
21001DE
L1
ISILT TE �HED
\ I I T
\ I
\ I \T \
I
I
sETaO
I
OF
i 1 uFF re
ELEVATION DOUNDAR
DD R D ASE FLDDD--�
WOODED V\ I 1
_----___ _
---}--- T
100 HE BASE FLOOD
I xn.vemm�nwxnnenm ngwix
I �
#- s
ELEVATION BOUNDARY --
EL-ssze nuAw aaJ
I S
� � WOODED —11"., r I
I
✓ e° FF TOR
IIL AIH
I �y
IERVCEA NorLF
-
LF
eeY
� es�s�a;fsss
4'sss
TOP �F aLgFF-_ F5
I
F4i ..... 11
I
I
�ltjIL"-t yv
° L-_L1 - VA\\\ VA
=19 TRACT C
--
---------------
PHASE 2
89-UNIT
APARTMENT
BUILDING
A=27,822 SF
FFE=890.00
GFE-879. 50
PHASE 1
'
-
=9k4PS4r✓X„,',;;
89-UNI7
APARTMENT
BUILDING
A=27,743 SF
FFE=88T.00 E
f
GFE=8T6. 50
—_
I I
III II
—
I� O
r„rr
yvy� v
/ 4E11
/
ELEV H
s / I
A4�, \S uH 1I3\
PLANTING LEGEND
�sDDEDLAwN
LANE
ROCIEEIc reDED ovEreWEED DArereIEre
FRE
E�rvoreosEEDeD LAwN
N70SRACTOR IHALL EE COME FAMILIAR WI TH
Exls.wrec
THE LOCAL ON OF ALL e AND Eu.ureE urvoearelc ourvD serevEs� ANDND
OTHER DELETERINUI MATERIAL
ED G=D E Co MMEM C FAT CGTRU tE E PVC EDGING INITALL EDGING LEVEL ME EVEN PER NORMAL INDUITRI ITANDARD1 AND RE
.RIRTE oRNN.ERPLANTNRNNTRACTORNRRRREIT-MEI,RNNR.NTRIEERRENECE�NRIND
NDLNDEC EEADreICEDreAPPreDVAL A,DT OVENLANDEC E
a6wEED�ArereIEDEEreIC=DDMIT=AMPLEDEreDCIE
ECOMMENDEDDVMANDEACTDreEre RPERENNA,IORIDROVEDEQUALPREEMERGENTHERBCDEAPPLEDATRATE=
a z >
DED1TO
RECEIVE 4DEPTH -EDDEDCEDAR WOOD MULCH RENDCATEDDELOw
PLANTING DEDIMEL-NAREAE
LMD'CAPE ARCH TECT'ITEOre,AODBE CONI IDERE
RE PLA
FOR APEreODALILEARUPON COMPLETION OFPLANTING
DEAD R'DBEREPLACENT ED NTRACTORCONTRACTOR IHALLGURFANTEED
RE P
EAR DO AD
a 3
z w
> o
�
N AD " NET ' TO YTR` DART ' L—N AREA'
IURFACEI
osubdrvDiseo IV. Sec. "30;934-"Landscaping,
TO BE OF GAT ED W THPo Up 'PRAYHE"'oToR' 'TRUE BED' To BE
,1la11—Mm^Dmum—.1-1mee e5",""":m""�„"e�"11 e��m"e ev 41.
GRAPHIC SCALE
REVIEW PLAN
NOT FOR CONSTRUCTION
HER
HANSON
DRAFTED BY
JH
FACE— BY
JH
DIE
1-26-21
RR
21001DE
L1
II
FL
T'"YOTAc: -$N
L
ZJ
IST FLOOR
BASEMENT
:AA
STA.-
:STB•
�STB`
0
1B
1C _
1C {
'', 0
2B
2A
_.
Fr
2B
3
tw
1E
_
c
; 'ems-
t:?
2ND FLOOR _
_ - ' _, FLOOR 3,4 = -
Riverwalk
Elk River, Minnesota
$:. dot
t
J
r
ql
�1
��i
City of
EIk ;z,;
River
13065 Orono Parkway
Elk River, MN 55330
February 26, 2021
Stonewood Development, LLC
Mark Buchholz
4376 33Td Avenue S, Suite 121
Fargo, ND 58104
VIA EMAIL: mbuchholz@gmail.com
RE: Zone Change, Conditional Use Permit Application, Easement Vacation, and Plat.
Dear Applicant,
Thank you for your submittal on January 25, 2021. Staff has reviewed the plans and drawings and
have the following comments.
Please address these comments in a response letter and on future submittals:
General Comments:
1. The Parks and Recreation Commission reviewed the project on February 10, 2021 and
recommends Park Dedication be satisfied through cash dedication and a trail easement along
the top of the bluff. The City Council also discussed capping park dedication at $500,000 for
large multi -family projects. This will be updated via ordinance later.
■ Add the trail easement to the plat and site plans in an updated plan set.
2. A formal access agreement for the shared driveway to Zane Street will be required.
Staff can review this prior to releasing the plat for recording.
3. The minimum parking setback is 10' from property lines. There are numerous locations
where this setback is not met. The deviation can be approved by the Planning Commission
and Council through the PUD process. Changes to the submitted site plan may be required
after their review.
4. Ordinance requires 2.5 parking stalls per unit, or 223 spaces for each of the two phases.
Submitted plans identify a deficiency with both phases — 2.13 stalls/unit for phase one and
2.17 stalls/unit for phase two. The deviation can be approved by the Planning Commission
and Council through the PUD process. Changes to the submitted site plan may be required
after their review.
5. Ordinance requires one covered parking stall per residential unit. The proposed
development meets this standard.
Phone: 763.635.1000
POWERED 11`14A
www.ElkRiverMN.gov
6. Submit lighting plans for review and comment. Review and approval of the lighting plan must
be done prior to recording the CUP or releasing the plat for recording.
7. Staff approval of material/color selections along with final building elevations will be
required prior to recording the CUP or releasing the plat for recording. Disagreements
between staff and the applicant will be discussed with the City Council as part of the
approval for the PUD agreement.
8. Proposed signage must be included on final site plans and elevations.
9. As both buildings proposed to be sprinkled, the fire lanes along the back of building are not
required. The fire lanes should be removed to accommodate the recommended trail
easement from the park and recreation commission.
■ Please address this change on future updates.
10. The existing stormwater pipes that convey water from Zane Street through the site must
remain in a drainage and utility easement.
■ Update the plat to include the appropriate drainage and utility easement.
11. A formal agreement for the proposed shared storm sewer system between the two
properties must be formalized in an easement and agreement.
■ Staff can review this prior to releasing the plat for recording.
12. Please submit a turning radius exhibit demonstrating a right -turn from the north exit
for the parking lot in front of phase 2.
13. Eliminate the northern most parking stall from the lot in front of phase 2 (includes a
number "9") and the eastern most stall in the lot north of phase 2 (includes a number
"17). Adjust the curb and sidewalks appropriately. There should be as much buffer as
possible between the R/W and the sidewalks to accommodate snow storage for the
cul-de-sac.
14. Stormwater management requirements need to be met as listed in Ordinance Sec. 78-503.
- Stormwater and urban runoff control. and Sec. 78-504. - Post construction
stormwater management for proposed impervious surfaces. http://mn-\
elkriver.civicplus.com/Document Center/View/3180.
■ The stormwater plans continue to be reviewed by the engineering department
and additional comments may follow when their review is complete.
15. Submitted plans note that proposed hardcover is 26.7%. City ordinances limit the
hardcover to 25% for areas within the wild and scenic river district. The deviation can
be approved by the Planning Commission and Council through the PUD process.
Changes to the submitted site plan may be required after their review.
16. Section 30-2022 requires a 30-foot setback from the top -of -bluff. Plans identify
parking and drive lane setbacks into this easement. The deviation can be approved by
the Planning Commission and Council through the PUD process. Changes to the
submitted site plan may be required after their review.
Additional comments provided by MnDOT are attached and need to be addressed as part of an
approved project. Unaddressed comments may be included as conditions for approval. Staff
reserves the right to continue review of all site, building, grading and utility plans
Thank you, and please let me know if you have any questions.
Sincerely,
Zack Carlton, Planning Manager
763.635.1035
DEPARTMENT OF Metropolitan District
Waters Edge Building
TRANSPORTATION 1500 County Road B2 West
Roseville, MN 55113
February 19, 2021
Jennifer Green
Senior Administrative Assistant
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
SUBJECT: MnDOT Review # P21-008
Stonewood Development
NW Quad US 10 & 173rd Avenue
Elk River, Sherburne County
Dear Ms. Green:
Thank you for the opportunity to review the plat and plans for Stonewood Development. MnDOT
has reviewed the documents and has the following comments:
Noise:
MnDOT's policy is to assist local governments in promoting compatibility between land use and
highways. Residential uses located adjacent to highways often result in complaints about traffic
noise. Traffic noise from this highway could exceed noise standards established by the Minnesota
Pollution Control Agency (MPCA), the U.S. Department of Housing and Urban Development, and
the U.S. Department of Transportation. Minnesota Rule 7030.0030 states that municipalities having
the authority to regulate land use shall take all reasonable measures to prevent the establishment of
land use activities, listed in the MPCA's Noise Area Classification (NAC), anywhere that the
establishment of the land use would result in immediate violations of established State noise
standards.
MnDOT policy regarding development adjacent to existing highways prohibits the expenditure of
highway funds for noise mitigation measures in such developed areas. The project proposer is
required to assess the existing noise situation and take the action deemed necessary to minimize the
impact to the proposed development from any highway noise.
If you have any questions regarding MnDOT's noise policy please contact Natalie Ries in Metro
District's Noise and Air Quality Unit at 651-234-7681 or Natalle.Rleskstate.mn.us.
Bicycle/Pedestrian:
This property falls within a Sherburne County Proposed Trail Corridor. The applicant should
coordinate with Sherburne County to determine the appropriate location for a trail on this property
An equal opportunity employer
MnDOT Metropolitan District, Waters Edge Building, 1500 County Road B2 West, Roseville, MN 55113
and to ensure development and fire access do not prevent future trail construction. Public access
points between the trail and Zane St NW should also be considered.
For questions regarding these comments, contact Jesse Thomsen, Metro Multimodal, at
Jesse. Thomsengstate.mn.us or 651-234-7788.
Water Resources:
Assuming the portion of Zane St/Yale St where the cul-de-sac is proposed will have curb and gutter,
no drainage permit will be required as all drainage runs towards the river and away from MnDOT
right-of-way. If this is not correct then a drainage permit will be required.
For questions regards these comments, contact Jason Swenson, Metro Water Resources, at
jason.swensongstate.mn.us or (651) 234-7539.
Permits:
As mentioned above, a drainage permit would be required if the cul-de-sac does not have curb and
gutter. Additionally any use of, or work within or affecting, MnDOT right of way will require
permits.
Permits can be applied for at this site: hllps:Holpa.dot.state.mn.us/OLPA/. Please upload a copy of
this letter when applying for any permits.
Please direct questions regarding permit requirements to Buck Craig of MnDOT's Metro Permits
Section at (651) 775-0405 or Buck. Crai g(2state.mn.us.
Review Submittal Options
MnDOT's goal is to complete reviews within 30 calendar days. Review materials received
electronically can be processed more rapidly. Do not submit files via a cloud service or SharePoint
link. In order of preference, review materials may be submitted as:
1. Email documents and plans in PDF format to metrodevreviews.dotkstate.mn.us.
Attachments may not exceed 20 megabytes per email. Documents can be zipped as well. If
multiple emails are necessary, number each message.
2. PDF file(s) uploaded to MnDOT's external shared internet workspace site at:
https://mft.dot.state.mn.us. Contact MnDOT Planning development review staff at
metrodevreviews.dot(2state.mn.us for uploading instructions, and send an email listing the
file name(s) after the document(s) has/have been uploaded.
If you have any questions concerning this review, please contact me at (651) 234-7797.
Sincerely,
Cameron Muhic
Senior Planner
MnDOT Metropolitan District, Waters Edge Building, 1500 County Road B2 West, Roseville, MN 55113
Copy sent via E-Mail:
Buck Craig, Permits Lance Schowalter, Design
Jason Swenson, Water Resources Ashley Roup, Traffic
Jennifer Wiltgen, Area Coordinator Michael Lynch, Right -of -Way
Mackenzie Turner Bargen, Multimodal Jesse Thomsen, Multimodal
Russell Owen, Metropolitan Council Natalie Ries, Noise and Air Quality
MnDOT Metropolitan District, Waters Edge Building, 1500 County Road B2 West, Roseville, MN 55113
iver
Ordinance 21 -
Stfikethfoughs to be removed
Underlines to be added
An Ordinance Amending the Zoning Map of the City of Elk River, Minnesota, to
Rezone Certain Property from FAST (A) to Planned Unit Development (PUD)
The City Council of the City of Elk River does hereby ordain as follows:
SECTION 1. That the duly adopted Zoning Map of the City of Elk River is hereby amended to
rezone the property described on attached Exhibit A to Planned Unit Development (PUD):
SECTION 2. That the rezoning approved by this Ordinance is based on the following findings:
1. The rezoning is consistent with the City of Elk River Land Use Plan adopted as
part of the City of Elk River Comprehensive Plan.
SECTION 4. That this ordinance shall take effect upon adoption and be published as provided by
law.
Passed and adopted by the City Council of the City of Elk River this 15th day of March, 2021.
John J. Dietz, Mayor
ATTEST:
Tina Allard, City Clerk
Last Updated Januaic= 2019
Stfikethfoughs to be removed
Underlines to be added
Exhibit A
Lots 1 and 2, Block 1, THE CROSSROADS, Sherburne County, Minnesota
And
Lot 1, Block 2, THE CROSSROADS SECOND ADDITION, Sherburne County, Minnesota
Last Updated Januaic= 2019
C' liry pry°
EIk
River
City of Elk River
City Council
Resolution 2 1 -
A Resolution of the City Council of the City of Elk River Granting a Petition
to Vacate Public Right -of -Way Easements and Drainage and Utility
Easements, Case No. EV 21-02
WHEREAS, a petition has been made by the adjacent property owner to vacate the public
rights -of -way described in Exhibit A, and drainage and utility easements in Exhibit B,
attached hereto; and,
WHEREAS, a public hearing on said petition was held on March 15, 2021, before the City
Council of the City of Elk River after published and posted notice had been given, and all
persons interested were given an opportunity to be heard at the public hearing.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk
River, Minnesota, as follows:
1. The petition to vacate the public right-of-way described in Exhibit A is hereby
granted based upon the following Findings of Fact:
a. Minnesota Statutes, Section 412.851, allows for the vacation of public right-
of-way easements if it appears in the interest of the public to do so.
b. The vacated portion does not prohibit public access along Zane Street
and improves public mobility by facilitating development of a cul-de-sac.
c. Vacation of the easements allows development of the vacant surrounding
parcels as one project.
d. Therefore, the City Council finds vacation of the right-of-way easements
to be in the public interest.
2. Vacation of the public right-of-way easements described in Exhibit A shall be
effective at the time of recording of the document.
3. The drainage and utility easements described in Exhibit B are hereby vacated as
they are no longer needed or will be replaced with the recording of the plat of
The Delta.
Passed and adopted this 15th day of March 2021.
John J. Dietz, Mayor
ATTEST:
Tina Allard, City Clerk
Exhibit A
That part of Yale Street as platted in THE CROSSROADS (and as described in Doc. No.
189867 being over, under and across part of the South 830.55 feet of Government Lot 1 of
Section 3, Township 32, Range 26) and that part of Zane Avenue as platted in THE
CROSSROADS SECOND ADDITION, Sherburne County, Minnesota, to be vacated lying
westerly of the following described line:
Commencing at the northeast corner of Yale Street as platted in THE CROSSROADS;
thence North 90 degrees 00 minutes 00 seconds West on an assumed bearing along the
north line of said Yale Street a distance of 58.57 feet to the point of beginning of the line to
be described; thence South 20 degrees 05 minutes 13 seconds East, parallel with the easterly
line of said Yale Street, a distance of 413.98 feet; thence 252.18 feet southerly, along a
tangential curve concave to the west, having a radius of 229.15 feet and a central angle of 63
degrees 03 minutes 11 seconds to the intersection of the westerly right of way line of Zane
Avenue as platted in THE CROSSROADS SECOND ADDITION and said line there
terminating.
Street Vacation Exhibit
for
Plat of THE DELTA
\ \ STREET VACATION DESCRIPTION,
\ 7hot port of Yale Street as platted in 7HE CROSSROADS
(and as described in Doc. No. 189867 being over, under
NE COR. OF YALE ST. I and across part of the South 830.55 feet of Government
\ AS PLATTED IN THE I \ Lot 1 of Section 3, Township 32, Range 26) and that
CROSSR_OADS_— part of Zone Avenue as platted in 774E CROSSROADS
_ _ _ _ _
< — — — SECOND AD01770N, Sherburne County, Minnesota, to be
r-NORT
\ H LINE OF THE CROSSROADS \ vacated lying westerly of the following described line:
\
\ Commencing at the northeast comer of Yale Street as
platted in 7H£ CROSSROADS; thence North 90 degrees 00
minutes 00 seconds West on an assumed bearing along
— the north line of said Yale Street a distance of 58.57
�58. 7 .,II \ \ feet to the point of beginning of the line to be
N 90°00 '00" Eq described; thence South 20 degrees 05 minutes 13
L — _ seconds East, parallel with the easterly line of sold Yale
I 55 Street, a distance of 413.98 feet; thence 252.18 feet
/ \ I southerly, along a tangential curve concave to the west,
.iAREA TO BE VACATED = ^, \ having o radius of 229.15 feet and a central angle of 63
\ y degrees 03 minutes it seconds to the intersection of the
westerly right of way line of Zone Avenue as platted In
\ a \ 7HE CROSSROADS SECOND ADD17ION and said line there
-------A I terminating.
---i
_7
' rt
`�- THE wILY R.O.W. OF
YALE ST. AS PLATTED \ I \
IN THE CROSSROADS00
N H \
�z
NE COR. OF LOT 1, — � \ � � m
BLOCK 2, THE v
CROSSROADS SECOND
ADDITION \\ I \N�
ili I'll /A,
\ ��z 0 \
THE WILY R.O.w. OF ZANE AVE.
AS PLATTED IN THE 9 v o
CROSSROADS SECOND ADDITION \ oz N
-
s----- I \ zc»
\
\ \ \ c,U1n
\
\ \ \ I O
\ U1
I \\ I I
�7-4b \
THE INTERSECTION —
WITH THE W'LY R.O.W. /
OF ZANE AVE.
\ I /
FIELD DATE: I hereby certify that this survey, plan, or
BK/PG: report was prepared by me or under my
DRAWN BY: CEG my direct supervision, and that I am a
CHECKED BY: CAW duly Licensed Land Surveyor under the
laws of the State of Minnesota.
REVISIONS:
��
Signed:
Craig A. Wensmann
Date: 1 /25 21 Lic. No. 47466
BOGART, PEDERSON
& ASSOCIATES, INC.
LAND SURVEYING
CIVIL ENGINEERING
MAPPING
13076 FIRST STREET, BECKER, MN 55308-9322
TEL 763-262-8822 FAX: 763-262-8844
STREET —VACATION 1 18-0060.00 1
FIELD DATE: I hereby certify that this survey, plan, or
BK/PG: report was prepared by me or under my
DRAWN BY: CEG my direct supervision, and that I am a
CHECKED BY: CAW duly Licensed Land Surveyor under the
laws of the State of Minnesota.
REVISIONS:
��
Signed:
Craig A. Wensmann
Date: 1 /25 21 Lic. No. 47466
BOGART, PEDERSON
& ASSOCIATES, INC.
LAND SURVEYING
CIVIL ENGINEERING
MAPPING
13076 FIRST STREET, BECKER, MN 55308-9322
TEL 763-262-8822 FAX: 763-262-8844
STREET —VACATION 1 18-0060.00 1
Exhibit B
All Drainage, and Drainage and Utility Easements in Lots 1 and 2, Block 1, THE
CROSSROADS, Sherburne County, Minnesota.
AND
All Drainage, and Drainage and Utility Easements in Lot 1, Block 2, THE CROSSROADS
SECOND ADDITION, Sherburne County, Minnesota.
LLc THE DEL TA
�M anmh�t hay p re p p nnnfinemlln g m p p eant�t ,nmec A shED sId"'O —1,Io°�" m g T
sxLxexca i% Raew
Lot:lanaT, eloae 1, THE caossaoADs, shemwnee y, �Me=ora (east .rxx xoxLriNr) I
AN
Lot y eltle aez,TxEtlCROSSROADS ed1d.
sEcoADDITION, THE Da ao h .11b
ELTA ariOWy 1.11Id e c e ose lmreve mews y :em®t a: ONA,
b Id
bbib
NT
1. -.1. whereof. -old The Del p mta LLe, .-dthe tomb I y III PILP11 Lffill h-C-E.1d, Dly 2 0—
Th,/ \ \
mocha DON e�m®t
S ATE OF COUNTYEso TA .1.OE �v.�nPer �'�
M 1
�Manmh_t hay p eblf;,bed p y y t gg. �,d®1,s-leApa�tn•e.tLLC,
e tore z —_ �
OLLvem°`x m
I,sl_ e — N ntedName v
MyCL
ware ,
9Bhf9 f A I ?'
CITY OF ELK RIVER
SHERBURNE COUNTY, MN
I herebyc tlhave.-yed andpla dine lmaor D"Lly supsnsetl me surveyingantl platfing ofine lma aesmbeaon this plat as THE DELTA, matthisplatisa
���me date ofw:een,fieaeon, all wn Iona: and watrebonnaane: and p �e y e:hownam labeletl as aefinea�n lwMe:old slamte:, semon sosol,
P>-R'x'11 \
'�
_
__-�
5�
Imo___________, _
eY .
\ ems',` T�
uxlrzD 111 AI ATV
1�
mUMe<om ucenae Numbre ma66
`V ` lax --
Een
\
�l- xwow IT I
\I
STATE OF
T
1 D-� 1B�8i
COUNTY of eENTON
o'a, 1 �\1
I� I
1Ls m'c
Lh,-gn�ngren-a :..no g emre�ne y _ y, g w®:mann,uc®reaLaws y,Mnne=ora
�\
- i
�\ IS Er APttss uscu[xr-1 / ,b8 / rrt'Pw me cBPsmuos
- N80'OObO'EI 8!7% 11 �"I �\ %-. .y �m��ix31, ••a _
Nora<y slgnatwe N ay meaNDne
MyCL. c.e®tnncn y,MlMeanm
CITY COUNCIL
HED
CITY Ih fy uyt prepre eNmcebIn e ®teay analh ype e th, pl. tL mknana w:eauon _ y
20
CITY FETTINDER
I h-y eNy ma®mis pl tvas beev y office ofine y g .Dated _ y ,
COUNTY SUDAEYOR
P- h CLdnty ONI-IONUU,b 006,Ih y eNfy matmis plat Nos be®meckeaavaapp,d-d as to cL,lI-,, im chapts 105, MUnn,.a S.
-mis
tansby fythOtm-dth. y - av esmbetl p In DID dmsearevotl q ttaxe d
COUNTY
oa e fy-w�5m,n EN—ddly aaeao omeeofu,e eonnty co eeo e y ,
/Nm nr wm'MT mE tRv
re OE coa•r LPr t sEP s I� _ s>tirE
(A. 1. x�Nnr L.xE P• a<ax 1. ..... VA- °BaxL,r� . , l ` o iE .
mE w°ssePAPs/ — �rrI��zPslz'\
y
;.....1..., s_o�v
9 I. ...::'1.1:•.::::
A.ABIX fyIM.IYTp5A5ExENrS \
rtn °�oPx� 3\ LOT j ONEm
`/�
' --asi. �TiTa3 xes•ss'z^E I� 3 sz�,yT x'N�YI
N bV! II 'l
xmrx a. n r I. •�mawacE s
U3_--'Ie GSEUFxrs rER mE �N
N °Bo ww°s sEroxP---� �s A
APanw a.x.A. sauix 1� 1� °raurtnNDxx
;.0 IxE LPr 2 BLaa I.+- °EAisn[n j " ^
.p irx: w°ssxWPs \ I
$R BLOCK ONE _1 1 '... ................::•:i) ..........o-i°io i�
WE
-
90Cn P
ihf
IBEEi
o
LOT TWO xP
\•III
x06 rA I
—A.
��\
l�a�n aT a rt�nEx�1 I
1
/
I
I
`1�9 :• 6 J C
:ii: C: is i•ii
1
n�y� [Baxdf£�uMli bl
m A
sea-_
11T
x 1 (an Inox uIER ox IT)
ou 3�T_. _ I' Eans°urx uxE OF set 3)
-0 JxvL mmlm.
NOT TO SCALE
FF
' x, tlepinn ne lo;
n mnn �ugenae nm�im Inaleneri
BARS OE BE __
v E. C&V=,ww)n n txe Yuln line TMEn ma Plot eroea ® m m non mmm mmummt
ammev Imam Deem
BOGART,, PEDERSON & ASSOCIATEA INO
City of
Elk
River
Resolution 2 1 -
A Resolution of the City Council of the City of Elk River Granting Plat
Approval for THE DELTA, Case No. PE 2 1 -01
WHEREAS, application has been made for plat approval, pursuant to Section 30-352 (c)
of the Elk River City Code of Ordinances, of the property legally described on attached
Exhibit A and hereinafter referred to as "the Property"; and
WHEREAS, the proposed final plat complies with each of the conditions set forth by the
City Council in its approval of the plat of the Property;
NOW, THEREFORE, BE IT RESOLVED
It is hereby determined by the City Council for the City of Elk River as follows:
A. The proposed subdivision is consistent with the Chapter of 30 of the City
Code of Ordinances and conforms with all of its requirements.
B. The proposed subdivision is consistent with all applicable general and
specialized city, county, and regional plans including, but not limited to, the
City's Comprehensive Plan.
C. The physical characteristics of the site, including, but not limited to,
topography, soils, vegetation, susceptibility to erosion and siltation,
susceptibility to flooding, and drainage are suitable for the type and density
of development and uses contemplated.
D. The proposed subdivision makes adequate provision for water supply, storm
drainage, sewage transportation, erosion control and all other services,
facilities and improvements otherwise required herein.
E. The proposed subdivision will not cause substantial environmental
damage.
F. The proposed subdivision will not conflict with easements of record or with
easements established by judgment of a court.
G. The proposed subdivision will not have an undue or adverse impact on the
reasonable development of neighboring land.
2. The officers of the City are hereby authorized to sign the final plat for the Property
and to issue a certified copy of this Resolution giving final approval of the plat.
The owner of the Property is authorized to record the final plat as required by law
and shall file proof of said recording with the City. No building permits will be
issued for the Property until the final plat is recorded.
4. This final plat approval shall expire two years from the date of this resolution if the
final plat is not recorded within that time.
Passed and adopted this 15Ih day of March 2021.
John J. Dietz, Mayor
ATTEST:
Tina Allard, City Clerk
i
EXHIBIT A
LEGAL DESCRIPTION
Lots 1 and 2, Block 1, THE CROSSROADS, Sherburne County, Minnesota
And
Lot 1, Block 2, THE CROSSROADS SECOND ADDITION, Sherburne County, Minnesota
i
Riverwalk Apartments
ZC, CUP, Easement Vacation,
and Plat
\ .�
� &
5 J1,14 0 10 5
7 .5 - 11 2�
�.\¥ . ��^ \Z \�\
A�w
,Stc-)neNv-(--)(--)d Develc-)pment
it
. .� \� �� �� \
-fl, T "- W
�7 -11 12
;;&W7.7R. 2134!
Case No: ZC 21 -01
PE 21 -01
CU 21-03 EI-L4k;--
EV 21-02 River
--
Background
■ Re -develop Saxon Motors site
■ Two 89-unit apartment buildings
■ 4 stories tall
■ Underground and Surface parking
■ Constructed in two phases
■ Vacate portion of Zane Street
■ Add cul-de-sac
■ Comp. Plan guides property for high -density residential
■ Rezone to PUD
■ Plat three existing lots into two
--�- ---—— —r---t
� HE
ExlrnNc �LDINC
I +
r—:--� _ -- -------
------�II ----1— _----ID FT TOP OF I---
�� BWFF 5—_
100 IT. 5E16A41( FROM � , } 2 ,r
IOO YR BASE ROOD���
ELEVATIQN BOUNDARY +
WOODED
I
CROSSROADS �� I ,
I
\
1
1 \
� 9M iNN
1 CAR RA
I 1 1 ` I FuavF riirnxc newuw �nT
I \
} M BLOCK 2
A �1�1'\
-----------------
TRACT C
i
BLOCK 1
,`--CURE k Gtl1 i�R 1
pIiUMItiOUS PARKING \
1
BO WAL
RETA,NING WARLP
�y
VASE R000
ELCVLEVATiPDN BOUNDARY
(NA�
--
I
WOODED
a�
r
\
t
n TRA�T D
V
`
FT 1oP
'1
BUFF sE>IBAcv<
U
'I �
ram- 1
I11
Eg511HC BVII.BINC
1
IYDRANT LOO\.—\
!
FFE.&60.88
AL
�- PR A�
SEi VICES NOT
1 t`�.` �)
i MARKED
[uaY[ [xlsnlla to wr
NO PPRNINC
a
I � SMH I
I,
I 1 S�COtiq
�I + II �.�xorE asTNc PAlwc lni---
,
TOP PF 6L46—_ , h
I I I ,ryI
WVT RAIL, —�
,� F�Y�E
GRAPHIC SCALE
I �.�Iu Faxo I n.
NOTES:
1. BASE PLAN USED IS A SURVEY PREPARED BY BO(
& ASSOCIATES.
2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS
APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM
AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTR
CONTACT UTILITY COMPANIES VIA GOPHER STATE
ONLINE OR BY CALLING 811 OR 1-800-252-1166.
3. ALL CONSTRUCTION SHALL CONFORM TO THE MOS
OF THE PROJECT SPECIFICATIONS, THE STANDARD
OF THE CITY OF ELK RIVER AND THE LATEST EDIT
STANDARD SPECIFICATIONS FOR CONSTRUCTION.
REVIE
HOT FOR
CONCRETE ,
f \ / 61TVMINOVS \\
r45HED
VAULT
Ir
\�
Fr TOP OF
ig ,�x2.„a
�
SLUFF SETBAN,ACKI
i
100 FT. SETBACK FROM,-
! ff
1
j
PHASE 2
89—UNIT
}
1aa r eASE EL000-'�
APARTMENT
x
` E—A— F—DARY y`
I '
1
BUILDING
`
A-27.822 SF
-.
WOODED 'I
', r.
if(
; s
}
FFE_a9aGG
GFE-879 50
-MEDp
P
I
1
I
I
1 1
1
RE I. -A a1 aAslxl
1w YR OA5E
EEEVATION RY C 1
(NAW
I�
V �
i
C ux
1 + I
\ a�
B RT TO"or
uEE sEwAcr-
cwAa _
f
f
f Il
PHASE 1
\ ' %
\ f
APAR7MENT
BUILDING -
A-27,743 SF
f 1
FFE-87.00:
GFE-276.50
`.K k
1
�_
r
�!
f I
1 f
W/
ufs
I I
f
f
1
f I
1
TOP6F BLyfE—, �} ` i
If
x sou
GRAPHIC SCALE
TK
NOTES:
1. BASE PLAN USED IS A SURVEY PREPARED BY BOGART,
& ASSOCIATES.
2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHO
APPROXIMATE ONLY, CONTRACTOR SHALL CONFIRM ALL
AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTO
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE -
ONLINE OR BY CALLING 811 OR 1-800-252-1166.
3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RE!
OF THE PROJECT SPECIFICATIONS, THE STANDARD SPEC
OF THE CITY OF ELK RIVER AND THE LATEST EDITION C
STANDARD SPECIFICATIONS FOR CONSTRUCTION.
4. EXISTING ZONING: FOCUSED AREA STUDY (FAST).
PROPOSED: PLANNED UNIT DEVELOPMENT (PUD).
IMPERVIOUS SURFACE AREA (SF)
RIVERWALK
APTS
RIVERWALK
APTS 2
TOTAL
EXISTING
130,009
60,711
190,719
PERCENT
64.4%
15.8%
32.5%
PROPOSED
74,397
82,225
156,622
PERCENT
32.2%
23.2%
26.7 -
LOT AREA
231,D56
355,112
586,2211
PARKING STALL
COUNTS
RIVERWALK
RIVERWALK
APTS
APTS 2
COVERED
90
90
SURFACE
100
103
TOTAL
190
193
UNITS
69
89
RATIO
2.13
2.77
I
I
REVIEW
NOT FOR CON:
`ENCLOSURE
BITUMINOUS
� �S H E D �y'�'
1 x
IIRER TO 9E I IIACII 661 2 OLIRR °s �
& GUTTER
77177
5' CONCRETE'
SIDEWALK � �� 6' CONCRETE
u SIDEWALK
SAN_ MH
CONNECT T4 EX- Wlul — RIM=992Z
[j F_ IN V= 694, �
TBA - W1 6' WET TAP & cV .+
` r K WATER SERV CE �kT-vp
j L=100LF T�`'p)
PHASE26
f 89-UNIT J ELI
APARTMENT � � �r � k�
BUILDING77
..:� FFE= 890.00 ` �,
COORDINATE
IAII
III AF rl
lb- A*
A ft-
AW
City of
ElLk*..-
*ON%
River
Park Dedication
■ The Park and Recreation Commission recommended cash
dedication and trail easements to support a future connection to
downtown
■ Council directed a cap for the park dedication at $500,000
■ CC review on April 5, 2021.
■ Park dedication paid with building permit.
■ Split between phases
PUD Ordinance Deviations
■ Parking lot setback — Min. of 10 feet
■ Required parking — 2.5 stalls/unit required and —2.15 proposed
• Wild and Scenic River District
■ Bluff setback — parking/circulation encroachment
■ Impervious surfaces — 25% permitted and 26.7% proposed
■ If approved — these will be included in the PUD agreement.
Easement Vacation
■ Vacate portions of Zane
Street to support site and
roadway improvements.
■ Add cul-de-sac
Street Vacation Exhibit
for
Plat of THE DELTA
\ \ A STREET VACATION DESCRIPTION:
\ I\ fiat part of Yale Street as platted in THE CROSSROADS
\ (and as described In Doc. No. 189867 being over, under
NE CDR. OF PALE ST. and across part of the South 830.55 feet of 0ovemment
\ AS PLATTED A THE Lot 1 of Section 3, Township J2, Range 26) and that
_ CROSSROADS - — \ part of Zane Avenue as platted In THE CROSSROADS
\
--- I \ SECOND 4DD/770M. Sherbume County, Minnesota, to be
vaca
\\ ted lying westerly of the following described line:
r-N0/7PH LINE Or THE CROSSROADS \
\ Commencing at the northeast comer of Yole Street as
platted in THE CROSSROADS, thence North 90 degrees DO
minutes DO seconds West on on assumed bearing along
- — the north line of $
aid Yale Street a distance of 58-57
y58. 7 I \ \ feet to the point of beginning of the line to be
N 90,00,001, E'I described, thence South 20 degrees 05 minutes 13
seconds East, parallel with the easterly line of said Yale
Street a distance of 413.98 feet.' thence 252.18 feet
/ \ \ southerly, along a tangential curve concave to the west,
AREA TO BE VACATED having a radius of 229.15 feet and a central angle of 63
; degrees O3 minutes 11 seconds to the intersection of the
\ \ westerly right of way line of Zane Avenue as platted in
in 7 \ THE CROSSROADS SECOND ADDITION and all line there
terminating.
- ----- -� o v
.s "r - TIED THE YALE S . R.O.W. \ I \ \\
PLATTED IN T (p I \
!N THEE CROSSROADS
_ --
-
------/\ \emu O
NE COR. OF LOT i, —BLOCK Z THE
\ Iam \
CROSSROADS
SECOND
ADDITION \ \N zr o
m \
(LO \
THE LWILA R.O.W. ZANE AVE.
AS PLATTED IN THE
"F-. 0 0 0
CROSSROADS SECOND ADDITION \ 7• oz
pmm
\ T \
M� v
lr '
I / v�'N
THE INTERSECTION I I
MTN THE W1YR. O.W.
OF ZANE AVE.
III /
Platted Exemption
■ Adjusting property lines or combining across plat boundaries
requires a plat.
■ Proposed plat — The Delta — combines three lots into two.
a dge&R vd uri Srea,�M,ah�m.neme du 4camp dS vR AWmmem LC, THE DELTA /ITS
rftbefdlowing described properliee snared htlre rmeay of SM1eabame, Smre of _liime ant. YCDIX� �-�
Ylivnesota. SHERaATHE
(G6T IR(RF A2YR.N£NT)
;M1eb�un r.,nmy, hdim�exnra.
'A aM do hereby dedicate W dte pnblic for public use forever the walkway easemst as shown mld eaeanents az
these prarn(s to be signed bV it proper officer beros a5 ,L tks &V d , 20
i
//r ,;}"'r NGPRI LWE CF O0V7 LOT 4 b
-
.'
day of . 20 by Pa➢uggs, PresidenS SwRaz
nrty n�pexvieod Nye nuvcyngnnA pinrNng nfrM10 lnM Anc+i6ul an rhia plat es TF1P_DP.i,TA, tM1al rMc plat i.a PF�JI'Nn� \\ \, �O�, \
1 waLrtbouvdlbl,aM allpublicd,,l ted on the Wa°dthatall motumante d,pktedmNeplathave been ' tgf •� 'e� \ -'>' \
ys ve sluwn and labeleJ as defined inlvfumesula Slalules, Section 505.01, Y" \\ \ WESTLNIE OF EAST50°Fi--_/ 6i iD\
\ �,4•<� \\ fAY'i'O�i M1RSECTttAV3 III-___________5L11°6___
Craig A. Wale Licensed Land Surveyor, Atirmesoh
re aM exarmaedMma and l hereby approve t plates of and execnioedds day,
the Gty Engineer. Dated this dery of , al
attN(y Mettnis pin[ has neen eM1ceked vld gglmved as to compliance wi[M1 (;M1apter SITS, Nirmuore SmtW.ea [hix
C,oumy Rttorde5 forraeorded tlue &s of .2120.
,
CITY OF ELK RIVER
SHERBURNE COUNTY, MN
VICINITY MAP
sec 2 8 0, TwP. 32, R, ?u
snerbNme coNnry, NN
fr — --X-7
c^a\03 m N. 41
,SRE
RInR916uad UUINY Epe•nenle an
seen
I �
W I I
p
NOT TO SCALE
Deis ° 5 d mwi N. a de piot nI l
III 10 hie d dni ' lq
vtrwtullmv. et unlvu olidN bvrNiw indkand.
y IEurrm PONse AssoaAr/uv NOT Pt.,ATTE[i \
\ EASEMENT PER OOLYNEM � � 4L IT 86 iT EASENEA'T
\ � � N0. ID81J2 PARTML-- /'£R DOCUMENT N0. /OH10,-� ROADWAY! Uik]TY o\ \
C RFr I-ASE PER 1/SJSd l3)fB.Tt \ Ea,ENTT H�0, \
� /�J \\DOfMAKENi N0. I955/l �A �GEd Ui�M.�SNY £ASEMFf/'� l IHD�)- _
X
PER OO4 N0.
/ \\ m Fr ACCESS EA Ov MALE 5]REEi AS
slDrcNr /NDs I, PLArrm W Tr¢ masseDADs
/ N 90'00'00' £ 847% 1 / _ /
v I_(2
`- NQRTH LRFE Qe THE BJ0.55 \ I PARr OF MALE \\\
FEET OF OOV'i LOTT t {SEC 3 r.::_ SS
1 y EVA ATED
(Ma IX LME EtCfYi / \w • • •' VAGTN DRAINAGE !
_AuucE usLeFEnr—--itii�: is ;: ii4S`iiO p.iiP s`s\ _ • N u J\ z SCALE: I" = 100'
oRaNAlx,g,,-UT�Iu„Tr
Pm me nrn YA "7•"""_- \� _ _
.� GTED 8\tI LOTIONS uanE-r61TITN .v — _•,_,s—.srcaw ADwiFa'/aa.SNa
r —T67A - )•
fIN I �j 16. 61 -�C� — _ - �)A 15 / u I• �BLOp: A THETIC �
ORAMAGE a (IIILITY
N (` I OR�S05 �sEcK
�. AODTILW A.K.A. 80UTH \}c 1 ORAINACE e \ OAK
PER
b q TI t \+ AUNT a BLOCK ONE
~�• 2 /96Y ' � 1 5 BB'� 5/� � SOf.Y4 _ _ _ _ x \
\u$e m AIXN110N
t,1D'YI a c LOT TWO oa�rR.ATTm�
jL ti9?\ (J £A.IEN�TS lR ITIfYE NOT TINL£NT\
I I c::rn.., a ••
FA4AWAf•l •k UTNJTY EAIl
CYNSSROA0.S AND IN£ J I�S \
(I-LROSSROADS SECOND-�' I uU p \
�z0B-5.5e__ � 5
'� •N 90'OObO' W SO4X of xI. _ / I r s i _Q� _sE caarvm of srcrlcw 4 r.Tzv.
M ESS CCRNER SEC. A, TJON,-�� SWTN LIIE OF COV'T LOT L_ \ RP6W. SHF.PBWN£ INKMiY. MN
F26W (GST RON -ENT) SECTION ; TJON, It— (GSi NroN MLWIMERT)
(AK.A SWTX LINE OF SEC. J) \ \
LEGEND
BARS OggF BEARINGS • Dnotx found Ins manumen:
�HNO AM1em are booed en Me Retl Of THE CROSSNOA05 0 Denelw act iro sent
WEST (N SD130'OD• Wlicn he sn nn ne of ama ales nenm 0 ron mmument
Oanolav Ilmltvd vecavv
BOGART,, PEDERSON & ASSOCIATES, INC.
Planning Commission Meeting
■ The Commission asked about traffic and DNR standards
■ FAST plan and associated traffic analysis recommended
high density residential.
■ Communicating with DNR regarding standards — city can
approve deviations.
■ Commission unanimously recommended approval
■ Staff spoke with resident after the meeting
■ PA System
■ Lighting
■ Off -site improvements
■ Additional email comment regarding age restriction.
Ordinance Requirements
■ Rezoning to PUD
■ High density uses are consistent with the Comprehensive
Plan and the FAST study.
' With the conditions of approval included in the staff report,
the analysis of the application shows compliance with all seven
(7) of the standards required for approval of the CUP.
■ The Easement Vacation is in the public's benefit
■ The plat meets all required standards
Action Requested
■ Approve, by motion, the zone change and CUP, with the
conditions outlined in the memo.
■ Adopt, by motion, resolutions approving the easement
vacations and plat of The Delta, with the conditions noted in
the memo.
CONCRETE ,
f \ / 61TVMINOVS \\
r45HED
VAULT
Ir
\�
Fr TOP OF
ig ,�x2.„a
�
SLUFF SETBAN,ACKI
i
100 FT. SETBACK FROM,-
! ff
1
j
PHASE 2
89—UNIT
}
1aa r eASE EL000-'�
APARTMENT
x
` E—A— F—DARY y`
I '
1
BUILDING
`
A-27.822 SF
-.
WOODED 'I
', r.
if(
; s
}
FFE_a9aGG
GFE-879 50
-MEDp
P
I
1
I
I
1 1
1
RE I. -A a1 aAslxl
1w YR OA5E
EEEVATION RY C 1
(NAW
I�
V �
i
C ux
1 + I
\ a�
B RT TO"or
uEE sEwAcr-
cwAa _
f
f
f Il
PHASE 1
\ ' %
\ f
APAR7MENT
BUILDING -
A-27,743 SF
f 1
FFE-87.00:
GFE-276.50
`.K k
1
�_
r
�!
f I
1 f
W/
ufs
I I
f
f
1
f I
1
TOP6F BLyfE—, �} ` i
If
x sou
GRAPHIC SCALE
TK
NOTES:
1. BASE PLAN USED IS A SURVEY PREPARED BY BOGART,
& ASSOCIATES.
2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHO
APPROXIMATE ONLY, CONTRACTOR SHALL CONFIRM ALL
AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTO
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE -
ONLINE OR BY CALLING 811 OR 1-800-252-1166.
3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RE!
OF THE PROJECT SPECIFICATIONS, THE STANDARD SPEC
OF THE CITY OF ELK RIVER AND THE LATEST EDITION C
STANDARD SPECIFICATIONS FOR CONSTRUCTION.
4. EXISTING ZONING: FOCUSED AREA STUDY (FAST).
PROPOSED: PLANNED UNIT DEVELOPMENT (PUD).
IMPERVIOUS SURFACE AREA (SF)
RIVERWALK
APTS
RIVERWALK
APTS 2
TOTAL
EXISTING
130,009
60,711
190,719
PERCENT
64.4%
15.8%
32.5%
PROPOSED
74,397
82,225
156,622
PERCENT
32.2%
23.2%
26.7 -
LOT AREA
231,D56
355,112
586,2211
PARKING STALL
COUNTS
RIVERWALK
RIVERWALK
APTS
APTS 2
COVERED
90
90
SURFACE
100
103
TOTAL
190
193
UNITS
69
89
RATIO
2.13
2.77
I
I
REVIEW
NOT FOR CON:
GRASSPAVE
FIRE DEPT
ACCESS
11SEkAEhdT FIRST FLOOD
LEVEL GARAGE ACCESS
—GARAGE ~" 4
� ACCESS `_--
5' CONCRETE
SIDEALK
i �a, AREA TO BE
RF—AIVIh;^, ' NF INRI_TRATION BASINY'VACATED
J�AI_LS B612 CURB
' & GLITTER w
$' 14 11
CURS is —UT
L NYLON SIGN
RETAINING D412 CURB_ +
WALLS & GUTTER PROPOSO
LOT LINE
Y. 5 8612 CURB
1 — \11 GUTTER
W
n
BASEMENT LEVEL 19612 CURB ; YY
GARAGE ACCESS & {jUTfER Y
2 u'
FIRST FLDOR
GRASSPAVE GARAGE ACCESS '�r _ SE INFILTRATION BASIN
FIRE DEPT
ACCESS
AL
T. J
GO YR SASE FLOCD
CLCJAiION _OU 1JFl cY
EL_8528 (JNo 88) 1
I
..
rk°;r-Z
11AA r�l�
rr}}C
VA O V V
OTF
-
10-T TO' OF -
RIIlFF 5 AACK
-
.��
N/
L
HY YANT LOC
NOT
EIV
.: I
fi'�
ITT G-
SL..FF
me n AWafCmlea Lda 1n'waiNoc rer. inermiv H
Mapes Uzz'xfr �alll
nLape ,ace na�I
six x
�CCEC �,nh
r orros mmL—
NOTES
A S�TIE 01
fHCH u�vG lLCTHn THw. la Eo E.�l
m � s RNo
00 0 1
1— 11CLE11
CS 0 G. G.
u 1111 ET HCHe �osf E .,u1uv,HEls
11111
Ell
PE jl�l
IT O 0
os
G R
5 11 LN11I—TON. KLLI-EFSFRA IT
Subdivision IV Sec 30 934 Landscaping (3). Min
m c
C �a aenb iL 25% trees on emenla Lre .
Cox,e cane c.sv a eec nca ecrocma�oac,e�sc xo 2s