Loading...
2.1c ERMUSR 03-31-2021 Kodet Architectural Group, Ltd. Address ' 15 Groveland Terrace Contact P:612.377.2737 www.kodet.com Minneapolis,MN 55403 F:612.377.1331 Architecture• Interiors• Planning E:arch@kodet.com March 26, 2021 Mr.Chris Kerzman Engineering Manager Elk River Municipal Utilities 1705 Main Street Elk River, MN 55330 RE: Elk River Municipal Utilities Estimate Dear Mr. Kerzman, RJM Construction and Kodet Architectural Group are pleased to submit the following project cost estimate which is based off bids and quotes received on March 24, 2021,and tie projects estimated soft cost budget. The table below summarizes the overall project costs by splitting them between the cost of construction and soft costs for the work associated with demo of the existing structures, re-grading of the site,and construction of the new utilities building. RJM Estimated Construction GMP $12,300,000.00 Soft Cost Budget Estimate $1,416,550.00 Total Project Cost $13,716,550.00 Feel free to contact our office with and questions. Sincerely, KODET ARCHITECTURAL GROUP, LTD. Sean Leintz,Assoc.AIA Project Manager Daniel Kodet, AIA, NOMA, CID Principal-in-Charge Pig► KV /e4l#/°:;...71.0..:"w"1"1".