8.5 SR 04-05-2021Request for Action To Item Number Mayor and City Council 8.5 Agenda Section Meeting Date Prepared by General Business April 5, 2021 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Active Elk River: Youth Athletic Complex Reviewed by Project Action Requested 1. Award, by motion, the contract of Youth Athletic Complex (YAC) Toilet Building to Minnesota Wisconsin Playground for amount of $326,918. 2. Award or reject, by motion, the contract of the Youth Athletic Complex Concessions Building Renovation and Site Work to Ebert Construction for the amount of $295,020. Background/Discussion As part of the Active Elk River project, the athletic lighting and playground were completed in 2020. Remaining funds will be used for the renovation of the concessions building, restroom building and a septic system. The original plans were for a septic tank to replace the current one, but after plans moved forward it was found the city is required to install a septic system as per building code requirements. The septic system will be coming forward to City Council later. Soil borings, which could not be completed when the ground was frozen, are required for this project. The complete renovation of the existing YAC Concessions Building is required to meet MN Department of Health requirements and regulations for food and beverage sales. To meet these requirements, the facility must have hand washing and ware washing equipment, all food -grade finishes and counters, ventilation, and lighting levels. To provide these new systems, the existing building will require a domestic water supply from an existing tested well, a new septic system and new electrical service connection. Six bids were received for the YAC Concessions Building and the lowest bid of $268,200 from Ebert Construction was $100,000 more than the engineers estimate of $165,000. Staff discussed rebidding this project or breaking it down into various components. As stated in the attached letter from SRF this bid opening indicates rising and volatile material costs, and it is unlikely lower bid numbers would be received if this project was rebid. It is recommended to proceed with this project to meet MN Department of Health requirements. The toilet building for the YAC project is similarly designed and bid as a pre-engineered structure, like the Orono toilet/shelter building, saving the city money over traditional field construction through a general contractor. Unlike the Orono project which could begin this May, this project is slated to begin in early August after the summer baseball season is completed. The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei ly. M TUREJ Updated.• August 2020 Financial Impact See attached cost summary sheet Mission/Policy/Goal Opportunity to live, work, and play Attachments ■ SRF Letter and Bid Tabulations ■ Contract Agreement with Ebert Construction ■ Minnesota Wisconsin Playgrounds YAC Toilet Building Installation Price Proposals ■ YAC Design N:APublic Bodies\Agenda Packets\04-05-2021\Final\8.5 sr Active ER YAC.docx ISR'F SRF No. 13673_B March 29, 2021 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 Subject: Youth Athletic Complex Concession Building Renovation and Site Work City of Elk River SRF Project No. 13673_B Dear Mayor and Council Members: Bids were received for the above -referenced project on March 24, 2021 and were opened and read aloud. A total of six responsive bids were received. The Engineer's Estimate for base bid was $165,000.00. The bid tabulation indicates the low bidder as Ebert Construction, Inc., Corcoran, MN, in the amount of $268,200.00, substantially higher than the Engineer's Estimate. Discussion with contractors following the bid opening indicated that rising and volatile material costs were the primary driver of higher bids. Based on this feedback, it appears unlikely that lower bid numbers would be received if the project were rebid. We recommend that the City consider these bids and award the contract to Ebert Construction, based on the results of the bids received. Sincerely, 446W Tim Wold, PLA Senior Associate tbw Enclosure cc: Markus Ebert, Ebert Construction Michael Hecker, City of Elk River Mike Aaron, SRF Tim McIlwain, HCM Architects H:\Pr jects\ 13000\ 13673\Design\Docs\ 13673_B-YAC Bid Recommendation Letter 032921.docx www.srfconsuIting.com 3701 Wayzata Boulevard, Suite 100 1 Minneapolis, MN 55416-3791 1 763.475.0010 Equal Empigment Opportunity / Afirmative Action Employer BID OPENING IS'RF CITY OF ELK RIVER Youth Athletic Complex Concessions Building Renovation and Site Work Wednesday, March 24, 2021 — 2:00 p.m. Contractor Ad. 1 Ad. 2 Bid Bond RCVF Base Bid Terra Construction X X X X $299,900.00 Integral Contracting X X $270,866.00 Ebert Construction X X X X $268,200.00 Project One Construction, Inc. X X X X $295,000.00 Construction Results Corp. X X X X $314,440.00 Alliance Building Corp. X X X X $291,900.00 Engineer's Estimate $165,000.00 H:\Projects\13000\13673\Bidding\YAC\13673-B_YAC Bid Opening_032421.docx DOCUMENT 00 52 00 STANDARD FORM OF AGREEMENT THIS AGREEMENT is by and between City of Elk River ("Owner") and Ebert Construction ("Contractor"). Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1— WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Renovation of an existing concessions building and associated site work. Also included is associated site work for a new restroom building to be constructed by others. ARTICLE 2 — THE PROJECT 2.01 The Project for which the Work under the Contract Documents maybe the whole or only a part is generally described as follows: Youth Athletic Complex Concessions Building Renovation and Site Work. ARTICLE 3 — ENGINEER 3.01 The Project has been designed by SRF Consulting Group, Inc. (Engineer), who is to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 — CONTRACT TIMES 4.1 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.2 Construction Start Time A. No work shall start on the site until August 2, 2021. 4.3 Dates for Substantial Completion and Final Payment A. All Work shall be substantially completed on or before Friday, October 29, 2021, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before Friday, November 12, 2021. 4.4 Liquidated Damages A. Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner a daily charge for each day that expires after the time specified in Paragraph 4.02 for Milestones and/or Substantial Completion until the Work for the Milestones and/or Substantial Completion is complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner daily charge for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. The daily charges will be based on the original contract value, and will be in the amount shown in the following table: Standard Form of Agreement 00 52 00-1 TABLE OF LIQUIDATED DAMAGES Original Contract Amount Charge Per From Morethan To and Including CalendarDay N N N 0 25,000 300 25,000 100,000 400 100,000 500,000 900 500,000 1,000,000 1,200 1,000,000 2,000,000 1,500 2,000,000 5,000,000 2,500 5,000,000 10,000,000 3,000 10,000,000 ------- 3,500 ARTICLE 5 — CONTRACT PRICE 5.1 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraphs 5.01.A below: A. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in Contractor's Bid, attached hereto as an exhibit. As provided in Paragraph 11.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer as provided in Paragraph 9.07 of the General Conditions. Unit prices have been computed as provided in Paragraph 11.03 of the General Conditions. ESTIMATED TOTAL OF ALL UNIT PRICE WORK ARTICLE 6 — PAYMENT PROCEDURES 6.1 Submittal and Processing ofPayments $ Two Hundred and sixty-eight $268,200 thousand, two hundred dollars. (use words) (figure) A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.2 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment on or about the 15'11 day of each month during performance of the Work as provided in Paragraphs 6.02.A.1 and 6.02.A.2 below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements: 1. Subject to the provisions of SC-14.02, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions: a. Ninety-five percent (95%) of Work completed (withthe balance being retainage). Standard Form of Agreement 00 52 00-2 b. Ninety-five percent (95%) of cost of materials and equipment not incorporated in the Work (with the balance being retainage). 2. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and less 150 percent of Engineer's estimate of the value of Work to be accepted or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion. 6.3 Final Payment A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07. ARTICLE 7 — INTEREST 7.01 Not used. ARTICLE 8 — CONTRACTOR'S REPRESENTATIONS 8.1 In order to induce Owner to enter into this Agreement Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in Paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site which has been identified in the Supplementary Conditions as provided in Paragraph 4.06 of the General Conditions. E. Contractor has obtained and carefully studied (or assumes responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto. F. Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. Standard Form of Agreement 00 52 00-3 H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 9 — CONTRACT DOCUMENTS 9.1 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages 1 to 6 inclusive). 2. Construction Performance Bond (Document 00 61 11). 3. Construction Payment Bond (Document 00 6113). 4. General Conditions (pages 1 to 54, inclusive). 5. Supplementary Conditions (Document 00 73 00). 6. Specifications as listed inthe table of contents of the Project Manual. 7. Drawings consisting of 24 sheets with each sheet bearing the following general title: Youth Athletic Complex Concession Building Renovation and Site Work 8. Addenda (numbers 1 to 2, inclusive). 9. Exhibits to this Agreement (enumerated as follows): a. Contractor's Bid (pages 1 to 3, inclusive). b. Documentation submitted by Contractor prior to Notice ofAward (pages to , inclusive). C. 10. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a. Notice to Proceed (pages to inclusive). b. Work Change Directives. c. Change Order(s). B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. Standard Form of Agreement 00 52 00-4 D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions. ARTICLE 10 —MISCELLANEOUS 10.1 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 10.2 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.3 Successors andAssigns A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.4 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. Standard Form of Agreement 00 52 00-5 IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement in triplicate. One counterpart each has been delivered to Owner, Engineer and Contractor. All portions of the Contract Documents have been signed or identified by Owner and Contractor or on their behalf. This Agreement will be effective on (which is the Effective Date of the Agreement). OWNER: CONTRACTOR City of Elk River By: Title: [CORPORATE SEAL] Attest: Title: Address forgiving notices: City of Elk River 13065 Orono Parkway Elk River. MN 55330 (If Owner is a corporation, attach evidence of authority to sign. If Owner is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of Owner -Contractor Agreement.) By: Title: [CORPORATE SEAL] Attest: Title: Address forgiving notices: License No.: (Where applicable) Agent for service of process: Standard Form of Agreement 00 52 00-6 Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com CONSULTANT. TIM NEWGARD 11 /11 /2020 Quote #100916-01-02 City of Elk River- Youth Athletic Complex- 2nd Shelter - Installation - D10442T City of Elk River Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhecker@elkrivermn.gov INSTALL Install - Installation of Shelter - Shelter Assembly and Construction to Include: Complete construction of all shelter framing, roofing, assembly of uprights, beams and joists. Includes install of shingle roof Electrical work is included, materials and labor included for complete electrical hook ups, wiring and connections. - Plumbing work is included, materials and labor included for complete plumbing hook ups and connections. Concrete Work to Include: Install new 1181nft 24"x12" concrete strip footing w/ 245 rebar continuous Install six course, 8" cmu foundation with cores @ 4' o.c. and continuous bond beam Install 645 sgft, 4"t interior concrete slab w/ wire mesh Install 783 sgft, 4"t exterior concrete slab w/ wire mesh and 8"x12" thickened edge @ perimeter of sidewalk - Includes (1) 30 yd dumpster for packaging material disposal Excludes: Staining or painting shelter, gutters or downspouts, INSTALL Install - Excavation - Excavation includes: excavating for new footings / foundation backfill and compact foundation prep for new exterior concrete rough grade disturbed soils does not include final grading or finish grading, landscaping, paving outside the shelter, or disposal or haul away of existing soils. Comments Ship to Zip 55330 $100,605.00 $100,605.00 $4,600.00 $4,600.00 Sub Total 00 Total $105,205.00 Owner / Customer must prepare the site and take care of any necessary demo prior to the new shelter installation. Clear and open access to the site must be provided. Excludes: Clear coat or stain, gutters & downspouts. Sodding, seeding or site restoration. HGAC # PR11-20 This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Page 1 of 4 Minnesota / Wisconsin Playground 11/11/2020 5101 Highway 55, Suite 6000 Quote #100916-01-02 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com CONSULTANT: TIM NEWGARD City of Elk River- Youth Athletic Complex- 2nd Shelter - Installation - D10442T Indemnification; Owner/Owner's Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Pricing: f.o.b. factory, firm for 30 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at time of order entry. Payment terms: 1/2 of the install will be invoiced upon the structure being erected and the galance net 30 days provided your account is current and in good standing. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Unless already on file, please include a tax exempt certificate upon order entry whether a tax supported government agency or other. Freight charges: Prepaid & added 2020 and 2021 Projects: Installations, whether for play equipment or other products of our scope as well as the related services thay may be included with your project, typically start up in April or May based on weather conditions, road restrictions, etc. Based on the issues being experienced within our own country, and worldwide, the start of a typical installation year may be jeopardized. Every effort will be made to work with your project time frame but the various shutdowns will have an effect on work performance throughout the year, not just starting up. Please telephone your company contact, or our office, to discuss your project further. Page 2 of 4 Minnesota / Wisconsin Playground 11/11/2020 5101 Highway 55, Suite 6000 Quote #100916-01-02 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com CONSULTANT: TIM NEWGARD City of Elk River- Youth Athletic Complex- 2nd Shelter - Installation - D10442T Project Scope Please note, installation is based on site being ready prior to our arrival to install play equipment as well as site conditions that have been conveyed to our organization by the owner/owner's representative and/or ideal conditions existing for a timely completion of your project as quoted. Unless addressed prior to the installation quote being issued or specifically mentioned herein, any issues that arise that impede the progress/completion of your project as quoted will result in additional charges. Weather can change project scheduling in many ways. Take rain for an example. Day, or days, before rain... If weather forecasts show a high percentage chance for rain that will effect the site conditions, a postponement may be in order. Digging holes, laying certain surfacing materials, etc., are greatly affected by weather conditions and work may not begin/continue due to weather forecasts. There's the rain days themselves, which if heavy enough rainfall occurs, makes a site unworkable. Day, or days, after rain... Drying time will be needed after rain and the number of days needed will vary depending on amount of moisture received. One actual rain day may equal multiple delay days depending on work scheduled to be done. + INCLUSIONS + + One mobilization + Public utility locates only + Supply of shelter materials as outlined on quote #_100916-01-01_ + Marking and digging of footings holes as needed + Unpacking of shelter materials + Assembly of shelter and materials + Concrete for footings / slab as needed + Pouring of concrete for footings / slab and rebar + Concrete slab + Excavation + Disposal of Packaging Material + Construction tape/temporary bracing (as needed) + Standard insurance offerings + Standard warranty offerings + Standard industry accepted labor wages EXCLUSIONS - Clear access path up to and into play area for installation equipment (minimum of 8-foot wide, includes but not limited to gates, walkways, driveways, etc.) Staging area for materials and installation equipment, trailers, etc. Unobstructed space for maneuvering installation equipment as well as performing work If fencing is in place (by others), ability to unlock fencing is to be provided to our office a minimum of one week prior to our start Private utility locates such as, but not limited to, irrigation, fiber optics, private lighting, etc. Sitework of any kind such as, but not limited to, grading (play area to have max slope of 1 %), site restoration, drainage, etc. Removal of existing play equipment, border, safety surfacing, etc. Backfill and compaction of backfill after removal of existing items (for footing holes as an example) that leave voids in area (marking and digging of new footing holes based on workable site) Digging in compacted sub -surfaces, rock, hard pan, tree roots, unstable soil conditions, etc. Restoration of compacted sub -surfaces for playground surfacings such as, but not limited to, poured -in -place rubber, rubber tiles, artificial turf, etc. Digging/maneuvering in sand, pea gravel, mud, etc. Offsite removal of spoils from footing holes (can be stockpiled near play area for owner/owner's representative removal or spread within play area) Playground safety surfacing Border to help contain playground safety surfacing Removal of temporary braces, caution/construction tape, etc. (Can be removed and disposed of after concrete has cured.) Prevailing, Davis Bacon, Union, or similar, wages Restroom facilities, see below for specifics Page 3 of 4 fu Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com CONSULTANT. TIM NEWGARD 11 /11 /2020 Quote #100916-01-02 City of Elk River- Youth Athletic Complex- 2nd Shelter - Installation - D10442T Please provide access to restrooms whether within a building or portable style. Should use of site facilities not be available, additional charges will be required to bring on site temporary/portable restrooms. These temporary facilities will be removed once your project has been completed. Should weekend work be necessary or non-standard hours be worked, please provide a site contact and the best telephone number to reach this person in case an urgent matter arises requiring immediate attention. (Name) (Cell) (Other Telephone Number) Wet Site Conditions: installation areas located near wetlands, where a high water table exists or in any environment that produces excessive moisture will require additional planning prior to installation of your project. Unless excessively wet conditions have been conveyed prior to installation quote and accounted for in some manner, your installation will not proceed. Ideal dry conditions need to be present to begin, and complete, your project as quoted. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; storage of goods prior to installation; equipment assembly and installation; any type of restoration, sod or seed. Order Information: Bill To: Ship To: Company: Project Name: Attn: Attn: Address: Address: City, State, Zip: Contact: Tel: Fax: Acceptance of quotation: Accepted By (printed): Signature: Title: Facsimile: City, State, Zip: Contact: Tel Fax: P.O. No: _ Date: Phone: Purchase Amount: $105,205.00 Page 4 of 4 City of Elk River Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhecker@elkrivermn.gov 1 1 1 1 1 1 1 1 F PAC 2446 ENG Option Option Shingles Permit Security Inspection Wall Tile Cement Tile Backer Cement Board Painting Urinals Benches Exhaust Round Louvers Permit Bond Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Minnesota 55422 Ph. 800-622-5425 763-546-7787 Fax 763-546-5050 tim@mnwiplay.com CONSULTANT: TIM NEWGARD City of Elk River- Youth Athletic Complex )escription MA Cedar Forest Products - Parkaire Activity Center- 24' x 46' with 15' x 42' enclosure Cedar Forest Products - Engineering - Engineering drawings will include stamped plans for shelter above ground as well as drawings for concrete footings below ground. Cedar Forest Products - VCP Vitreous China Plumbing Fixture Package Cedar Forest Products - EFP Electrical Fixture Package Cedar Forest Products - AS 30-Year Architectural Grade Shingles Other - Permit for both shelters Other - Warning signs and caution tape- Fencing will be an additional charge. Other - Inspection of shelter Other - Wall tile material and installation in the (4) Toilet Room as specified and full -height Other - Provide cement tile backer board on interior face of exterior walls Other - Cement board siding with exterior sheathing and Tyvek as shown on exterior elevations. Other - Painting of building exterior and the ceilings of the Toilet Rooms Other - 4 Urinals Cedar Forest Products - 4 Wall mounted benches Other - Exhaust ventilation system Cedar Forest Products - Round Louvers on gable ends Other - Permit Other - Performance Bond 03/12/2021 Quote #100916-01-11 Ship to Zip 55330 $128,580.00 $128,580.00 $23,010.00 $23,010.00 $2,080.00 $2,080.00 $5,655.00 $5,655.00 $2,145.00 $2,145.00 $12,181.00 $12,181.00 $3,224.00 $3,224.00 $1,300.00 $1,300.00 $1,646.00 $1,646.00 $3,505.84 $3,505.84 $8,655.96 $8,655.96 Sub Total $191,982.80 Page 1 of 3 Minnesota / Wisconsin Playground 03/12/2021 5101 Highway 55, Suite 6000 Quote #100916-01-11 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com CONSULTANT: TIM NEWGARD City of Elk River- Youth Athletic Complex Comments Terms- 30% down, 20% due upon delivery of materials and the balance net 30 days. Price Includes: • 8' eave height, 3:12 roof pitch, designed for a standard 30 PSF live load & 90 MPH wind speed • Kiln dried cedar, double T&G, nominal 4" x 8" exterior walls • Powder coated steel columns • Zinc plated fasteners, powder coated steel plates • Roof decking shall consist of 2" x 6" nominal #1 SYP single T&G with a V-joint • 2" x 8" cedar fascia • Metal exterior doors, hardware included • Interior walls are 2" x 4" site built construction with FRP panels in restroom area • 1" x 4" S4S cedar trim & prebuilt, louvered red cedar vents Excludes: Clear coat or stain and gutters & downspouts. Sodding, seeding or site restoration. HGAC #PR11-20 This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Owner's Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Pricing: f.o.b. factory, firm for 15 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at time of order entry. Unless already on file, please include a tax exempt certificate upon order entry whether a tax supported government agency or other. Cedar Forest Products Shipment: order shall ship within (OPTION A for WOOD - eight to ten weeks) (OPTION B for METAL - ten to twelve weeks after MWP's receipt and acceptance of your purchase order, color selections, preparation/creation of "stamped" drawings, if required, approved submittals and receipt of deposit/full payment, if required. Receipt of anything other than what is stated herein will not constitute an order and therefore no materials will be placed into production nor installation, if required, will be scheduled. Freight charges: Prepaid & added Wet Site Conditions: installation areas located near wetlands, where a high water table exists or in any environment that produces excessive moisture will require additional planning prior to installation of your project. Unless excessively wet conditions have been conveyed prior to installation quote and accounted for in some manner, your installation will not proceed. Ideal dry conditions need to be present to begin, and complete, your project as quoted. Page 2 of 3 Minnesota / Wisconsin Playground 03/12/2021 5101 Highway 55, Suite 6000 Quote #100916-01-11 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com CONSULTANT. TIM NEWGARD City of Elk River- Youth Athletic Complex Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; storage of goods prior to installation; equipment assembly and installation; any type of restoration, sod or seed. Order Information: Bill To: Ship To: Company: Project Name: Attn: Attn: Address: Address: City, State, Zip: City, State, Zip: Contact: Contact: Tel: Tel: Fax: Fax: Acceptance of quotation: Accepted By (printed): P.O. No: Signature: Date: Title: Phone: Facsimile: Purchase Amount: $191,982.80 Page 3 of 3 �m \; j� : \ : t \\ �� \ -®/0 \ `no g d \ \\\^z> z/ \ �\ \K� � 2 0 1- : ,« \ _0 /( . \ §E�l =1 I - : ,� \ Youth Athletic Complex April 1, 2021 Estimated Cost Summary City of Elk River YAC Estimated Cost Summary Budget Stated Budget $2,000,000 Completed -Lighting Six Fields $1,192,892 -Playground $94,137 -Fencing $24,715 -Irrigation $15,513 Remaining Active Elk River YAC $672,743 Estimated Costs Accept Bids Toilet Building and 10% Contingency $326,918 Concessions Building Renovation -Base Bid $268,200 -10% Contingency $26,820 Accept/Reject Bids $295,020 Septic System Estimated $160,000 Grand Total $781,938