Loading...
6.1j ERMUSR 04-13-2021UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow – Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: April 13, 2021 6.1j SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: Delivered fournew water meters. Sealed the water meter, installed an encoder receiver transmitter, and took curb stop ties from sevenwater services. Completed 15 BACTI/Total Chlorine Residual Samples o All confirmednegative for Coliform Bacteria o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH Completed 23 routine fluoride samples o All samples met MDH standards o Submitted MDH Fluoride Report Submitted the Discharge Monitoring Report for the diesel generation plantto the Minnesota Pollution Control Agency. Completed and submitted the 2020Water Conservation Report totheDNR. Staff have been working with Short Elliot Hendrickson Inc. to conduct a risk and resilience assessment of the water system that is required by the EPA. The new handrail system on top of FreeportWater Tower has been installed andall damage to the tower’s paint coatings resulting from the work has been repaired. The tower has been refilled with water, bacteria samples have passed, and the tower is back in service. Installation of Verizon Wireless communications equipment continues there. A new programmable logic controllerand touch screen controlinterface have been installed at Water Treatment Plant #4. The backwashing issues experienced there have been resolved and the water operators have added 77 cubic feet of filter media to the filter to replace what was lost. Water department staff continue to work with State and County staff on the County State Aide Highway12reconstruction, Highway10reconstruction, and Highway 169 Redefineprojects. ATTACHMENTS: March 2021 Pumping by Well ______________________________________________________________________________ Page 1 of 1 528