Loading...
ERMU RES 21-8 RESOLUTION NO. 21-8 BOARD OF COMMISSIONERS ELK RIVER MUNICIPAL UTILITIES A RESOLUTION OF THE BOARD OF COMMISSIONERS OF ELK RIVER MUNICIPAL UTILITIES APPROVING ASSIGNMENT OF CONSTRUCTION CONTRACTS TO RIM CONSTRUCTION FOR THE ELK RIVER MUNICIPAL UTILITIES FIELD SERVICES FACILITY PROJECT WHEREAS, Elk River Municipal Utilities (ERMU) and Contractor(RJM) have entered into a certain Standard Form of Agreement between Owner and Construction Manager dated January 12, 2021 ("Contract"), whereby Contractor undertakes the construction management of project known as the ERMU Field Services Facility Expansion Project ("Project"); and WHEREAS, at its February 9, 2021 meeting the Utilities Commission authorized advertisement of bids and quotes.The project was advertised from February 27, 2021 to March 24, 2021, and bids were opened and publicly read on March 24, 2021; and WHEREAS, the Project bid documents included the proposed contract for the Work(as defined in the Contract); and WHEREAS, the Contract requires that ERMU assign to RJM all of ERMU's rights in and to contracts for the construction of the Work(as defined in the Contract)which have been competitively bid and awarded by the Utilities Commission. NOW,THEREFORE, in consideration of the mutual promise and agreements made in the Contract and other good and valuable consideration the receipt and sufficiency of which is hereby acknowledged: 1. ERMU hereby grants,transfers and assigns to RJM all of its right, title and interest in and to the contracts identified below as included in the bid documents. 2. RJM hereby consents to and accepts this Assignment and agrees to perform all of its obligations under the Contract for the benefit of ERMU. RJM will enter into the contracts in the same form included in the bid Documents with the contractors awarded the bids and quotes by ERMU. 3. This Assignment shall be binding upon and inure the benefit of ERMU and RJM and their respective heirs, successors and assigns, as the case may be. 4. This Assignment may be signed in more than one counterpart, together shall constitute an original document. BID CATEGORY COMPANY AWARD AMOUNT 3A-Cast-In-Place Concrete Ultra Concrete $735,700.00 3B-Precast Structural&Arch.Concrete Molin Concrete Products Co. $1,609,149.00 4A-Unit Masonry Steenberg-Watrud Construction $293,852.00 5A-Structural Steel&Misc.Metals-Materials Thornberg Steel,Inc. previously awarded 5B-Structural Steel&Misc.Metals-Erection Amerect Inc. $217,300.00 6A-Carpentry Kellington Construction,Inc. $106,500.00 7B-Metal Panels&Metal Roofing Lake Area Roofing&Construction,Inc. $212,426.00 7C-EPDM Roofing Lake Area Roofing&Construction,Inc. $414,314.00 8A-Doors,Frames&Hardware-Materials Twin City Hardware Company $111,081.00 8C-Storefront&Glazing Systems Envision Glass $189,700.00 9A-Gypsum Board Assemblies RTL Construction $326,033.00 21A-Fire Suppression Systems Summit Fire Protection $103,600.00 22A-Plumbing Systems Weidner Plumbing&Heating Co. $655,000.00 23A-HVAC Systems SCR,Inc. $759,500.00 26A-Electrical Systems Wolf River,Inc. $672,588.00 31A-Earthwork Nord Excavating $859,000.00 32A-Asphalt Paving Northland Paving $306,000.00 32B-Concrete Paving North Country Concrete,Inc. $137,550.00 33A-Utilities Kevitt Companies $428,000.00 QUOTE CATEGORY COMPANY AWARD AMOUNT 1B-Surveying Sambatek $21,700.00 6B-Millwork Material Interior Components Group,Inc. $39,857.00 6C-Glued Laminated Construction George F.Cook Construction Co. $76,300.00 7D-Joint Sealants Rite-Way Caulking $6,400.00 8B-Overhead Doors Overhead Door Co.of the Northland $140,001.00 9B-Tiling Advance Terrazzo&Tile Company,Inc. $33,800.00 9C-Acoustical Ceilings St.Cloud Acoustics,Inc. $53,750.00 9D-Flooring Multiple Concepts Interiors $34,800.00 9E-Painting Julius B.Nelson&Son,Inc. $79,495.00 9F-Fluid Applied Flooring Acoustics Associates $48,490.00 10A-Signage Crosstown Sign $8,839.00 10B-Specialties Materials Building Material Supply Inc. $24,559.00 10C-Lockers The Locker Guy $30,258.94 11B-Loading Dock Equipment Overhead Door Co.of the Northland $13,296.00 12A-Window Treatments American Drapery Systems,Inc. $27,885.29 14A-Elevators Otis Elevator Company $76,700.00 14B-Overhad Crane&Jib Systems Aero Material Handling Inc. $65,567.00 32C-Fences&Gates Action Fence,Inc. $137,650.00 32D-Retaining Walls Sunram Construction,Inc. $38,734.40 32E-Landscaping Great Northern Landscapes,Inc. $85,661.00 NOW,THEREFORE BE IT HEREBY RESOLVED BY THE BOARD OF COMMISSIONERS OF ELK RIVER MUNICIPAL UTILITIES,that the assignment of construction contracts for bids and quotes to RJM Construction for the Elk River Municipal Utilities Field Services Facility Expansion Project is approved. This Resolution Passed and Adopted this 13th day of April, 2021. John . Die z, Chai0 DAI Theres S minski, General Manager