ERMU RES 21-8 RESOLUTION NO. 21-8
BOARD OF COMMISSIONERS
ELK RIVER MUNICIPAL UTILITIES
A RESOLUTION OF THE BOARD OF COMMISSIONERS OF ELK RIVER MUNICIPAL
UTILITIES APPROVING ASSIGNMENT OF CONSTRUCTION CONTRACTS TO RIM
CONSTRUCTION FOR THE ELK RIVER MUNICIPAL UTILITIES FIELD SERVICES FACILITY
PROJECT
WHEREAS, Elk River Municipal Utilities (ERMU) and Contractor(RJM) have entered into
a certain Standard Form of Agreement between Owner and Construction Manager
dated January 12, 2021 ("Contract"), whereby Contractor undertakes the construction
management of project known as the ERMU Field Services Facility Expansion Project
("Project"); and
WHEREAS, at its February 9, 2021 meeting the Utilities Commission authorized
advertisement of bids and quotes.The project was advertised from February 27, 2021 to
March 24, 2021, and bids were opened and publicly read on March 24, 2021; and
WHEREAS, the Project bid documents included the proposed contract for the Work(as
defined in the Contract); and
WHEREAS, the Contract requires that ERMU assign to RJM all of ERMU's rights in and to
contracts for the construction of the Work(as defined in the Contract)which have been
competitively bid and awarded by the Utilities Commission.
NOW,THEREFORE, in consideration of the mutual promise and agreements made in the
Contract and other good and valuable consideration the receipt and sufficiency of which
is hereby acknowledged:
1. ERMU hereby grants,transfers and assigns to RJM all of its right, title and
interest in and to the contracts identified below as included in the bid
documents.
2. RJM hereby consents to and accepts this Assignment and agrees to perform
all of its obligations under the Contract for the benefit of ERMU. RJM will
enter into the contracts in the same form included in the bid Documents with
the contractors awarded the bids and quotes by ERMU.
3. This Assignment shall be binding upon and inure the benefit of ERMU and
RJM and their respective heirs, successors and assigns, as the case may be.
4. This Assignment may be signed in more than one counterpart, together shall
constitute an original document.
BID CATEGORY COMPANY AWARD AMOUNT
3A-Cast-In-Place Concrete Ultra Concrete $735,700.00
3B-Precast Structural&Arch.Concrete Molin Concrete Products Co. $1,609,149.00
4A-Unit Masonry Steenberg-Watrud Construction $293,852.00
5A-Structural Steel&Misc.Metals-Materials Thornberg Steel,Inc. previously awarded
5B-Structural Steel&Misc.Metals-Erection Amerect Inc. $217,300.00
6A-Carpentry Kellington Construction,Inc. $106,500.00
7B-Metal Panels&Metal Roofing Lake Area Roofing&Construction,Inc. $212,426.00
7C-EPDM Roofing Lake Area Roofing&Construction,Inc. $414,314.00
8A-Doors,Frames&Hardware-Materials Twin City Hardware Company $111,081.00
8C-Storefront&Glazing Systems Envision Glass $189,700.00
9A-Gypsum Board Assemblies RTL Construction $326,033.00
21A-Fire Suppression Systems Summit Fire Protection $103,600.00
22A-Plumbing Systems Weidner Plumbing&Heating Co. $655,000.00
23A-HVAC Systems SCR,Inc. $759,500.00
26A-Electrical Systems Wolf River,Inc. $672,588.00
31A-Earthwork Nord Excavating $859,000.00
32A-Asphalt Paving Northland Paving $306,000.00
32B-Concrete Paving North Country Concrete,Inc. $137,550.00
33A-Utilities Kevitt Companies $428,000.00
QUOTE CATEGORY COMPANY AWARD AMOUNT
1B-Surveying Sambatek $21,700.00
6B-Millwork Material Interior Components Group,Inc. $39,857.00
6C-Glued Laminated Construction George F.Cook Construction Co. $76,300.00
7D-Joint Sealants Rite-Way Caulking $6,400.00
8B-Overhead Doors Overhead Door Co.of the Northland $140,001.00
9B-Tiling Advance Terrazzo&Tile Company,Inc. $33,800.00
9C-Acoustical Ceilings St.Cloud Acoustics,Inc. $53,750.00
9D-Flooring Multiple Concepts Interiors $34,800.00
9E-Painting Julius B.Nelson&Son,Inc. $79,495.00
9F-Fluid Applied Flooring Acoustics Associates $48,490.00
10A-Signage Crosstown Sign $8,839.00
10B-Specialties Materials Building Material Supply Inc. $24,559.00
10C-Lockers The Locker Guy $30,258.94
11B-Loading Dock Equipment Overhead Door Co.of the Northland $13,296.00
12A-Window Treatments American Drapery Systems,Inc. $27,885.29
14A-Elevators Otis Elevator Company $76,700.00
14B-Overhad Crane&Jib Systems Aero Material Handling Inc. $65,567.00
32C-Fences&Gates Action Fence,Inc. $137,650.00
32D-Retaining Walls Sunram Construction,Inc. $38,734.40
32E-Landscaping Great Northern Landscapes,Inc. $85,661.00
NOW,THEREFORE BE IT HEREBY RESOLVED BY THE BOARD OF COMMISSIONERS OF
ELK RIVER MUNICIPAL UTILITIES,that the assignment of construction contracts for bids
and quotes to RJM Construction for the Elk River Municipal Utilities Field Services
Facility Expansion Project is approved.
This Resolution Passed and Adopted this 13th day of April, 2021.
John . Die z, Chai0
DAI
Theres S minski, General Manager