5.1.a LIBSR 04-27-20215.La Raingarden Update Attached is an aerial photo showing the location for where the Master Gardeners and I discussed placing the planter boxes for their summer program. The Master Gardeners are working on getting these raised planters ordered and delivered. Regarding the parking lot, the Master Gardeners were not very helpful in determining plant species for the rain garden. Based on the discussion from the last Library Board meeting, we discussed utilizing ornamental grasses and some native wildflowers to dress up the rain garden. Species we will utilize include: Little Bluestein (grass) Switchgrass Prairie Dropseed (grass) Butterfly Milkweed (flower) Prairie Blazing Star (flower) These plants will be ordered once we have the ok from the Library Board with the intent to begin planting around the middle of May. With the city's contribution to the planter boxes and plant materials and mulch, we have a budget of $3,000. In addition, when the landscaping work is conducted, there was a request from the Library Board to move the boulders in this rain garden back away from the curbs; this will take place at the same time as the rest of the landscaping. Thanks, Tim i. 5-637-0205 1. Planter Box - Aw. 11 I vo City of Elk River, Minnesota Capital Improvement Plan 2021 thru 2025 PROJECTS BY FUNDING SOURCE Source Project# 2021 2022 2023 2024 2025 Total 'Library City Facilities Upgrades BL-12 216,500 216,500 Library - Fumiture LB-03 10,000 10,000 Library Total 226,500 226,500 GRAND TOTAL 226,500 226,500 2021-2025 CAPITAL IMPROVEMENT PLAN Finance Director CIP Report The Library CIP is attached. 1. $216,500 Facility Upgrades — LED lighting, HVAC improvements 2. $10,000 Furniture/shelving — Due to COVID the Library Board did not meet to discuss furniture replacement needs so Robbie left the $10,000 as a placeholder for anything that might be needed in 2021. Of iv-er February 19, 2021 Dear Eileen: On behalf of the Library Board, thank you for taking the time to prepare and present your ideas for parking lot rain garden plant replacement at the October 27, 2020, Library Board meeting. The Board sincerely appreciates the time and effort you put into your presentation. As you may know, the information you provided resulted in further discussion regarding grounds maintenance and the maintenance responsibilities taken on by the master gardeners and city staff. The Board requested further information for their January meeting. Following an overview by Street and Park Maintenance Superintendent Tim Sevcik, on January 26, 2021, the Board asked Mr. Sevcik to work with the master gardeners to choose a selection of hardy natural grasses to be planted in the rain garden, citing concerns with winter survival rate, replacement costs, and maintenance of your proposed plantings. Thanks again for your passion and your service to our community. If you have questions, please don't hesitate to let me know. Sincerely, Michael Hecker, CPRP Parks and Recreation Director 763.635.1150 13065 Orono Parkway Elk River, MN 55330 763.635.1000 ENAtUREEI ElkRiverMN.gov