6.1i ERMUSR 05-11-2021______________________________________________________________________________ Page 1 of 2 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Mike Tietz –Technical Services Superintendent MEETING DATE: May 11, 2021 AGENDA ITEM NUMBER: 6.1i SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In April, the locators processed 595 locate tickets. These consisted of 2 emergency ticket, 511 normal tickets, 3 non-excavation tickets, 7 corrections, 46 updated tickets, 4 cancellations, and 22 locate meets. This resulted in a 65.7% increase of tickets from the previous month and an 10.4% increase over the prior year. • Electrical Technicians completed 175 service order tasks, updated the power bill, performed weekly substation checks, attended to customer meter issues and off-peak concerns. • On April 29, staff ran engines #3 and #4 without any issues. Engines #1 and #2 were not run this month as the cover gaskets need to be replaced before running. • On April 20 - 22, staff participated in the annual Minnesota Municipal Utilities Association Generation School. Students had the opportunity to visit the Elk River Landfill Gas Plant and Connexus Energy’s Solar Peaking Facility in Ramsey. Also included was hands-on training at the Princeton and/or Elk River Power Plant. We had approximately 10 students attend the class at our power plant where they worked on fuel timing for Generator #3. Staff found this training to be quite enlightening and has requested additional training on the operation and maintenance of our generation facilities. • Mapping department staff has completed the mPower Integrator software implementation. We are still in the process of developing a roll-out of the software so field crews can utilize it on their iPads. Staff is also updating the mapping application in preparation for hydrant flushing the week of May 10. • The Substation Apparatus Technician installed cable supports and racking for the high side relaying equipment in the power plant and is in the process of wiring 292 ______________________________________________________________________________ Page 2 of 2 communications in the new transformer that was delivered May 5. We are anticipating the transformer switchover to take place the week of May 10. 293