4.3 SR 05-17-2021Request for Action
To
Item Number
Mayor and Ci T Council
4.3
Agenda Section
Meeting Date
Prepared by
Consent
May 17, 2021
Zack Carlton, Planning Manager
Item Description
Reviewed by
Utility and Roadway Extension Agreement with
Cal Portner, City Administrator
Cargill
Reviewed by
Action Requested
Approve, by motion, an agreement between the City of Elk River and Cargill outlining the process for extension
of 1681h Circle and the associated utilities.
Approve, by motion, Hakanson Anderson proposal to complete the engineering, surveying, and design services.
Background/Discussion
Staff has been working with Cargill to negotiate a donation of land in exchange for the extension of 1681h Circle
and the associated utilities down to 1651h Avenue. The attached agreement outlines this process and will provide
the city with approximately 30 acres of developable Business Park land for future development. The final number
and size of the buildable lots will be determined during the platting and design process.
The city will install the roadway and utility extensions using multiple city funds and recoup those costs through the
sale of the industrial land. The development costs are estimated at $2.75 million.
Staff solicited bids for preparation of the required surveying, engineering, and design services. After reviewing the
proposals, staff recommends Hakanson Anderson. The initial design services are approximately $47,400 and the
construction services are estimated at $71,300. Engineering and surveying will begin later this week and are
expected to take two to three months. This will include Council approval of the preliminary and final plat.
Financial Impact
A combination of city funds will be used to pay for this project. These include the city's development fund, street
reserve fund, and trunk utility fund. The funds will be recouped by the sale of the industrial properties in this plat.
Mission/Policy/Goal
Adds developable industrial land within city limits.
Attachments
■ Agreement
■ Sketch plan
Hakanson Anderson Proposal
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires pi ospei ly.
M
TUREJ
Updated.• August 2020
UTILITIES AND ROADWAY AGREEMENT
THIS UTILITIES AND ROADWAY AGREEMENT ("Agreement") is made this
day of , 2021, by and between CARGILL, INCORPORATED
("Cargill"), a Delaware corporation with its principal place of business in Wayzata, Minnesota,
and THE CITY OF ELK RIVER ("the City"), a municipal corporation organized under the laws
of Minnesota.
RECITALS
WHEREAS, Cargill operates an agricultural research facility, known as the Cargill
Innovation Campus ("CIC"), on approximately 950 acres in the City, which acres are zoned
Agricultural Research ("the Cargill Property"); and
WHEREAS, the CIC consists of laboratories, feed processing plants, animal housing and
containment units, offices and other facilities for conducting beef, dairy, swine, preservative and
other types of animal, nutrition and agricultural research, and also includes as part of the CIC
operations, among other things, tilled fields, pasture land, storage areas, Land Trust, buffer zones,
and other ancillary areas and uses supporting the development of improved technology in animal
nutrition, nutrient utilization, and livestock management (collectively, "Cargill's Operations");
and
WHEREAS, Cargill has operated the CIC in the City since 1958, and intends to continue
operating the CIC for purposes of Cargill's Operations including conducting animal, nutrition and
agricultural research; and
WHEREAS, Cargill desires to have the City utilities extended south to 165 h Avenue so
that some of the CIC facilities can be served by the City utilities; and
WHEREAS, the City desires to extend 168 h Circle south to 165 h Avenue to improve traffic
flow in this area of the City.
NOW, THEREFORE, in consideration of the mutual covenants and obligations set forth
herein, and other good and valuable consideration, the receipt and sufficiency of which are hereby
acknowledged, the parties hereto agree as follows:
AGREEMENT
1. The City and Cargill will jointly plat the properties described on Exhibit A attached
hereto ("PID 75-011-4100" and "PID 75-011-4400", collectively, the "Property"). The City will
bear all costs related to the plat, including all surveying, engineering and related costs.
2. The plat will dedicate 100 feet of right-of-way along the westerly edge of PID 75-
011-4400 for roadway and utility purposes. Dedication of this portion of PID 75-011-4400 will
be at no cost to the City.
3. Cargill will retain ownership of the portion of PID 75-011-4400 not dedicated for
roadway and utility purposes.
4. Cargill will transfer PID 75-011-4100 to the City contemporaneously with approval
and recording of the plat. The City will prepare, and Cargill will approve, the deed to effect this
transfer, and the City will bear all costs to record the deed and complete the transfer.
5. As consideration for Cargill's transfer of PID 75-011-4100 and dedication of a
portion of PID 75-011-4400 to the City, the City recognizes Cargill's desire and intent to use
indefinitely the Cargill Property for agricultural purposes, including but not limited to animal
nutrition and agricultural research and other activities integral to or supporting the CIC, and
represents that it is not the City's intent to:
a. Impose any zoning or other land use regulations inconsistent with this
Agreement or amend the current zoning designations for the Cargill Property;
b. Prevent, eliminate, or interfere with Cargill's use of the Cargill Property in
any way, except as reasonably necessary to enforce the City's ordinances, regulations, and
requirements and such other laws and regulations as the City is obligated to enforce;
C. Extend the City's Urban Services Area or otherwise promote urban
development of any areas within the Cargill Property; or
d. Condemn any portion of the Cargill Property, except as necessary for public
improvement projects designed primarily to serve other properties; or
e. Extend public utilities and/or roadways under or across the CIC, except as
described herein.
6. The City shall take title to the Property in an "as -is", "where -is", "with all faults
accepted" condition. CARGILL DISCLAIMS ANY AND ALL WARRANTIES, EXPRESS OR
IMPLIED, REGARDING THE PROPERTY, INCLUDING, BUT NOT LIMITED TO, ITS
PHYSICAL OR ENVIRONMENTAL CONDITION, AND MAKES NO WARRANTY OF
MERCHANTABILITY OR FITNESS OF THE PROPERTY FOR ANY PARTICULAR
PURPOSE EXPRESS OR IMPLIED.
7. The City will construct a roadway connecting 168 h Circle to 165 h Avenue, along
with utilities and associated public improvements, through PID 75-011-4100 and within the
dedicated area on the western edge of PID 75-011-4400. Installation of the roadway and extension
of utilities to 165 h Avenue will be at no cost to Cargill. The City will complete the roadway
improvements connecting 168 h Circle to 165 h Avenue no later than Dec 1, 2022.
8. The City will complete extension of water and sewer utilities to 165 h Avenue and
east along 165 h Ave within the boundary of PID 75-012-3300 so that Cargill can connect to
utilities along 165 h Avenue any time after July 1, 2022.
9. Upon transfer of PID 75-011-4100 to the City, the City will be allowed to
subdivide, sell and develop PID 75-011-4100 as the City determines, subject only to the following:
a. The City agrees that no future use of property within PID 75-011-4100 can
be animal related unless Cargill agrees, in writing, to the proposed use. All deeds
2
conveying property within PID 75-011-4100 to third parties shall include notice of this use
restriction.
b. Cargill is granted a right of entry to plant and harvest crops on PID 75-011-
4100 during the 2021 season.
C. Cargill will be allowed to plant and harvest crops in future years on those
portions of PID 75-011-4100 which the City has not sold or commenced development of.
Upon the sale of PID 75-011-4100 or any portion thereof, this right, including the right to
harvest planted crops, will expire as to that portion. The City will provide Cargill with 30
days' written notice of a prospective sale.
MISCELLANEOUS
10. If any dispute arises among the parties with respect to any of the provisions of this
Agreement, the parties agree to enter in the first instance into non -binding mediation to attempt to
resolve the same before a mediator mutually agreed to by the parties. The cost of such mediation
will be divided evenly between the parties. If mediation is not successful in arriving at an
agreement as to how to resolve any such dispute, then the parties, or either of them, may pursue
whatever legal rights and remedies which may exist with respect to enforcement of this Agreement.
11. Any and all notices required or sent in accordance with this agreement shall be
in writing, by U.S. Mail or by electronic communications or facsimile with hard copy to
follow by U.S. Mail, to the following:
Cargill: Cargill Animal Nutrition Attorney
Cargill, Incorporated
15407 McGinty Road West MS-24
Wayzata, MN 55391
[e] kate_hibbard@cargill.com
The City: City Administrator
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
12. This Agreement constitutes the entire agreement of the parties hereto
concerning the subject matter hereof. It may not be supplemented, modified or changed orally,
but instead can be amended only if agreed to in writing by both parties.
13. The parties have reviewed this Agreement, and the rule of construction to the
effect that any ambiguities are to be resolved against the drafting party shall not be employed
in the interpretation of this Agreement.
14. Each of the parties acknowledges and represents that it has been represented by
competent counsel of its own choosing during the negotiation and execution of the
Agreement. Each party further represents and declares that in executing this Agreement it
3
has relied solely upon its own judgement, belief and knowledge, and the advice and
recommendation of its own counsel. Each parry further acknowledges that it has not been
influenced to any extent whatsoever in executing this Agreement by any representations or
statements made by the other party or its counsel, except those expressly contained herein.
15. This Agreement shall be binding upon and shall inure to the benefit of the
successors and assigns of the parties hereto. This Agreement, however, is intended solely
for the benefit of the parties hereto, and their successors and assigns, and it does not confer
any rights or privileges on any party, nor shall any other person or entity other than the
parties hereto or their successors or assigns have any right to enforce this Agreement.
16. The parties acknowledge and agree that all terms and conditions of this Agreement
are integral to the purposes of this Agreement and to the parties' intent in entering into it, and
therefore, if any term or condition or any part of this Agreement is determined to be null and void
or otherwise unenforceable by a court of competent jurisdiction, then this entire Agreement shall
terminate and no longer be of any force or effect.
17. This Agreement shall be governed by and construed and enforced in accordance
with the laws of the State of Minnesota.
18. This Agreement may be executed in counterparts, each of which shall be deemed
to be one and the same instrument.
Dated: 2021
This Instrument Was Drafted by:
CARGILL, INCORPORATED
By:
Its
CITY OF ELK RIVER
By:
John J. Dietz
Its Mayor
By:
Tina Allard
Its City Clerk
11
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
EXHIBIT A
Depiction of the Properties
A-1
/uA wrap tilt3fi.' dY > dc:;� f-pds V�r v a4a rya 1 .� . - ♦ + 3 t
LF1 - 1i 5 r IFe Mfir�fi epei - I �.rr•� -
i1 ) i both ®. $ Npr:,l bst rr oti f t�o
I4 T
,�+ eb4n: - cbncenl+,o or wn I .
_aLi► �7cw. eteto
111=Z401
VA
� I
7S-62s-o305 �.
e
110
75-828 0020
1
V +�
Y•
^
ain uU Y e ®UineaSf Vn wrier mrT n ! P. fle w nU 3 J,11 drnmslens ehsrvn bwetl 9Y&[�rn_�
r/}(/ t 37, eet trrth U the N6rlh AIAT 1RE 6GE BUSINESS A�i —r s, clm ram a no m a1PU
SE c A-DOITION �hld Sl+eY6u y�e � th 64 d rees 5t7 my ec.a ,a - I -
25 seconds as$ 9s® med hecring porch al th acid North I n of Lc,t 2,
# 77 Va r ppl ejo 4tasffirly+f t uth erly radi�t nce of 7 U(I f4 feet _ \
gen tlol ffff�j���j���yyyyyypppppp rmn ove ,[o Shc•_�i71}IFRet nomg o rgtlfuo 0 66a 4✓J feel ^v\\\
angle of Bfi. tl g.e�d 2+ mI Liles s; the ce S ih 01 d 9rees -.g=11�1110 pp
a the to descc. ppddsd a rbe bnL,41flW !ThCha ! auort heai 12 ,lFeet the rseet,bn wit5-1h IT,Penode�P-P—dpp�+�@ /�/�Ctef 7:J-V25'V 105 Dmir�4g�e �E¢setrt2'nft7 he gedfeet ofrl:..
Soothes
Line Porouel wnh fhe —8.3 ACRES
Ne th I,ne of Lat 2. --
—plock 2. NA,L",.S LOGE
@USrNE55 CENTER Cry r
v' rSECOND ADCITON r
IIII
L \s
a o
75-8-2��1Z05
1 41w — — — — — — — -10.1 ACRES
So uth Ilne o< the
• A r� �'.I T, t NEt/4 of SE7/4 of \
1 s I V Sec.11, T-32, l
�I
PIp N. 75-011-430C
V1��✓3 VV, r I
k #5-
Ilk 1-4440
75 -6,;i 5-00 10' �� . •
_ J
— - - -
- 165T9 ,. A1r'E3, fJW - - ---
fl re; 1 the
owr the of ,ne �jh1 r4 r,''aEl/4 El/4 I SEI Ja pF
of S, 1 I, T. 51. F, 25 �ec.1 I, T j2, R 2p
i
4
ti7
Main Office: 45
Ha1Canson 3601 Thurston Avenue, Anoka., MN 55303
Phone: 763/427-5860 Fax: 763/427-0520
Anderson www.haa-inc.com am
March 11, 2021
Justin Femrite, Public Works Director
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: Proposal for Professional Engineering and Land Surveying Services
Dear Mr. Femrite:
Thank you for giving us the opportunity to provide this proposal to the City of Elk River. Our Project
Understanding, Proposed Scope of Services, Project Schedule, Project Team, and Proposed Fee for this
project are described below.
PROJECT UNDERSTANDING
The project consists of the platting of parcel 75-011-4100 into three buildable lots plus one Outlot and
the platting of parcel 75-011-4400 into an Outlot which will be reserved for future development. It will
be necessary to extend 168th Circle NW from its current cul-de-sac to the southeast to provide a
connection to 165th Avenue NW. Intersection improvements are proposed at the intersection of 165th
Avenue NW and the new City Street to provide turn lanes to allow safe access to the development. The
project limits are depicted below in Figure 1.
Figure 1. Approximate Project Limits
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 2
PROPOSED SCOPE OF SERVICES
The services provided by Hakanson Anderson (HAI) will include preliminary plat, final plat, field
reconnaissance, site surveys, design development, preparation of construction plans and specifications,
bidding, construction staking, construction observation, and construction administration. Plans shall
meet all current road design and CEAM specifications and will be in conformance with the City of Elk
River standards. Our proposed services are further defined below.
PROJECT INITIATION AND FIELD RECONNAISSANCE
HAI will perform a field reconnaissance of the project area to review the site conditions and determine
areas that are critical to the project survey and design. Locations of existing major utilities that are
visible from the surface will be reviewed such that early coordination with the utility companies can be
accomplished. All available background data, such as as -built plans, reports prepared by others, and
other pertinent data, will be reviewed.
Estimated Cost: $800
TOPOGRAPHIC SURVEYING SERVICES
Surveying services will include field collection and processing of topographic and survey control within
the project limits. Prior to beginning the field work, a Gopher State One Call locate request will be
called in so that existing utility data can be located. All data will be collected with a robotic total station
or GPS receiver and will be accurate to + 0.05 foot.
Estimated Cost: $6,400
PRELINHNARY PLAT
HAI will conduct a boundary survey of parcels 75-011-4100 and 75-011-4400 as necessary to
accurately depict the boundary on the preliminary and final plats. Additionally, HAI will order title
work for the parcels so that any easements and/or encumbrances can be investigated and later depicted
upon the Preliminary Plat. Existing right-of-way will be computed and depicted in the construction
drawings. Adjacent property monuments will be investigated and surveyed if present.
HAI will prepare the necessary Preliminary Plat, which will depict the proposed subdivision layout.
We will coordinate our proposed lot layout to be based similar to the Concept Plan provided, which
will consist of an approximate 9-acre lot, an 8-acre lot, and a 10-acre lot plus two Outlots. Existing
features, such as wetland boundaries, roads, sewer utilities, water utilities, culverts, and other items as
outlined in the City of Elk River's subdivision ordinance will be depicted on the Preliminary Plat. The
draft Preliminary Plat will be submitted to City staff for review and input prior to it being submitted to
the City for planning commission and council action.
Upon preliminary review from City staff, the Preliminary Plat will be submitted to the City for review
and approval and accompanied by the other necessary documents.
Hakanson
■■ Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 3
Deliverables: HAI will provide a hard copy and electronic copy (.pdf format) of the Preliminary Plat.
The Preliminary Plat will be included as a submittal item.
Estimated Cost: $3,600
PRELINHNARY ENGINEERING SERVICES
HAI will prepare the preliminary engineering documents required for the preliminary plat application.
Specifically, we will prepare a preliminary grading plan, a preliminary street plan, and a preliminary
utility plan. We will provide site improvement details such as preliminary pavement typical section,
preliminary stormwater details, storm sewer details, pedestrian access routes, etc.
We will also prepare a preliminary hydrologic stormwater model and determine the size and proposed
grading or locations of necessary stormwater BMPs. Our stormwater design will include determining
pre -project vs. post -project runoff rates for the 2-year, 10-year, and 100-year design storms as required
by the City of Elk River. We will also consider the volume control requirements of the jurisdictional
agencies and propose stormwater BMPs as appropriate. Our stormwater design will be summarized in
a Preliminary Stormwater Management Plan and will be submitted to the City as a submittal item.
Additionally, we will prepare a preliminary Turn Lane design for the intersection of 1651h Avenue NW
and the new City Street proposed constructed with this development.
Deliverables: Our deliverables will be Preliminary Civil Construction Plans consisting of: Title Sheet,
Details, Preliminary Grading Plan, Preliminary Street Plan, Preliminary Utility Plan, Preliminary Turn
Lane Plan, and Preliminary Stormwater Management Plan.
Estimated Cost: $8,000
WETLAND DELINEATION / WETLAND REVIEW
HAI will field delineate the wetlands (if any are present) and collect the points so that the boundary can
be accurately depicted on the Preliminary Plat and Construction Plans. We will prepare a Wetland
Delineation Report and submit it to the LGU for review and approval. If necessary, HAI will attend
the Technical Evaluation Panel meeting for concurrence of the wetland boundary and type. No wetland
impacts have been considered in this proposal. We assume that any review fees will be paid by the
Applicant or may be paid by HAI as a reimbursable expense at an additional cost.
Deliverables: Wetland Delineation Report prepared by a certified wetland delineator.
Estimated Cost: $2,200
��Hakanson
Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 4
TREE SURVEY
A tree survey is not included in this proposal. Woods limits will be defined such that wooded areas
can be depicted on the Preliminary Plat and Construction Plans. It is assumed that a tree survey is not
required by the review agencies.
UTILITY COORDINATION MEETING
HAI will conduct a utility coordination meeting with the affected utility owners to provide advance
warning of the proposed project and allow ample time to coordinate installation of new private utilites
to serve the development and relocation of utilities, if necessary. HAI will consider utility owners
requests and incorporate them into the project design if appropriate.
Estimated Cost: $600
DESIGN DEVELOPMENT
HAI will develop the detailed design for the project and determine final horizontal and vertical
alignments, necessary pavement and lane configurations, proposed grading, and necessary drainage
improvements. 31) modeling of the proposed improvements will be prepared so that detailed earthwork
calculations can be generated from the existing and proposed surfaces.
Estimated Cost: $6, 000
FINAL PLAT
HAI will prepare the necessary Final Plat document, which must be filed after City approval at the
County Recorder's office by others. HAI will incorporate all necessary easements and will submit the
Final Plat to the City and Sherburne County for review and approval.
Upon preliminary approval from the City, HAI will work with the County Surveyor for review of the
final plat, make technical changes as required, and coordinate the preparation of the mylar copies for
recording. We assume others will do the actual gathering of signatures and recording of the plat.
Other significant expenses will include the City fees and escrows, a current Title Commitment for the
property, and the County Surveyors plat checking fee plus the cost of the mylar recording copies. These
costs are not included in this proposal, but can be paid by HAI and invoiced as a reimbursable service
upon the request of the Owner.
Estimated Cost: $5,200
Hakanson
■■ Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 5
PREPARATION OF CONSTRUCTION PLANS
HAI will prepare the Construction Plans for the project. Construction Plans will consist of: title sheet,
estimated quantities, typical sections, construction notes, details, tabulations, removals, construction
plan sheets, profile sheets, intersection details, striping and signing plans, and traffic control plans. All
plans will be in AutoCAD format.
The Construction Plans will be prepared in accordance with City standards and will be suitable for
public bidding. HAI will also provide a detailed engineer's estimate for the project. The estimated
items will conform to the MnDOT Standard Specification for Construction, 2018 Edition.
Deliverables: HAI will provide hard and electronic copies of the Construction Plans and Engineer's
Estimate.
Estimated Cost: $8, 000
SWPPP PREPARATION
HAI will prepare the necessary Stormwater Pollution Prevention Plan (SWPPP) and will include it in
our civil plans for use by the Contractor.
Deliverables: HAI will provide a SWPPP for the Contractor's use.
Estimated Cost: $1,200
PERMIT APPLICATIONS
HAI will prepare the MPCA permit application for the sanitary sewer extension and the MDH permit
application for the watermain extension. It is assumed that the City of Elk River will pay the applicable
permit review fees.
Deliverables: Completed MPCA Sanitary Sewer extension permit application and MDH Watermain
Extension permit application.
Estimated Cost: $1,000
PROJECT MANUAL
HAI will prepare the Project Manual for the project. The Project Manual will include the technical
specifications, general conditions of the contract, special conditions of the contract, sample
performance and payment bonds, the standard form of agreement, responsible contractor certifications,
and other pertinent items for the project.
Deliverables: Complete Project Manual suitable for public bidding of the project.
Estimated Cost: $4,400
Hakanson
■■ Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 6
BIDDING
During the bidding phase, we will answer questions from interested Contractors, clarify the plans and
specifications, and issue addendums as necessary. We will also attend the bid opening or coordinate
an online bid opening, tabulate the bids, and review the bids for any errors or omissions. Upon
determination of an apparent low bidder, we will perform investigations as necessary to determine the
Contractor's ability to perform the work and provide a recommendation of award to the City.
Deliverables: Bid Tabulation and Recommendation for Award of a Construction Contract.
Estimated Cost: $1,600
CONSTRUCTION STAKING
This phase consists of staking the proposed improvements during construction. It is assumed that
construction staking will be necessary for: silt fence, removals, rough grading, storm sewer, sanitary
sewer, watermain, curb and gutter, blue -topping of gravel and/or centerline finished grade stakes. Our
estimated cost includes one set of stakes, however, re -staking can be provided at an additional cost.
Estimated Cost: $18,500
CONSTRUCTION OBSERVATION AND ADMINISTRATION
This phase consists of observing the construction to ensure that all work conforms to the approved plans
and specifications. The Project Manager will be available for clarifications or for interpretation of the
plans and specifications and will make weekly site visits. We will record actual quantities of work and
evaluate change order requests, if necessary. We will also prepare Pay Applications and other pertinent
items in administering the construction contract. It is proposed that no more than eight weeks be
allowed for the construction of the project.
Estimated Cost: $49,300
RECORD DRAWINGS
Upon completion of the construction project, HAI will assemble pertinent data as necessary to prepare
the "as -built" or record drawings. The record drawings will reflect any changes between the "design
plans" and the "as -built" condition.
Deliverables: Record Drawings in .pdf and AutoCAD format.
Estimated Cost: $1,900
Hakanson
■■ Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 7
MEETINGS
One kick-off meeting with the Owner is included in this proposal. Meeting attendance may be provided
in person or virtually. Progress meetings held at our office or virtually during normal business hours
to discuss design and/or survey elements during the design development phase are included in our fee.
When additional meeting attendance is requested (i.e., Planning Commission, City Council) our time
will be invoiced at our standard hourly rates as an additional service.
PROJECT SCHEDULE
We would anticipate the following schedule for this project:
Submit Proposal
Kick-off Meeting with City Staff
Topographic Survey
Wetland Delineation
Preliminary Plat
Preliminary Design
Design Development
Final Construction Plans
Final Plat
City Council Considers approval of Final Plat/Ad for Bids
Bids Opened
Construction
PROJECT TEAM
March 11, 2021
Week of March 29, 2021
April 16, 2021
May 7, 2021
May 14, 2021
May 14, 2021
May 14 —June 4, 2021
June 18, 2021
June 18, 2021
June 2021
July 2021
August/September 2021
The team for this project was carefully selected based on their qualifications, experience, and
availability. Due to the importance we have placed in serving you, your team will include many of our
key employees with a wealth of relevant experience. We have assembled a team of qualified staff
members to complete the work efficiently, cost effectively, and professionally.
Shane Nelson, P.E., is proposed to be the Project Manager. Shane is a Vice
President of the firm and brings over 21 years of experience in street and utility
construction to the team. Shane has designed and managed over 80 miles of newly
constructed and reconstructed streets. Shane will be the day-to-day contact for the
project and will be involved in all aspects of the project. He will lead the team and
track progress on a daily basis to ensure that the project remains on schedule. He
will attend all meetings with the City, coordinate activities, closely manage all work,
and ensure that all responsibilities and services of the contract and deliverables are
completed on time and within budget.
Hakanson
■■ Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 8
Craig Jochum, P.E., is proposed to be the Quality Assurance/Quality Control
Reviewer. Craig is a Principal of Hakanson Anderson with over 30 years of
experience in civil infrastructure projects. Craig has extensive experience in
managing large infrastructure projects, determining critical paths for schedules, and
excels in effective communication to ensure that projects are run smoothly and that
all deliverables are prepared to the highest quality. He will review the construction
plans and specifications in accordance with our established Quality Manual.
Timothy Eggerichs, P.E., is proposed to be the Lead Design Engineer. Tim is a
senior design engineer with Hakanson Anderson and his focus has been on
development of plans and specifications for street projects and comprehensive water
resource engineering. Tim has successfully designed and managed numerous civil
engineering projects including Municipal State Aid streets. He has successfully
completed City Infrastructure projects for the cities of Coon Rapids, East Bethel,
Anoka, St. Michael, Ramsey, Elk River, and Otsego.
Brian Person, R.L.S., is proposed to be the Registered Land Surveyor. Brian has
18 years of experience in land surveying and is our Director of Survey Services. His
projects range from individual lot surveys to large complex right-of-way acquisition
projects for roadway and utility construction. He has experience in construction
surveying, boundary and topographic surveying, right-of-way acquisition and
mapping, writing and researching property descriptions, and commercial and
residential building staking.
Seth Monroe is proposed to be the Survey Project Manager. Seth has over 17 years
of experience in the surveying and GIS fields. He has extensive experience in the
areas of writing and interpreting complex property and easement descriptions,
drafting of Site and ALTA/NSPS Land Title Surveys, preparation of preliminary
plats, preparation of final plats, construction layout/staking, and GIS database
management.
Kaci Fisher is proposed to be the Environmental Specialist. With a masters in
Environmental Science, Kaci has experience in the review of wetland delineations,
wetland hydrology studies, and replacement plans. She works with local, state, and
federal authorities and applicants on complex issues to resolve differences on
technical issues relating to wetland and other environmental regulations. She is
proficient in performing tree inventories and surveys and wetland mitigation plans.
Hakanson
■■ Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 9
COMPENSATION
The proposed method of billing for services with a defined scope is the fixed fee method. The Proposed
Services with a defined scope include: Project Initiation and Field Reconnaissance, Topographic
Surveying Services, Preliminary Plat, Preliminary Engineering Services, Wetland Delineation, Design
Development, Final Plat, Preparation of Construction Plans, Utility Coordination, SWPPP Preparation,
Permit Applications, Project Manual, and Meetings as discussed herein and we would propose to
provide said "Design Services" as described herein for a fixed fee of $47,400. The fixed fee is
based on:
1. Additional revisions and resubmission of specific material as required by the Owner/Developer
and/or its representative or multiple revisions to address City comments will be considered
additional services, with the exception of omission or errors made by HAI.
2. Additional services, when approved, will be invoiced at our standard hourly rates, or on a
negotiated lump sum basis.
Invoices for the fixed fee portion of this project will be prepared upon the following schedule:
➢ Upon delivery of the Wetland Delineation, Topographic and Boundary Survey, Preliminary
Plat, and Preliminary Engineering Plans, $21,000 will be invoiced.
➢ Upon delivery of Design Development, Final Plat, Preparation of Construction Plans, Grading
Plans, Stormwater Management Plan, Storm Water Pollution Prevention Plan, Project Manual
and Final Plat, $26,400 will be invoiced.
The preferred method of billing for "On Demand" services that are proposed to be provided during
the Construction Period is the Hourly, Not -to -Exceed method. The "On Demand" services are defined
as Bidding, Construction Staking, Construction Administration, Construction Observation, and Record
Drawings. The estimated fee for "On Demand" services as discussed herein is $71,300.
Invoices for "On Demand" services will be prepared upon the following schedule:
➢ Invoices will be prepared on a monthly basis for on demand services during the Construction
Period. Invoices will be prepared monthly upon delivery of service for Bidding, Construction
Staking, Construction Observation, and Construction Administration, and preparation of
Record Drawings and will be invoiced in accordance with our 2021 Hourly Rates.
Therefore, the total Not -to Exceed value of this proposal for all services proposed to be provided
by HAI as discussed herein is $118,700.
Hakanson
■■ Anderson
Mr. Justin Femrite, Public Works Director
March 11, 2021
Page 10
OTHER CONSIDERATIONS
It is assumed that the geotechnical services will be contracted separately by the City. We will assist
the City in determining soil boring and core locations and will coordinate with the geotechnical firm.
Right-of-way acquisition services are not included in this proposal. If requested, we can provide right-
of-way acquisition as an additional service.
GEOTECHNICAL EXPLORATION
A geotechnical exploration is not included in this proposal but will be necessary for determining the
pavement section as well as for the stormwater design. It is assumed that the Owner will contract this
work directly. At a minimum, the geotechnical exploration shall consist of soil borings in the locations
of the proposed building, streets and parking areas, as well as in the locations of any proposed
stormwater BMPs. Coordination with
LANDSCAPE SERVICES
A Landscape Plan is not included in this proposal. If requested, we can sub -consult with a Landscape
Architect and provide a Landscape Plan as an additional service.
SUNINIARY
We thank you for the opportunity to provide this proposal. If you have any questions, please feel free
to contact me at 763-852-0479 (direct) or shanen e,haa-inc.com.
Sincerely,
Hakanson Anderson
A
have M. Nelson, P.E.
Vice President
Hakanson
■■ Anderson
Main Office: 45
�akanson 3601 Thurston Avenue, Anoka, MN 55303
A�d����� Phone: 763/427-5860 Fax: 763/427-0520
www.haa-inc.com
HAKANSON ANDERSON
2021 HOURLY BILLING RATES
Principal Engineer, P.E. $135.00
Senior Project Manager / Design Engineer $125.00
Project Manager / Design Engineer $75.00 - $115.00
Civil Technician $75.00 - $95.00
GIS Technician $85.00 - $105.00
Principal Land Surveyor, P.L.S. $135.00
Land Surveyor, P.L.S. $125.00
Survey Project Manager $125.00
Survey Office Technician
$80.00 - $105.00
Senior Survey Field Technician
$95.00 - $105.00
Survey Field Technician
$75.00 - $90.00
GPS/Robotic Total Station
$35.00
Hydrographic Survey Equipment
$60.00
Senior Construction Observer $105.00
Construction Observer $75.00 - $95.00
Wetland Specialist $95.00
Administrative Assistant $65.00