Loading...
8.2 SR 05-17-2021 Request for Action To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business May 17, 2021 Cal Portner, City Administrator Item Description Reviewed by Northwest Metro Mississippi River Crossings Feasibility Analysis Reviewed by Action Requested Review and discuss. Background/Discussion Councilmember Wagner attended the Northwest Metro River Crossings Policy Advisory Committee Meeting in March. As the liaison to the committee, she would like to discuss and receive feedback from the Council regarding the planning of a possible future river crossing as a new crossing could have impacts on the development of Elk River. Financial Impact N/A Mission/Policy/Goal The Elk River Mission Attachments  PAC Minutes  PAC PowerPoint The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: August 2020 1 The meeting will start in: River Crossings Northwest Metro Feasibility Analysis March 26, 2021 Northwest Metro Policy Advisory Committee Meeting 2 Mississippi River Crossings Feasibility Analysis Agenda WelcomeIntroductionsRecap of PAC Meeting #1Traffic Updates (2020)No Build Traffic ForecastsConcept Review & ScreeningConcept EffectivenessForecast Sensitivity ApproachNext Steps 4 Welcome! Sherburne CountyWright CountyMetropolitan Council Three Rivers Park DistrictFHWAMnDOTSRF ConsultingBolton & MenkSambatek AnokaBrooklyn ParkChamplinCoon RapidsDaytonElk RiverMaple GroveOtsegoRamseyRogersSt. MichaelAnoka CountyHennepin County 5 Background and Purpose Understand Past EffortsUnderstand Travel PatternsUnderstand System PerformanceUnderstand Land Use and GrowthUnderstand Community Position Develop and Evaluate Concepts Define Next Steps Goals of the Feasibility Analysis 6 Goals and Expectations finding investigation - Greater analysisEnvironmental reviewCommunity engagement This is a factand the first of several stepsWill not include recommendationsFuture phases include: 5/4/2021 Schedule Recap of PAC Meeting #1 analysis analysis covered ... analysis destination we - Project background and purposeContextOriginCongestion What (Champlin) (Anoka) Wesp Karasek Judy Johnson Council Dennis Fisher (Dayton)Ryan Gleason (St. Michael)Ryan Jerry Koch (Coon Rapids)Tim McNeil (Dayton)Jennifer Wagner (Elk River)Ron Wagner (Otsego)Brian City OfficialsMet Recap of PAC Meeting #1 (Wright) (Anoka) Burandt (Sherburne) Scott Vetsch Kiffmeyer Stephenson Commissioners Novotony Koegel Lucero Representatives MaryErinEricJerry NewtonPaulPeggyZackBarbaraMatt LookScott Schulte (Anoka)Darek StateCounty was Whothere The congestion analysis findings match my experience of travel in the region Recap of PAC Meeting #1 heard ... we destination findings match my - The originexperience of travel in the region What Recap of PAC Meeting #1 How is safety factored into the feasibility analysis?How is the feasibility analysis forecasting demand for travel? What assumptions is it making about teleworking? Questions/discussion points 12 Traffic Updates AM Congestion vs. 2020 2019 PM Congestion vs. 2020 2019 PAC Question 1 PAC Question 2 PAC Question 3 No Build Traffic Forecasts No Build Traffic Forecasts AND Anticipated 2040 land use growth Highway improvement projects (recent, current, upcoming) Travel Demand Modeling considers the highway system and land usesTraffic forecasts account for changes in: 2018 Trips with 2040 Highway Network Volume increases with roadway improvementsVolume decreases with roadway improvements Legend 2040 Trips with 2018 Highway Network Volume increases with 2040 land use changesVolume decreases with 2040 land use changes Legend 2040 Trips with 2040 Highway Network Volume increases with planned 2040 conditionsVolume decreases with planned 2040 conditions Legend 2040 No Build Forecasts 2040 No Build ADT forecasts on study area highways Capacity Analysis - to - Volume >1.2 capacity results: 0.85 to 1.0 - level hourly capacities - to - <0.85 >1.0 hour directional traffic from daily forecasts - Under capacity Approaching capacity Over capacity Significantly over capacity Estimate peakCompare to planningSummarize volume V/C Analysis Results LegendReduced CongestionPossible New CongestionWorsening of Existing Congestion Capacity Summary - to - Congestion reduced with freeway conversion Congestion reduced with freeway conversion Year 2040 No Build Volume Congestion reduced with capacity expansion OverOver UnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnder PM V/C WB / SB ApproachingApproachingApproaching OverOver UnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnder PM V/C EB / NB ApproachingApproaching OverOverOver UnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnder AM V/C WB / SB ApproachingApproaching OverOverOver UnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnder EB / NB AM V/C ApproachingApproachingApproaching Summary of Existing V/C lane arteriallane arterial lane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freeway -- ------------ 44 lane expresswaylane expresswaylane expresswaylane expresswaylane expressway 444646664448 ----- 44444 Existing Facility Type 94 94 - - Section 94 to CSAH 81 CR 144 to I TH 610 to I - East of TH 610 North of TH 10 West of TH 101 I TH 252 to TH 10 109th to TH 610 TH 101 to TH 610TH 169 to TH 252 CSAH 81 to TH 169 TH 10 to Mississippi Mississippi to 109thWest of TH 169/101 TH 169/10 to CR 144 TH 47 to Hanson Blvd Hanson Blvd to TH 610 Armstrong Blvd to TH 47 TH 169/101 to Armstrong Blvd 94 - I TH 610 Hwy 10 Highway Hwy 169Hwy 101 Hwy 169 Elk River OverOverOverOverOver UnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnderUnder PM V/C WB / SB ApproachingApproaching OverOver UnderUnderUnderUnderUnderUnderUnderUnderUnder UnderUnderUnderUnderUnder PM V/C EB / NB ApproachingApproaching Significantly Over OverOverOver UnderUnderUnderUnderUnderUnderUnderUnderUnder UnderUnderUnderUnderUnderUnder AM V/C WB / SB Significantly Over OverOverOver UnderUnderUnderUnderUnderUnderUnder UnderUnderUnderUnderUnderUnder EB / NB AM V/C Approaching Significantly OverSignificantly Over Summary of 2040 No Build V/C lane arteriallane arterial lane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freewaylane freeway lane freewaylane freewaylane freeway -- ----------- --- 44 lane expresswaylane expresswaylane expressway 44464664448 448 --- 444 Existing Facility Type 94 94 - - Section 94 to CSAH 81 CR 144 to I TH 610 to I - East of TH 610 North of TH 10 West of TH 101 I TH 252 to TH 10 109th to TH 610 TH 101 to TH 610TH 169 to TH 252 CSAH 81 to TH 169 TH 10 to Mississippi Mississippi to 109thWest of TH 169/101 TH 169/10 to CR 144 TH 47 to Hanson Blvd Hanson Blvd to TH 610 Armstrong Blvd to TH 47 TH 169/101 to Armstrong Blvd 94 - I TH 610 Hwy 10 Highway Hwy 169Hwy 101 Hwy 169 Elk River capacity capacity under capacity under under V/C ratios improve to V/C ratios improve to V/C ratios improve to Locations with Current/Future Improvements 94 from TH 101 to TH 610 - ITH 169 Elk River TH 10 Ramsey/Anoka (river Approaching TH 252 and TH 10 Capacity increases from Under Capacity to Approaching 94 and Hwy 169 and between - I New Locations Approaching/Over Capacity west of Hwy 169/TH 101 TH 10CapacityTH 610 betweenbridge) increases to Locations under capacity for existing, but approaching or over in 2040 Significantly Over Over Capacity to to Over Capacity Significantly Over to to Over Capacity Over Capacity Approaching Significantly Over Approaching to Over Capacity Over Capacity 94: increase from - Locations with Increased Congestion 94: increase from - TH 610 and I Hwy 169 and TH 252: increase from TH 610: increase from 94 east of - TH 10 between TH 47 and Hanson Blvd: increase from TH 101 between CR 144 and IITH 610 betweenHwy 169 betweenHwy 169 near Mississippi River: additional time periods Locations approaching/over capacity for existing, but worse in 2040 Concept Review & Screening Concept Development Overview Build upon past planningRecognize projects under developmentConsider improving existing corridorsTarget deficiencies in the systemConsider new connections / crossings Assume Programmed Projects CompletedConsider Future River Crossing Demands / 2040 CongestionHow can travel demands be reasonably served? Considerations Concept Development Approach TH 10/169 in Elk RiverSB TH 101 in RogersTH 169 in Champlin and Anoka Step 1: Brainstorm ideasStep 2: Evaluate and narrow range of ideas Step 3: Review effectiveness and feasibility of four corridor improvementsStep 4: Develop concept graphics / cost Remaining Expressways in 2040Approach 34 Summary - Concept Brainstorm 35 Summary - Concept Brainstorm 36 Highway 10 Concept Brainstorm 37 Highway 101 Concept Brainstorm Highway 610 Concept Brainstorm thth Rd Rd AveAve 120114 Ferry Main St W River Highway 169 Bridge Historic th th Rd Ped Ave Ave SPUI 117 109 Dayton Hayden Lake Rd Concept Brainstorm th 11 Signals / Built Urban EnvironmentTH 10 to W. River Rd / Dean AveSouth of River Rd / Dean Ave to 109 TH 169 Highway 169 Concept Brainstorm New River Crossing Concept Brainstorm Ave to th Zanzibar / Armstrong AlignmentTH 169 to Ramsey Blvd or Sunfish Lake Blvd TH 169 to 117Round Lake BlvdTH 252 Extension to Hanson Blvd Potential Locations A.B.C.D. 42 New River Crossing Concept Brainstorm Concept Packaging (TH 101 + Mobility Mobility New River New River Concept 1 Improvements (TH 101 + TH 10)Concept 2 Improvements TH 10 + TH 610)Concept 3 Crossing (Arterial)Concept 4 Crossing (Expressway) Concept Packages Concept Packaging (TH 101 + Mobility Mobility New River New River Concept 1 Improvements (TH 101 + TH 10)Concept 2 Improvements TH 10 + TH 610)Concept 3 Crossing (Arterial)Concept 4 Crossing (Expressway) Concept Packages Concept Packaging (TH 101 + Mobility Mobility New River New River Concept 1 Improvements (TH 101 + TH 10)Concept 2 Improvements TH 10 + TH 610)Concept 3 Crossing (Arterial)Concept 4 Crossing (Expressway) Concept Packages Concept Packaging (TH 101 + Mobility Mobility New River New River Concept 1 Improvements (TH 101 + TH 10)Concept 2 Improvements TH 10 + TH 610)Concept 3 Crossing (Arterial)Concept 4 Crossing (Expressway) Concept Packages Discussion Improvement ideas Screening method and resultsConcept packages Questions, comments, or feedback on: Concept Effectiveness Blvd 94 - I to 252 Blvd. to Armstrong to TH Lake TH169/101 Initial Improvement Evaluation Blvd to Round System Interchange Improvements CR 144 Mobility Improvements 10 A: HwyHwy 10 B: Add lane HansonHwy 101 A:Hwy 610 A: Mobility Improvements TH 169 UnderUnderUnderUnder PM V/C WB / SB CapacityCapacityCapacityCapacity UnderUnderUnderUnder PM V/CEB / NB CapacityCapacityCapacityCapacity UnderUnderUnderUnder AM V/C WB / SB CapacityCapacityCapacityCapacity UnderUnderUnderUnder EB / NB AM V/C CapacityCapacityCapacityCapacity 94 - Blvd Section Improvement Effectiveness Evaluation CR 144 to I TH 169 to TH 252 TH 47 to Hanson Blvd TH 169/101 to Armstrong B Highway TH 610 Hwy 10Hwy 10 Hwy 101 Planning Level Capacity New River Crossing ArterialExpresswayFreeway variety of facility types were evaluated for Anew river crossing conceptProjected volumes compared to planning level facility capacitiesGuide inclusion of appropriate facility scale in Concept Evaluations 90,000 80,000 Lane - 4Freeway 70,000 60,000 50,000 Lane - 4Expressway Over Capacity Under Capacity 40,000 Approaching Capacity Roadway Planning Capacity (vehicles per day) 30,000 Lane - 4Arterial 20,000 Level Capacity Needs for New River Crossing - Lane - 2Arterial 10,000 0 Planning 1.201.000.800.600.400.200.00 RatioCapacity-to-Volume mile mile - - Urban cross sectionMinimum ¼signal spacingRural cross sectionMinimum ½signal spacing ArterialExpressway Forecast Sensitivity Approach Evaluate 2040 No Build and Improvement Concepts with sensitivity test forecast volumesCompare the extent to which No Build system needs remain the same as traditional forecastsCompare the effectiveness of Improvement Concepts at addressing the identified issuesSensitivity results will clarify the confidence of the effectiveness of Improvement Concepts 2040 Traffic Forecast Approach 2040 Adjusted trend with lower baseline and slower growth 2040 trajectory - 2019 Traditional growth on Sensitivity Test Base 20192020 COVID - Post TrafficDemand 4 PAC Question Schedule 7720 - 234 - 651 Chris Hoberg ĭŷƩźƭƷźğƓ͵ŷƚĬĻƩŭθƭƷğƷĻ͵ƒƓ͵ǒƭ Questions? 7984 - 499 - 763 Jennifer Wiltgen ƆĻƓƓźŅĻƩ͵ǞźƌƷŭĻƓθƭƷğƷĻ͵ƒƓ͵ǒƭ Policy Advisory Committee Meeting Friday, March 26, 2021 8:30 to 10:00 Meeting Notes Attendees: Mike Barnes, MnDOT Metro District Engineer; Jennifer Wiltgen, MnDOT Metro District Project Manager; Jane Kansier, Bolton & Menk; Eric Johnson, Bolton & Menk; Paul Morris, SRF Consulting Group; Brian McLafferty, SRF Consulting Group; Kent Barnard, MnDOT Communications; Melissa Barnes, MnDOT North Area Manager; April Crockett, MnDOT West Area Manager; Jerry Koch, Mayor of Coon Rapids; Dennis Fisher, Council Member - City of Dayton; Eric Lucero, MN House of Representatives District 30B; Jennifer Wagner, CM Elk River; Ryan Gleason, Council Member - City of St. Michael; Scott Schulte, Anoka County Commissioner; Darek Vetsch - Wright County Commissioner; Zack Stephenson, MN House of Representatives District 36A; Ryan Karasek, Mayor of City of Champlin; Mary Kiffmeyer, MN State Senate District 30; Commissioner Kevin Anderson, Hennepin County; Debra Musgrove, City of Ramsey City Council; Anna Varney, Federal Highway Administration; Commissioner Matt Look, Anoka County; Judy Hanson, City of Maple Grove City Council; John Hoffman, MN State Senator District 36 Agenda Items 1. Welcome 2. Introduction 3. Recap of PAC Meeting #1 4. Traffic Analysis 5. Concept Review and Screening 6. Concept Effectiveness 7. Wrap-up Meeting Notes Mike Barnes, MnDOT, introduced himself, welcomed attendees to the PAC meeting, and reviewed the agenda for the meeting. Jennifer Wiltgen, MnDOT Project Manager, briefly reviewed the project background, purpose, goals, expectations, and schedule. 1 | Page Jane Kansier, Bolton & Menk, shared a recap of the December 2020 PAC meeting covering agenda, attendance, survey results, and attendee questions. Paul Morris, SRF Consulting Group, shared the traffic analysis component of the project: o As follow-up to PAC Meeting 1 questions abou congestion, Paul presented side by side maps of 2019 vs 2020 congestion in the study area. o PAC members were then asked to provide reactions to the maps using Mentimeter. 12 of 14 attendees said the maps reflect their experiences during the pandemic In response to an open-ended question about the biggest change in traffic, the most common answers were less peak hour traffic and higher speeds. Multiple attendees also mentioned an increase in off-peak traffic. The most common answer to a question about causes of congestion was stoplights 2 | Page When asked how traffic analysis results should be used to guide the feasibility analysis, attendees opted for a blend of traditional planning assumptions and sensitivity analysis o Paul Morris presented 2040 no-build traffic forecasts. These forecasts account for changes in land use growth and highway improvement projects o Paul Morris presented a volume-to-capacity analysis of the 2040 no-build forecasts o Locations with reduced congestion I-94 from TH 101 to TH 610 TH 169 Elk River TH 10 Ramsey/Anoka 3 | Page o Locations with possible new congestion TH 10 west of Hwy 169/TH 101 TH 610 between I-94 and Hwy 169 and between TH 252 and TH 10 (river bridge) o Locations with increased congestion TH 10 between TH 47 and Hanson Blvd TH 101 between CR 144 and I-94 I-94 east of TH 610 TH 610 between Hwy 169 and TH 252 Hwy 169 between TH 610 and I-94 Hwy 169 near Mississippi River Eric Johson, Bolton Menk, reviewed four packages of improvement concepts o Eric presented considerations and an overview of the approach used to develop improvement concepts o Eric shared the results of a concept brainstorm that identified 14 improvements to highways in the study area. o Each improvement was assessed for impacts on traffic flow across the Mississippi River, consistency with regional planning, and impacts on surrounding communities and/or the natural environment. o Based on this assessment, 7 of 14 improvements were deemed eligible for inclusion in Concept Development 4 | Page Highway 10 Ramsey to Elk River: Spot mobility improvements from Amstrong Blvd. to TH 101 Ramsey to Elk River: Covert to 4-lane grade separated corridor from Amstrong Blvd. to TH 101 Hanson Blvd. to Round Lake Blvd: Add lane Highway 101 TH 101 SB mobility improvements TH 101/I-94 interchange improvements Highway 610 TH 169 to TH 252: mobility improvement Highway 169 Concept brainstorming identified two potential improvements on Hwy 169, but both were deemed ineligible for concept development due to impacts to the built environment New river crossing Four new river crossings were considered Of these four, only the Zanzibar/Armstrong Alignment was assessed to be consistent with local and regional planning and eligible for inclusion in Concept Development. 5 | Page o Eric then presented 4 concept packages. These packages consisted of different combinations of concepts deemed eligible for concept development Paul Morris, SRF Consulting Group, shared an evaluation of concept effectiveness. o Analysis of the proposed mobility improvements on Hwy 10, Hwy 101 and Hwy 610 showed that all of the improved segments would be under capacity in 2040. o Projected volumes on the proposed Zanzibar/Armstrong alignment are consistent with a 4-lane arterial or 4-lane expressway capacity need Paul Morris, SRF Consulting Group, provided an forecast sensitivity test approach o Evaluate 2040 No Build and Improvement Concepts with sensitivity test forecast volumes o Compare the extent to which No Build system needs remain the same as traditional forecasts o Compare the effectiveness of Improvement Concepts at addressing the identified issues o Sensitivity results will clarify the confidence of the effectiveness of Improvement Concepts 1. 6 | Page Jennifer Wiltgen, MnDOT Project manager, reviewed the schedule and provide closing remarks Scott Schulte, Anoka County Commissioner, asked about the outcome of past studies of MnDOT staff Chris Hoberg and Jennifer Wiltgen are available as project contacts and for questions. 7 | Page