Loading...
4.14. SR 06-21-2021 Request for Action To Item Number Mayor and City Council 4.14 Agenda Section Meeting Date Prepared by Consent Agenda June 21, 2021 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Rivers Edge Commons Park Dock Cal Portner, City Administrator Reviewed by Action Requested Award, by motion, the purchase and installation of a dock at Rivers Edge Commons Park for $125,704.00 and $10,000.00 to install a concrete/transition path. Background/Discussion City Council recently discussed moving forward with the Rivers Edge Commons Park dock. Concepts were approved by the Parks and Recreation Commission on August 12, 2020, and by the Council in September of 2020. Resident Boat and Dock Enthusiast Shannon Tatro and Michael Hecker met with Chris Carlson of Envision Company/ERX to express gratitude for his financial commitment to install the dock. The Carlson Family Lightshield Foundation will donate $57,500 toward the dock which was a commitment made last summer covering 50% of the 2020 dock quote. The city will pay the balance of $68,204. It is possible the dock could be installed the end of August/early September. Staff is recommending installing the ADA access and gangways later this year with the floating in 2020 or 2021, depending on delivery and timing. We can bring this to City Council for a final decision once we know exact timing. Financial Impact The product cost, site preparation and installation are $125,704. This quote is good until August 2021. The city will pay $125,704 for the dock and the $10,000 transition path both funded from the GRE Fund. The cost to install and remove the dock annually is $4,800, which will come from the park operating budget. Attachments  Proposed Dock  Marine Dock & Lift Quote $125,704  At Ease Dock & Lift Quote $200,000 (second quote) The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity RIVERS EDGE COMMONS PARK - PROPOSED DOCK ILLUSTRATIVE PLAN 6.6.19 Marine Dock & Lift LU!'P' C(�idl(P,1dP.ajS(D!d[[(tS COMMERCIAL AND RESIDENTIAL 410 Grand Ave. (Hwy 8) P.O. Box 308 Center City, MN 55012 651-257-4265 / 800-314-3625 Web site: www.marinedocklift.com - E-mail: aldena-marinedocklift.com QUOTE / Revised Billing Address: Shannon Tatro / City of Elk River reference 13532 178t" Ave NW Elk River, MN 55330 (440) 935-0622 (763-647-0983) sptatro@gmail.com Service Address: Rivers Edge Commons Park Elk River, MN Sales Person Ship Via Ship Date Terms Date Alden MDL Truck and 2022 Season See Below 17t" May 21 or Float In QtY Description Price Extended lea 44 top side landing /anchoring pads. No railings. $829. up to 8ft drive in anchoring posts. With Aluminum reinforced Titan vinyl decking. 2x6 main structure tubing. lea 5ft x 5ft top side landing / anchoring pad as above. With 3" $1225. x 3" Chair curbing. lea Set of steps 20treds at 7" rise. overall approx 24ft lineal $5625. length. With railing both sides. rails at 18" off and 36" off main 2" x 6" structure tube. 4ea drive in anchoring posts 2 3/8ths OD in size. Up to 1Oft tall posts. 47.5" ID width. lea 4ft x 16ft boardwalk section. With Titan decking. up to 6ft $1982. tall drive in posts.4ea. one end will rest on 8x8 platform. 2x6 main structure. No railing or curbing!! 2ea 8x8 shore side pads. With Titan vinyl decking. With 4ea $2715. $5430. Drive in posts. 2x6 rectangle stock main structure. No railing or curbing. With 2ea white painted benches With back mount structure added. lea 20ft 3" x 3" curbing and perimeter railing. 2nd platform $1108. 2ea 4ft x 24ft gangways from platforms to floating dock. $5360.ea $10720. With chair curbing and railing to 3ft off both sides. Hinge with 60" EZ shore attach, skid pad river side, With 18" transition plate. 3" x 3" aluminum chair curbing. 4ea Rest or turn platforms. 5ft x 1 Oft. With railing and curb. $2730. $10920. 4ea 4ft x 30ft ramps with railings and curbs. $7278. $29112. lea 4ft x 12ft ramp, with railing and curb, and tred plate down $3323. To platform 4ea Adjustable stiff arm assemblies. 22to 26ft lengths. $1171. $4684. 11 80" x 1 Oft EZ Dock $2359.ea $25949. 2ea 40" x 60" EZ Dock $811. $1622. 46 Rubber connecting couplers $61. $2806. 22 Nylon tie up cleats, with longer bolts to go thru curbing $23. $506. 1 lea 1 Oft Poly chair curbing stock. Riverside. $162. $1782. 9ea 1 Oft EZ Dock railings $849. $7641. 4ea 40" EZ Dock Railings $354. $1416. 2ea 60" EZ Dock Railings. $345. $690. 2ea 80" EZ Dock Railings $567. $1134. lea Delivery, with installation of all components. $7200. lea MDL assist with Fall removal(training session Fall 2020 N/C Thank you! We appreciate the opportunity to Sub Total $125704. earn your business. Sales Tax N/A Total $125704. Paid down -0- Terms: signed purchase order with agreement. Balance Due Balance due net 20 days. City of Elk River 21 NOTES: Pricing above good until August 2021. ATKAEI FT S Estimate ADDRESS Michael Hecker City of Elk River ACTIVITY At Ease Dock & Lift, Inc. 31694 U.S. Hwy 10 E Frazee, MN 56544 US (218)334-2202 johnCa ateasedock.com Sales 1 Custom Dock System and Boardwalk to Spec Delivery 1 'Assembled, Delivered & Installed - Summer 2022*** TOTAL Accepted By Accepted Date ESTIMATE # 9092 DATE 05/28/2021 200,000.00 200,000.00 0.00 0.00 $200,000.00