Loading...
7.2. HRSR 07-06-2021 Request for Action Cir•ci Elk - River= To Item Number Housing and RedevIF2021 Authority7.2 Agenda Sectionng Date Prepared by General Business Colleen Eddy, Economic Development Specialist Item Description Reviewed by Main and Gates Redevelopment Update Brent O'Neil, Economic Development Director Reviewed by Cal Portner, City Administrator Action Requested Item is presented for informational purposes. Background/Discussion The soil borings have been completed. The draft boring logs were received, and a final report is still expected. The site continues to be mowed and the city's Cable Coordinator is in the process of updating the drone footage video that will be utilized to help market and promote the site. Staff continues to receive inquiries and is working on process to solicit development ideas for the site through a Request for Information (RFI) per the direction of the HRA. Financial Impact N/A Mission/Policy/Goal The goal of the HRA is to improve existing housing stock by offering incentives or programs to repair and maintain residential properties. Attachments • Draft Soil Boring Logs The Elk River Vision P O N E R E o R Y A welcoming community avith revolutionary and spirited resourcefulness, exceptional [NAWR service, and community engagement that encourages and inspires prosperity. Updated.August 2020 Draft4 4 6 10 12 18 FILL COARSE ALLUVIUM FILL, mixture of sand with silt and silty sand, a little gravel, trace roots, brown and dark brown SAND, a little gravel, fine to medium grained, brown and light brown, moist, loose (SP) SAND, fine to medium grained, grayish brown, moist, medium dense (SP) SAND. a little gravel, fine to coarse grained, grayish brown, moist, medium dense (SP) END OF BORING *WD - Water level measured while drilling *AD - Water level measured at completion of drilling M M M M M M SS SS SS SS SS SS 10 8 12 12 10 12 None None 0-13' Rig: *WD *AD 6/8/21 6/8/21 Surface Elevation DATE BR LG: TIME DR: 4.0 WATERLEVEL DEPTH: 6/8/21 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG CASINGDEPTHSAMPLEDDEPTH3.25" HSA GRD751 BORINGCOMPLETED: DR 96.3 DRILLING METHOD CAVE-INDEPTH DRILLINGFLUID LEVEL WATER LEVEL MEASUREMENTS MCGEOLOGY SB- 1 (p. 1 of 1) Main & Gates Redevelopment; Elk River, MN AET No: Project: 01-DHR-060 NDEPTHINFEET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SUBSURFACE BORING LOG PL FIELD & LABORATORY TESTS 03/2011 MATERIAL DESCRIPTION RECIN.SAMPLETYPE P-0001445 LLDENWC %-#200 Log of Boring No. AMERICAN ENGINEERING TESTING, INC.AET_CORP P-0001445 MAIN & GATES.GPJ AET+CPT+WELL_20181012_JG.GDT 6/9/21 Draft5 2 3 11 4 7 FILL COARSE ALLUVIUM FILL, mixture of silty sand and sand with silt, a little gravel and clayey sand, pieces of wood, brown SAND, fine to medium grained, brown, moist, medium dense (SP) SAND, a little gravel, fine to medium grained, grayish brown, moist, very loose, lamination of clayey sand (SP) SAND, fine grained, grayish brown, moist, loose (SP) END OF BORING *WD - Water level measured while drilling *AD - Water level measured at completion of drilling M M M M M M SS SS SS SS SS SS 13 10 8 13 8 12 None None 0-13' Rig: *WD *AD 6/8/21 6/8/21 Surface Elevation DATE BR LG: TIME DR: 4.0 WATERLEVEL DEPTH: 6/8/21 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG CASINGDEPTHSAMPLEDDEPTH3.25" HSA GRD751 BORINGCOMPLETED: DR 94.4 DRILLING METHOD CAVE-INDEPTH DRILLINGFLUID LEVEL WATER LEVEL MEASUREMENTS MCGEOLOGY SB- 2 (p. 1 of 1) Main & Gates Redevelopment; Elk River, MN AET No: Project: 01-DHR-060 NDEPTHINFEET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SUBSURFACE BORING LOG PL FIELD & LABORATORY TESTS 03/2011 MATERIAL DESCRIPTION RECIN.SAMPLETYPE P-0001445 LLDENWC %-#200 Log of Boring No. AMERICAN ENGINEERING TESTING, INC.AET_CORP P-0001445 MAIN & GATES.GPJ AET+CPT+WELL_20181012_JG.GDT 6/9/21 Draft7 8 14 4 6 2 TOPSOIL COARSE ALLUVIUM SILTY SAND, slightly organic, trace roots, fine gravel, dark brown, moist, loose (SM) SAND, a little gravel, fine to medium grained, brown, moist, loose to medium dense (SP) SAND, a little gravel, medium to coarse grained, brown, moist, very loose to loose (SP) SAND, fine to medium grained, brown, waterbearing, very loose (SP) END OF BORING *WD - Water level measured while drilling *AD - Water level measured at completion of drilling M M M M M W SS SS SS SS SS SS 14 10 4 10 10 12 13.0 13.0 0-13' Rig: *WD *AD 6/8/21 6/8/21 Surface Elevation DATE BR LG: TIME DR: 5.0 WATERLEVEL DEPTH: 6/8/21 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG CASINGDEPTHSAMPLEDDEPTH3.25" HSA GRD751 BORINGCOMPLETED: DR 89.3 DRILLING METHOD CAVE-INDEPTH DRILLINGFLUID LEVEL WATER LEVEL MEASUREMENTS MCGEOLOGY SB- 3 (p. 1 of 1) Main & Gates Redevelopment; Elk River, MN AET No: Project: 01-DHR-060 NDEPTHINFEET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SUBSURFACE BORING LOG PL FIELD & LABORATORY TESTS 03/2011 MATERIAL DESCRIPTION RECIN.SAMPLETYPE P-0001445 LLDENWC %-#200 Log of Boring No. AMERICAN ENGINEERING TESTING, INC.AET_CORP P-0001445 MAIN & GATES.GPJ AET+CPT+WELL_20181012_JG.GDT 6/9/21 Draft7 3 2 12 9 10 FILL COARSE ALLUVIUM FILL, mixture of silty sand and sand with silt, a little gravel and clayey sand, brown and dark brown SAND, a little gravel, fine to medium grained, brown, moist, medium dense to loose (SP) SAND, fine grained, grayish brown, moist, loose (SP) END OF BORING *WD - Water level measured while drilling *AD - Water level measured at completion of drilling M M M M M M SS SS SS SS SS SS 4 10 11 12 12 4 None None 0-13' Rig: *WD *AD 6/8/21 6/8/21 Surface Elevation DATE BR LG: TIME DR: 4.0 WATERLEVEL DEPTH: 6/8/21 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG CASINGDEPTHSAMPLEDDEPTH3.25" HSA GRD751 BORINGCOMPLETED: DR 92.9 DRILLING METHOD CAVE-INDEPTH DRILLINGFLUID LEVEL WATER LEVEL MEASUREMENTS MCGEOLOGY SB- 4 (p. 1 of 1) Main & Gates Redevelopment; Elk River, MN AET No: Project: 01-DHR-060 NDEPTHINFEET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SUBSURFACE BORING LOG PL FIELD & LABORATORY TESTS 03/2011 MATERIAL DESCRIPTION RECIN.SAMPLETYPE P-0001445 LLDENWC %-#200 Log of Boring No. AMERICAN ENGINEERING TESTING, INC.AET_CORP P-0001445 MAIN & GATES.GPJ AET+CPT+WELL_20181012_JG.GDT 6/9/21