Loading...
2.5 ERMUSR 08-10-2021______________________________________________________________________________ Page 1 of 1 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Chris Kerzman – Engineering Manager MEETING DATE: August 10, 2021 AGENDA ITEM NUMBER: 2.5 SUBJECT: Field Services Facility Expansion Project – Subcontractor Performance Bond Credit ACTION REQUESTED: Approve Change Order Number 2 for the Subcontractor Performance Bond Credit. BACKGROUND: ERMU staff and RJM Construction have had discussions on the subcontractor default insurance policy, due to the default by the steel subcontractor for the Field Services Facility Expansion project. Bidders included costs for both payment and performance bonds in their bids, but due to RJM carrying an SDI policy the subcontractor performance bonds were not used. RJM received pricing for deductions of the unused performance bond premium costs and submitted this deduction as a credit to the guaranteed maximum price. RJM still carries a payment and performance bond for the entire project. DISCUSSION: The attached change order documents the credit to the guaranteed maximum price for the removal of unused subcontractor performance bonds. ATTACHMENTS: • Change Order Number 2 for Subcontractor Performance Bond Credit 39 DocuSign Envelope ID: FAFED8C1-63CB-4454-9C58-590D03129F0F 8/5/2021 Theresa Slominski 40 830 Boone Ave North Golden Valley, MN 55427 MINNEAPOLIS OFFICE Change Order Contract Number: Change Order #: To : Change Order Date : PCO # Description Elk River Municipal Utilities - Field Services Faciltiy 02 08/04/21 Amount You are directed to make the following changes in this Contract: Elk River Municipal Utilities 13069 Orono Parkway Elk River, MN 55330 -58,229.886Subcontractor Performance Bond Credit 25,759.00 Total:-58,229.88 12,180,926.00The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . The net change by previously authorized Change Orders was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12,206,685.00The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -58,229.88The Contract Sum will be decreased by this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12,148,455.12The new Contract Sum will be . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . The new Contract Completion date as of this Change Order will be 6/1/2022 Accepted By Contractor:Architect/Engineer:Authorized By Owner: RJM Construction, LLCElk River Municipal Utilities 830 Boone Ave North13069 Orono Parkway Elk River, MN 55330 Golden Valley, MN 55427 By: _______________________ Date: _____________________ By: _______________________By: _______________________ Date: _____________________Date: _____________________ , 25,759.00 20520-0154Project: Page 1 of 1 Please sign and return original to RJM Construction LLC DocuSign Envelope ID: FAFED8C1-63CB-4454-9C58-590D03129F0F 41 DocuSign Envelope ID: FAFED8C1-63CB-4454-9C58-590D03129F0F 42 DocuSign Envelope ID: FAFED8C1-63CB-4454-9C58-590D03129F0F 43