Loading...
2.1 ERMUSR 08-25-2021______________________________________________________________________________ Page 1 of 1 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Dave Ninow – Water Superintendent MEETING DATE: August 25, 2021 AGENDA ITEM NUMBER: 2.1 SUBJECT: 2021 Watermain Relocation Improvements Project – Award of Bid ACTION REQUESTED: Approve, by motion, award of the low bid and authorize the execution of a contract with G.F. Jedlicki, Inc. for the 2021 Watermain Relocation Improvements Project. BACKGROUND: Staff has been working with Elfering & Associates to design and bid the 2021 Watermain Relocation Improvements project associated with the Highway 169 Redefine. The project was noticed for formal bids from July 24, 2021, to August 19, 2021. DISCUSSION: The bid opening was August 19, 2021, at 11:00 a.m.; four bids were received. The low responsible bidder was G.F. Jedlicki, Inc. Staff and Elfering & Associates recommend awarding the bid to G.F. Jedlicki, Inc. Attached is the bid tabulation and recommendation for award letter. FINANCIAL IMPACT: As presented on bid tabulation. ATTACHMENT: •2021 Watermain Relocation Improvements Bid Tabulation •Elfering & Associates Bid Results and Recommendation for Award Letter 3 BID TABULATION PROJECT: 2021 Watermain Relocation Improvements OWNER: Elk River Municipal Utilities OPENING DATE:August 19, 2021 at 11:00 am ENGINEER: Elfering & Associates ITEM ITEM DESCRIPTION NO.UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ($)($)($)($)($)($)($)($) SCHEDULE 1.0 - TH10/ TH169 NORTH BOUND RAMP 1 MOBILIZATION LS 1.00 $5,500.00 $5,500.00 $19,625.00 $19,625.00 $50,000.00 $50,000.00 $5,000.00 $5,000.00 2 CONNECT TO EXISTING WATERMAIN EA 2.00 $7,315.00 $14,630.00 $13,472.50 $26,945.00 $9,022.00 $18,044.00 $14,000.00 $28,000.00 3 16" BUTTERFLY VALVE EA 1.00 $13,350.00 $13,350.00 $10,660.00 $10,660.00 $8,034.00 $8,034.00 $8,000.00 $8,000.00 4 16" WATERMAIN LF 575.00 $214.00 $123,050.00 $154.78 $88,998.50 $272.00 $156,400.00 $200.00 $115,000.00 5 TESTING LS 1.00 $3,200.00 $3,200.00 $5,500.00 $5,500.00 $3,500.00 $3,500.00 $1,500.00 $1,500.00 6 TRAFFIC CONTROL LS 1.00 $3,200.00 $3,200.00 $1,575.00 $1,575.00 $6,500.00 $6,500.00 $2,500.00 $2,500.00 7 RESTORATION LS 1.00 $13,230.00 $13,230.00 $8,272.00 $8,272.00 $3,500.00 $3,500.00 $30,000.00 $30,000.00 SCHEDULE 1.0 - TH10/ TH169 NORTH BOUND RAMP - TOTAL $176,160.00 $161,575.50 $245,978.00 $190,000.00 SCHEDULE 2.0 - MNDOT PARK & RIDE 1 MOBILIZATION LS 1.00 $8,400.00 $8,400.00 $13,625.00 $13,625.00 $50,000.00 $50,000.00 $5,000.00 $5,000.00 2 CONNECT TO EXISTING WATERMAIN EA 3.00 $8,650.00 $25,950.00 $7,972.50 $23,917.50 $6,850.00 $20,550.00 $9,500.00 $28,500.00 3 16" BUTTERFLY VALVE EA 1.00 $8,500.00 $8,500.00 $9,585.00 $9,585.00 $8,034.00 $8,034.00 $7,000.00 $7,000.00 4 16" WATERMAIN LF 1,345.00 $214.00 $287,830.00 $159.95 $215,132.75 $215.00 $289,175.00 $190.00 $255,550.00 5 TESTING LS 1.00 $4,900.00 $4,900.00 $5,500.00 $5,500.00 $4,000.00 $4,000.00 $1,500.00 $1,500.00 6 TRAFFIC CONTROL LS 1.00 $5,645.00 $5,645.00 $420.00 $420.00 $2,500.00 $2,500.00 $1,000.00 $1,000.00 7 RESTORATION LS 1.00 $27,450.00 $27,450.00 $47,140.00 $47,140.00 $26,000.00 $26,000.00 $65,000.00 $65,000.00 $27,450.00 SCHEDULE 2.0 - MNDOT PARK & RIDE - TOTAL $368,675.00 $315,320.25 $400,259.00 $363,550.00 SCHEDULE 3.0 - FREEPORT AVENUE 1 MOBILIZATION LS 1.00 $7,500.00 $7,500.00 $13,625.00 $13,625.00 $50,000.00 $50,000.00 $35,000.00 $35,000.00 2 CONNECT TO EXISTING WATERMAIN EA 3.00 $9,235.00 $27,705.00 $14,762.50 $44,287.50 $6,966.00 $20,898.00 $10,000.00 $30,000.00 3 CONNECT TO EXISTING SERVICE EA 1.00 $1,145.00 $1,145.00 $6,037.50 $6,037.50 $2,526.00 $2,526.00 $1,200.00 $1,200.00 4 16" BUTTERFLY VALVE EA 2.00 $8,500.00 $17,000.00 $11,305.00 $22,610.00 $8,034.00 $16,068.00 $9,000.00 $18,000.00 5 6" GATE VALVE EA 1.00 $4,450.00 $4,450.00 $7,435.00 $7,435.00 $3,353.30 $3,353.30 $3,250.00 $3,250.00 6 16" WATERMAIN LF 825.00 $268.00 $221,100.00 $226.78 $187,093.50 $295.00 $243,375.00 $250.00 $206,250.00 7 2" COPPER WATER SERVICE LF 100.00 $68.00 $6,800.00 $100.21 $10,021.00 $51.88 $5,188.00 $125.00 $12,500.00 8 2" CORPORATION EA 1.00 $1,465.00 $1,465.00 $2,424.58 $2,424.58 $1,913.33 $1,913.33 $1,600.00 $1,600.00 9 2" CURB STOP AND BOX EA 1.00 $1,780.00 $1,780.00 $2,435.33 $2,435.33 $1,962.73 $1,962.73 $1,600.00 $1,600.00 10 HYDRANT W/ VALVE EA 1.00 $8,230.00 $8,230.00 $8,504.17 $8,504.17 $7,380.92 $7,380.92 $9,000.00 $9,000.00 11 TESTING LS 1.00 $3,665.00 $3,665.00 $5,500.00 $5,500.00 $4,250.00 $4,250.00 $1,500.00 $1,500.00 12 TRAFFIC CONTROL LS 1.00 $9,400.00 $9,400.00 $7,350.00 $7,350.00 $8,500.00 $8,500.00 $38,000.00 $38,000.00 13 RESTORATION LS 1.00 $68,655.00 $68,655.00 $160,500.00 $160,500.00 $37,500.00 $37,500.00 $300,000.00 $300,000.00 SCHEDULE 3.0 - FREEPORT AVENUE - TOTAL $378,895.00 $477,823.58 $402,915.28 $657,900.00 GM CONTRACTINGG. F. JEDLICKI NORTHDALE CONSTRUCTION CO INC NEW LOOK CONTRACTING 1 of 2 4 ITEM ITEM DESCRIPTION NO.UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ($)($)($)($)($)($)($)($) GM CONTRACTINGG. F. JEDLICKI NORTHDALE CONSTRUCTION CO INC NEW LOOK CONTRACTING SCHEDULE 4.0 - BOOSTER STATION 1 MOBILIZATION LS 1.00 $3,200.00 $3,200.00 $5,500.00 $5,500.00 $7,000.00 $7,000.00 $1,500.00 $1,500.00 2 REMOVE AND SALVAGE BOOSTER STATION LS 1.00 $22,300.00 $22,300.00 $23,612.50 $23,612.50 $17,500.00 $17,500.00 $15,000.00 $15,000.00 3 TRAFFIC CONTROL LS 1.00 $3,110.00 $3,110.00 $525.00 $525.00 $2,250.00 $2,250.00 $1,500.00 $1,500.00 4 RESTORATION LS 1.00 $2,850.00 $2,850.00 $4,325.00 $4,325.00 $4,000.00 $4,000.00 $5,500.00 $5,500.00 SCHEDULE 4.0 - BOOSTER STATION - TOTAL $31,460.00 $33,962.50 $30,750.00 $23,500.00 ALTERNATE 1.0 - GAS STATION REALIGNMENT 1 ALTERNATE ALIGNMENT LS 1 $66,455.00 $66,455.00 $56,450.00 $56,450.00 $45,000.00 $45,000.00 $215,000.00 $215,000.00 ALTERNATE 1.0 - GAST STATION REALIGNMENT - TOTAL $66,455.00 $56,450.00 $45,000.00 $215,000.00 BID SUMMARY - TOTAL SCHEDULE 1.0 - TH10/ TH169 NORTH BOUND RAMP - TOTAL $176,160.00 $161,575.50 $245,978.00 $190,000.00 SCHEDULE 2.0 - MNDOT PARK & RIDE - TOTAL $368,675.00 $315,320.25 $400,259.00 $363,550.00 SCHEDULE 3.0 - FREEPORT AVENUE - TOTAL $378,895.00 $477,823.58 $402,915.28 $657,900.00 SCHEDULE 4.0 - BOOSTER STATION - TOTAL $31,460.00 $33,962.50 $30,750.00 $23,500.00 TOTAL BASE BID $955,190.00 $988,681.83 $1,079,902.28 $1,234,950.00 ALTERNATE 1.0 $66,455.00 $56,450.00 $45,000.00 $215,000.00 TOTAL BASE BID WITH ALTERNATE 1.0 $1,021,645.00 $1,045,131.83 $1,124,902.28 $1,449,950.00 I HEREBY CERTIFY THAT THIS IS AN ACCURATE TABULATION OF THE BIDS RECEIVED FOR THE ABOVE MENTIONED PROJECT. NAME: Kristie Elfering, P.E. DATE: August 19, 2021 MN REG. NO.: 42350 2 of 2 5 10062 Flanders Court NE – Blaine, MN 55449 – Ph: (763) 780-0450 Fax (763) 780-0452 August 20, 2021 File: 235037E-0071 Mr. Dave Ninow Elk River Municipal Utilities 13069 Orono Parkway PO Box 430 Elk River, MN 55330 RE: 2021 WATERMAIN RELOCATION IMPROVEMENTS PROJECT ELK RIVER MUNICIPAL UTILITIES Dear Mr. Ninow: Bids were opened for the above referenced project at 11:00 a.m. on Thursday, August 19, 2021 in accordance with the Advertisement for Bids. Four (4) bids were received from the following companies listed below from lowest to highest total bid: Corporation Total Base Bid Total Base Bid with Alternate G. F. Jedlicki $ 955,190.00 $1,021,645.00 Northdale Construction $ 988,681.83 $1,045,131.83 GM Contracting $1,079,902.28 $1,124,902.28 New Look Contracting $1,234,950.00 $1,449,950.00 The low bid received from G. F. Jedlicki is over the anticipated construction costs, but based on the bids received appears to be competitive and all bids have been reviewed for errors and/or omissions. G. F. Jedlicki has completed projects within the City of Elk River and past experience with them reflects that they are a responsive and responsible bidder. In review of the bids we believe that ERMU has received a competitive bid for the work and the higher costs are a result of the current upward trend in construction prices and materials. The work also needs to be completed ahead of the MnDOT TH 169 project. We would recommend that ERMU award the project to G. F. Jedlicki as the low, responsible bidder. If you have any questions concerning this information, please call me at (763) 780-0450 Ext. 2. Sincerely, Elfering & Associates Kristie Elfering, P.E. 6