Loading...
6.1i ERMUSR 10-12-2021UTILITIES COMMISSION MEETING TO:FROM: ERMU Commission Mike Tietz – Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: October 12, 20216.1i SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In September, the locators processed 682 locate tickets. These consistedof 4 emergency tickets, 546 normal tickets, 8 non-excavation tickets, 2 boundary surveys, 86 updated tickets, 16 cancellations, 4 corrections, and 16 locate meets. This resulted in a 9.1% increase in tickets from the previous month and a 4.9% increase from the prior year. • Electrical technicians completed 388 service order tasks, updated the power bill, attended to customer meter/power quality issues and off-peak concerns. The Cold Weather Rule went into effect on October 1 and will remain in effect until April 30. • On September 23, staff ran generators #1, #2, #3 & #4. Cooling water on #1 & #2 was still a little low. We replaced 4 injectors on Engine #3 prior to running. • Mapping department has been busy GPSing splices & conduit locations along with getting caught up on mapping changes/new construction from throughout the year. • The substation apparatus technician has been working on a relay panel layout for the West Substations and we have been working with Great River Energy (GRE) to remove obsolete equipment from the control house. Also, GRE is investigating if they can move their motorized switch control out to their pole. Staff has been assisting the water department with investigating an electrical issue at Well #6 related to the generator/transfer switch. • I have been focusing most of my attention on the Advanced Metering Infrastructure project. I have received several promising quotes from consultants, and I have put together an evaluation form for the leadership team to score the proposals. We are planning to interview companies with the top 2 or 3 proposals and make a choice by the middle of October. ______________________________________________________________________________ Page 1 of 2 94 • GRE experienced momentary blinks on thetransmissionsystemon September 13& 16 most likely due to storms inthe area. Also, GRE utilized their alternate feed fromStation 14, Bank #3to feed their campus on September 30. Minnesota Municipal Power Agency will adjust this within Midcontinent Independent System Operator. ______________________________________________________________________________ Page 2 of 2 95