7.1. PCSR 10-26-2021 Request for Action
Cir•ci
Elk -
River=
To Item Number
Planning Commission 7.1
Agenda Section Meeting Date Prepared by
Work Session October 26, 2021 Zack Carlton,Planning Manager
Item Description Reviewed by
Concept Review: Daniel Krueger—PID 75-871-
0105, Case No. CR 21-04 Reviewed by
Action Requested
Review the conceptual plans and provide the applicant with informal,non-binding, feedback.
Background/Discussion
The subject site is located west of the former driveway to Wapiti
Campground. The parcel is one acre in size and fronts 185`''Avenue
NW to the south and Troy Street (private road) to the east.
The property is currently zoned R-Ib and the recently adopted
Comprehensive Plan guides the property for traditional single-family
U
residential uses. CR 33
The applicant,Daniel Krueger,has submitted a concept review for
either a mini-storage facility or a townhome with 3 to 4 units. The site x
sketches and narrative are attached for review. RR
While the Comprehensive Plan does include guidance for townhomes VWr io
and other multiple-family residential units to coexist in single-family - CR 12
neighborhoods,that use has generally been targeted for the Mixed-
Residential Neighborhood land use category.
Please review the applicant's request and provide informal,non- 'P
binding, feedback to guide a possible future land-use application. ywj
.o
6y
Financial Impact
None
Figure I
Mission/Policy/Goal
Support property owner needs and goals
Attachments
■ Applicant's Narrative and site plans
The Elk River Vision P O N E R E o s Y
A welcoming community avith revolutionary and spirited resourcefulness, exceptional [NAWRE
service, and community engagement that encourages and inspires prosperity. Updated.August 2020
894892892892892
894 892890896
896
898
898
Site Data Required Provided
# Storage Units 1 Unit with
7 storage bays
Front Setback 30’30’
Rear Setback 20’20’
Side Setback Interior / Street 25’ / 25’25’ / 25’
Parking Setback 10’10’
Site Information
Current Zoning R1b Single Family Residential
Proposed Zoning I-3 General Industrial District
Required Lot Area 1 acre
Site Area - Gross 1 acre
NORTH
0 25’ 50’Parking Setback Rear Setback Front Setback Front SetbackSide Setback
1 2 3 4 5 6 7
185th Ave NW
County Rd 10 Troy St NWStormwater
45’
25’25’25’25’
25’30’
30’
45’200’
Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC.
Elk River, MN
10.04.2021
Concept Plan - Mini Storage
894892892892892
894 892890896
896
898
898
Site Data Required Provided
# Units 6
Townhome Dimensions 24’ wide center unit28’ wide end units 35’ x 35’
Front Setback 30’30’
Rear Setback 25’25’
Side Setback Interior / Street 10’ / 10’10’ / 10’
Parking Setback 10’10’
Setback b/t Building and Private Drive 30’30’
Setback between Buildings 25’n/a
Site Information
Current Zoning R1b Single Family Residential
Proposed Zoning R-4 District
Maximum Allowed Density 8 units / acre
Site Area - Gross 1 acre
NORTH
0 25’ 50’
185th Ave NW
County Rd 10 Troy St NWParking Setback Rear Setback Front Setback
Side Setback
Stormwater
1 2
3 4
24’
120’Front SetbackLandform® and Site to Finish® are registered service marks of Landform Professional Services, LLC.
Elk River, MN
10.04.2021
Concept Plan - Residential