4.13 SR 12-06-2021Request for Action To Item Number Mayor and Ci T Council 4.13 Agenda Section Meeting Date Prepared by Consent December 6, 2021 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Change Orders for Youth Athletic Complex Cal Portner, City Administrator Reviewed by and Orono Park Action Requested Adopt, by motion, the change orders for the Youth Athletic Association (YAC) and Orono Park projects. Background/Discussion Both the YAC and Orono Park projects are delayed and will not be completed until spring 2022. Both projects originally had completion dates of October 2021. Delays have been caused by COVID related supply chain delays. Descriptions for each change orders are shown in the attachments. A majority of the YAC change orders are related to building code requirements and changes to move the restroom building 11-inches as requested by Elk River Municipal Utilities for utility easements. The issues with the pickleball slope still need to be resolved and are not part of any change order. Financial Impact The total contingency approved by City Council for both the YAC and Orono Park projects is $240,128. The total costs for change orders are $158,553.58. Mission/Policy/Goal Opportunity to live work and play. Attachments ■ Change Order Descriptions for Orono Park and YAC The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei ly. M TUREJ Updated.• August 2020 Orono/New Look Change Orders PR# I Change # Date Brief Description Total Cost 001 1 5/28 Temporary construction fencing (play area, splash pad, boat launch) $7,500 2 5/28 Boat launch, no parking signage, closed signs $2,100 3 5/28 Pickleball court fencing, fabric, and fittings $12,295 002 1 6/7 NOT approved -Revise trail alignment and grading to avoid park sign 003 1 6/18 Remove existing water service for farmer drinking fountain $965 004 1/2 6/22 Conduit and wire alignment revisions including under Gary Street $15,294.97 3 6/22 Furnish and install conduit for solar table $1,168.89 005 1 7/15 Furnish and install three card readers on bathroom doors $2304.00 2 7/15 Power supply feeds to shelters, install ground boxes $5,199 3 NOT approved -vehicle charger conduit 006 11 7/29 Two additional conduits for two cameras $3,234 007 1 . 9/13 Conduit for flagpole $3,415 9/13 Skatepark conduit for future lighting $3,785 008 1 10/15 Flagpole Installation- Flag runners' contribution $4,400.00 Reconstruct trail connection to fishing pier on existing aggregate _ Remove existing bituminous trail connection to existing shelter and replace with six -inch -thick concrete walk Total $14,264.23 $7,593.44 009 10/25 10/25 $79,118.53 MN/Wisconsin Playground Change Orders PR # Change # Date Brief Description _ Total Cost 001 1 9/24 Toilet Shelter building, shelter doors and hardware $2,623.85 2 10/24 Additional 904 sf concrete @ six inches $9,012 Total $11,635.85 Spohn Ranch Change Orders PR# Change# Date Brief Description Total Cost 11/10 Steinbrecher Demo yard boxes for Spohn Ranch $2,966.35 Total $2966.35 PR# Updated 12/1/21 Other Date Brief Description 11/30 ERMU Commercial water connection and meter Total Cost $4,480.75 Total $4,480.75 SRF PROPOSAL REQUEST SIU-NO. 13673 A Date: 05/28/2021 PR No.: 001 Project: Orono Park To: Wyatt Gutzke General Site Improvements New Look Contracting 18599 Gary Street 14045 Northdale Boulevard Elk River, MN 55330 Rogers, MN 55374 Owner. City of Elk River From: Tim Wold 13065 Orono Parkway SRF Consulting Group, Inc. Elk River, MN 55330 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit ann itemized cost estimate for changes in the Contract Sum and Contract Time for proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a, change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: ® Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ❑ Other 1. Furnish and install temporary construction fencing along boat launch and between the existing play area and the proposed splash pad. Remove upon project completion. Assume 1,000 LF. Labor $ 3 a S Materials $ OH&P $ 7 SD 7' oO (Circle One) 2. Furnish and install temporary signage as noted below. Remove upon project completion. • BOAT LAUNCH CLOSED • NO VEHICLE AND TRAILER PARKING ON SITE (2) 3701 WAYzATABouLmTARD, Surm 100 I 1VftNNFm0LIS, MN 55416 1 763.475,0010 1 WWW.SRFCONSULTING.COM Page 2 of 2 • BEACH CLOSED (2) • TRAIL CLOSED (2) Labor Materials OH&P (Circle One $ 4 A0 $ Z v $ zM PR No. 001 3. Revise pickleball court fencing to black vinyl -coated fencing, including posts, gates, frames, rails, fabric, and all fittings and hardware. Labor Materials OH&P % % Z1 5 (Circle One) .5 TOTALADD/DEDUCT: $ Does Proposed Change(s) involve a change in Contract Time? ❑'No ❑ Yes (Increased)(Decteased) —, days. Attachments: Request By: Tim Wold, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River H•\P*,*\13000\13673\Coxdniaion\Orono Park\Cwhwd Changes\Prt0om1&gtx,*\PR #1_Ca4rl Ftasy-Pic"ballPena_052821.dax E N G I N F F R S x PLAN NFP.S E� D ESIGNERS Consulting Group, Inc. PROPOSAL REQUEST Date: 06/7/2021 Project: Orono Park General Site Improvements 18599 Gary Street Elk River, MN `55330 Owner: City of Elk River 13065 Orono Parkway Elk River, MN 55330 SRFNa 13673-1 PR No.: 002 To: Wyatt Gutzke New Look Contracting 14045 Northdale Boulevard Rogers, MN 55374 From: Tim Wold SRF Consulting Group, Inc. 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: ❑ Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ® Other 1. Revise trail alignment and grading as shown on the attached layout and grading plans to avoid park sign and electrical pole guy wires. Revised CAD geometry is also attached. Labor $_ _ Materials $ OH&P $ 5ppwdmll� $ W 570e' (Circle One) TOTAL ADD/DEDUCT: $ Zi ONE CART soN PARKWAY, SUITE 150 1 MINNEAPOUS, MN 55447 1 763.475.0010 1 www.mFcoNsuLTiNr,.com Page 2 of 2 Does Proposed Change involve a change in Contract Time? qNoE] Yes (lncteased)(Decreased) _ days. Attachments: 13673 Trail Revi4ons,,..ayout Grading_06721.pdf 13673-gma.dwg Not Request By: Tim Wold, SRF}� by cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk Rives Branson Wisner, City of Elk River PR No. 002 R\ ds\130M13673\Corm&lion\OrawPaA\CwftrIC w#APropawI&,jwft\PR#2 Tmi R dm 06072Uk, LOOK 3 14045 Northdale Blvd., Rogers, MN 55374 EXTRA TIME & MATERIAL WORK Job Name: Orono Park DATE: 6/23/2021 Location of Work: Owner: Icity Owner's Rep: SRF Description of Work: PR 2 - trail modifications Equp. # Equipment Quantity Units Rate I Total $ - Surveying 1 Is $ 600.00 $ 600.00 Paving 1 is $ 300.00 $ 300.00 Grading 1 Is $ 750.00 $ 750.00 $ - $ - $ - $ - subtotal $ 1,650.00 Laborer/Operator Name Hours Rate $ - Operator $ 105.00 $ - Laborer $ 100.00 $ - Super 2 hr Is 110.00 $ 220.00 subtotal $ 220.00 Materials Quantity Rate $ - $ - $ - $ - subtotal $ - Material taxes 7.25% $ - Mark up on total 10% $ 187.00 owner/Representative: 70"a 9"A New Lank Cantmelina. Inc. TOTAL: $ 2,057.00 e: 6/23/2021 Date: ENGINEER$ PLANNERS D ESIGNERS Consulting Group, Inc. PROPOSAL REQUEST Date: 06/18/2021 Project: Orono Park General Site Improvements 18599 Gary Street Elk River, MN 55330 Owner: City of Elk River 13065 Orono Parkway Elk River, MN 55330 SRFNa 13673 A PR No.: 003 To: Wyatt Gutzke New Look Contracting 14045 Northdale Boulevard Rogers, MN 55374 From: Tim Wold SRF Consulting Group, Inc. 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate`,for changes in the Contract Sum and Contract Time for proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: ❑ Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ® Other 1. Description of Changes: Remove existing water service for former drinking fountain within proposed entrance drive to the south parking lot (based on discussion at the 6/17/21 site meeting). • Excavate to corporation stop on former drinking fountain water service shut-off. Coordinate observation/inspection of this work with Elk River Municipal Water. • Shut off corporation stop • Remove water service line downstream from corporation stop. Labor $ N ✓ 0 Materials $ �- OH&P ONE CAmsoN PARRwAY, SUITE 150 1 MINNEAPoms, MN 55447 1 763.475.0010 1 www.sRFcoNsuLnNG.com Page 2 of 2 (Circle One) TOTAEDUCT: $� �I Does Proposed Change involve a change in Contract Time? )2�o ❑ Yes ( ncreased)(Decreased) —days. Attachments: r Request By: Tim Wold, SRP cc: Michael Hecker, City of Ells River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River PR No. 003 H\Pmfeds\ 13000\IM;r3\C4xftdVV\0roso Pan&\&aMW CbaVjr\Pmfi=IR gmAi\PR #3_�atarSenrn R,,,,LM1821A= LsR'F SRFNo. 1367L-4 PROPOSAL REQUEST Date: 06/22/2021 PR No.: 004 Project: Orono Park To: Wyatt Gutzke General Site Improvements New Look Contracting 18599 Gary Street 14045 Northdale Boulevard Elk River, MN 55330 Rogers, MN 55374 Owner: City of Elk River From: Tim Wold 13065 Orono Parkway SRF Consulting Group, Inc. Elk River, MN 55330 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: ® Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ❑ Other 1. Revise conduit and wire alignment as shown on attached sheets E1.0 and E1.2 (add approx. 40 lineal feef}. 2. Add #1,NMC with #12 tracer wire (approx. 238 Ll� including directional boring under Gary Street/adjacent trail and add two (2) 16" x 16" handholes as shown on attached sheet E1.1 for future pickleball court lighting. Labor $ ff `-1 Z d Materials $ r ` 7 OH&P $ 9 %f (Circle One) f,2c1A)4e-) 3701 WMIZATn BOULEVARD, SUITE 100 1 MINNEAPOLIS, bIN 55416 1 763.475.0010 1 WWW WCONSULTING.CoM Page 2 of 2 3. Furnish and install T' conduit with sweeps for solar table per attached sketch plan. Labor $— Materials $ OH&P " po"W- $ $1,168.89 (Circle One) TOTAL ADD/DEDUCT: $ / • 11 Does Proposed Change(s) involve a change in Contract Tune? ❑ No eYes (Increased)(Decreased) —d days. Attachments: Sheet E1.0 — Overall Lighting Plan Sheet E1.1— South Park Lighting Enlargement Plan Sheet E1.2 — North Park Lighting Enlargement Plan Solar Table Conduit Plan (from City) Solar Tabel Conduit Quote (from New Look) Request By: Tim Wold, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River PR No. 004 H\A,j \13M1i673\G,-tniaw\Om-Park\CoxtmcrCh-V,\Prp-IRej",\PR#4_a#dniA&-06222i.d. ����tt��l► %��c+rli�s�,l1u� Category Label Category Data Material Non -Quoted 2789.27 Material Quotes 0 Sales Tax (7.75%) 216.17 Total Material 3005.44 Labor Direct (47.62 hours @ $120.00) 5714.4 Labor Non -Productive 0 Total Labor 5714.4 Direct Job Expenses 4040 Tools and Miscellaneous Materials 0 Subcontracts 0 Job Subtotal (Prime Cost) 12759.84 Overhead (2.36%) 300.54 Profit (2.53%) 330.6 Job Total 13390.98 Bond 0 Job Total with Bond 13390.98 Actual Bid Price 13390.98 Material to Direct Labor ratio: 0.34 Square Footage 0 Prime Cost per square foot 0 Job Total per square foot 0 Actual Bid Price per square ft 0 Labor cost per square foot 0 Vvrwtfvjml I, --�-- EQI.prrvif Cl�trtie%ftefrr.�/o�erh�a� o?"Pyo Entry Item# Description Quantity Price Price Unit Ext Price Labor Labor Unit Ext Labor User Date 2 PICKLE FROM 0.00 0.00 0.00 0.00 SUP TO 0.00 0.00 0.00 0.00 SUP Length: 240.00 0.00 0.00 0.00 0.00 SUP 1189 1" PVC Conduit 240.00 119.40 C 286.56 4.00 C 9.60 SUP 2128 1" PVC Elbow 4.00 217.10 C 8.68 0.40 E 1.60 SUP 2116 1" PVC Coupling 4.00 58.90 C 2.36 0.08 E 0.32 SUP A2050 1" PVC Term Adpt & Locknut 2.00 1.67 E 3.34 0.32 E 0.64 SUP 1588 1" Locknut 2.00 76.39 C 1.53 0.14 E 0.28 SUP 2062 1" PVC Mate Adaptor 2.00 90.68 C 1.81 0.28 E 0.36 SUP 2787 #12 THHN CU Solid Wire 252.00 323.16 M 81.44 6.00 M 1.51 SUP 3 7067 6"Wx24"D Trench -Ditch Witch 200.00 0.00 E 0.00 5.00 C 10.00 SUP 4 7107 6"Wx6"D Backfill & Compaction 200.00 0.00 E 0.00 5.25 C 10.50 SUP 5 PIC SHLT FROM 0.00 0.00 0.00 0.00 SUP TO 0.00 0.00 0.00 0.00 SUP Length: 50.00 0.00 0.00 0.00 0.00 SUP 1189 1" PVC Conduit 50.00 119.40 C 59.70 4.00 C 2.00 SUP 2128 1" PVC Elbow 4.00 217.10 C 8.68 0.40 E 1.60 SUP 2116 1" PVC Coupling 4.00 58.90 C 2.36 0.09 E 0.32 SUP A2050 1" PVC Term Adpt & Locknut 2.00 1.67 E 3.34 0.32 E 0.64 SUP 1588 1" Locknut 2.00 76.39 C 1.53 0.14 E 0.28 SUP 2062 1" PVC Male Adaptor 2.00 90.68 C 1.81 0.18 E 0.36 SUP 2788 #10 THHN CU Solid Wire 53.00 510.92 M 26.82 7.50 M 0.39 SUP 2792 #8 THHN CU Stranded Wire 120.00 890.96 M 106.92 10.00 M 1.20 SUP 6 7067 6"Wx24"D Trench -Ditch Witch 50.00 0.00 E 0.00 5.00 C 2.50 SUP 7 6879 Misc. Labor 2.00 0.00 E 0.00 1.00 E 2.00 SUP 8 1242256 24x24x24 Quazite Box with "Communications" cover 2.00 777.08 E 1554.16 0.90 E 1.80 SUP 9 1242249 Quazite Floor Box 1.00 644.90 E 644.90 1.00 E 1.00 SUP 9-1 HUBBARD ELECTRIC, INC Electrical Contractor 1.4166 Bank St. Becker, MN 55308 Phone:(763) 263-8334 CONTRACT POTENTIAL/CHANGE ORDER #2 Date: 6/25/2021 Job # Orono Park Site Improvements Contract For: Electrical Owner/Contractor: City of Elk River / New Look Construction The following changes from the contract plans and specifications are hereby requested: - - - - - - - - - - - - - - - - - - - - - - - - - - - Decrease in Increase in Description of Change Contract Price Contract Price PR-#4 1. Furnish and install 2" conduit with sweeps for solar table. Material: $299.01 Labor: $14195.20 OH&P: $62.79 Net Change in Contract Price: - - - - - - - - - - - - - - - - - - - - - - - - - - - The sum' of S $1,551.00 is hereby added to to the total contract price. (added to or deducted from) The time for completion is _the same _, by zero_ days. This document will become a supplement to the contract and all provisions of the contract will apply here to, HUBBAR.D ELECTRIC, INC, Auk' d Signature Authorized Signature HUBBARD ELECTRIC, INC Electrical Contractor 14166 Bank St. Becker, MN 55308 Phone:(763) 263-8334 CONTRACT POTENTIAL/CHANGE ORDER 41 Date: 6/25/2021 Job # Orono Park Site Improvements Contract For: Electrical Owner/Contractor: City of Elk River / New Look Construction The following changes from the contract plans and specifications are hereby requested: Decrease in Increase in Description of Change Contract Price Contract Price PR - #4 . 1. Revise conduit and wire alignment to accommodate shelter hookup. 2. Add # 1 NMC with # 12 tracer wire including directional boring under Gary Street / adjacent trail and add (2)16"xl6" handholes for future pickleball court lighting. Material: $5,025.46 Labor: $7,734.40 OH&P: $631.14 Net Change in Contract Price: The sum of S $13,391.00 is hereby added to to the total contract price. (added to or deducted from) The time for completion is -thesame by zero_ days. This document will become a supplement to the contract and all provisions of the contract will apply here to. HUBBARD ELECTRIC, INC. _ thor' ed gnature Authorized Signature LOOK_ C(ONTRACTIM6 14045 Northdale Blvd., Rogers, MN 55374 -1 () It 14 1 � M 114, F f1l: 1 '12 1 57049 EXTRA TIME & MATERIAL WORK Job Name: Orono park DATE: S/14/2021 Location of Work: IShefter Owner: icity Owner's Re SRF Ll Description of Work: F&I 7' conduit for table in shelter L.abored0narator Name r I Units Rate Total 2 hr $ 85.00 $ 170.00 $ - $ - _ $ - ssuubtotaall $ 170.00 Rate 1$ - Operator 2 hr $ 105.00 $ 210.00 Laborer 2 hr Is 100.00 $ 200.00 Super Is 110.00 $ - is - avvwMe I .p Ylu.vu Materials 4uantlty Rate $ - 2" ached 80 PVC conduit 30 K $ 6.00 $ 150.00 2" sweeps and 45's 6 as $ 25.00 $ 150.00 Furnish 2" pvc sleeve for posts 30 If $ 5.00 $ 150.00 Note this conduit may have to be regular PVC - "electrical conduit" is not available from our supplier at this time. $ - $ - subtotal $ 450.00 Material taxes 7.25% $ 32.63 Mark up on total 10% $ 106.26 W/ New look Con TOTAL: $ 1,168.89 Date: 8/16/2018 Date: SRF PROPOSAL REQUEST Date: 07/15/2021 Project: Orono Park General Site Improvements 18599 Gary Street Elk River, MN 55330 Owner: City of Elk River 13065 Orono Parkway Elk River, MN 55330 SRFNa 13673 A PR No.: 005 To: Wyatt Gutzke New Look Contracting 14045 Northdale Boulevard Rogers, MN 55374 From: Tim Wold SRF Consulting Group, Inc. 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for proposed modifications to ContractDocuments: Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: ® Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ❑ Other 1. Furnish and install three (3) card reader raceway installations on the bathroom facility doors and power pack hookup. Cabling and card reader hardware to be furnished and installed by others. .f Labor $ ��F.�J, 7 S Materials $ Z d ' Z_`.7 OH&P $ 'i� lD0 (Add) J>42M O • Dl� (CircleOne) 2. Refeed and connect two (2) existi ngshelters adjacent to the playground. Power supplying both shelters has. previously fed frotri pedestals north of the shelters that have been removed. Includes setting three ( 3) new ground boxes and utilizing two existing feeds from existing service on the south side of the park. 3701 WAYzKrA BOULEVARD, SUM 100 1 lvhN EAPOLIS, MN 55416 1 763.475.0010 1 WWW.SRFCONSU1:nNG.00M Page 2 of 2 Labor $ Z'! .5 Materials $ OH&P �' Z (Add) (D w (Circle One) PR No. 005 3. F i.a 1'1 h tall 2" PVC conduit for future electric vehicle charger to located at the south end 11 �V1�J sVe ag lot. Conduit shall be directionally bored under Gary Street to utilizel ng source on the power pole as discussed with Elk River Municipal Utilities. U V-" Labor $ 2 t 7 4 Materials $ Z OH&P $ / *+rim (Add) e t $ ?� (Circle One) TOTAL ADD/DEDUCT: $ Does Proposed Change(s) involve a change in Contract Time? �No ❑ Yes (Increased)(Decreased) _ days. Attachments: None Request By: Tim Wold, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River H \Pnje is\ 13000\ 13673\Cnudmd1oa\0rono Park\Cowrael GGauges\Pmpnm/ Regj ws\PR #9 EkdMx 071421.d6m HUBBARD ELECTRIC, INC Electrical Contractor 14166 Bank St. Becker, MN 55308 Phone:(763) 263-8334 CONTRACT POTENTIAL/CHANGE ORDER #3 Date: 7/9/2021. Job # Orono Park Site Improvements Contract For: Electrical Owner/Contractor: City of Elk River / New Look Construction The following changes from the contract plans and specifications are hereby requested: Decrease in Increase in Description of Change Contract Price Contract Price Changes based on jobsite walk thru on 4/23/2l with GRFCU Install (3) card reader raceway installations on the bathroom facility doors and power pack hookup. Cabling and card reader hardware provided by others. Material: $260.25 Labor: $1,743.75 Net Change in Contract Price: ZZd�,00 U'1 The sum of S72J0ed Oso is hereby _ added to to the total contract price. (added to or deducted from) The time for completion is the same _ by _zero__ days. This document will become a supplement to the contract and all provisions of the contract will apply here to, HUBBARD ELECTRIC, INC. Au on d 'gnat re Authorized signature HU.BBARD ELECTRIC, INC Electrical Contractor 14166 Bank St. Becker, MN 55308 Phone:(763) 263-8334 CONTRACT POTENTIAL/CHANGE ORDER #4 Date: 7/12/2021 Job # Orono Park Site Improvements Contract For: Electrical Owner/Contractor: City of Elk River / New Look Construction The following changes from the contract plans and specifications are hereby requested: Decrease in Increease in Description of Change Contract Price Contract Price Refeed / hookup (2) existing shelters by the playground. Power supplying those shelters was previously fed from pedestals that got demo'd. Work to include: Set (3) new ground box's, utilize the (2) existing pedestal feeder conduit/feeder from existing service on the south side of the park to supply the new power source for the (2) shelters and the new bathroom building as discussed at the jobsite meeting. Net Change in Contract Price: Material: $2,071.17 Labor: $2,450.00 OH&P: $4-_X"3 � T3 The sum of S S j is hereby added to to the total contract price. (added to or deducted from) The time for completion is _the same _ _ _ _ 4 by zerodays. This document will become a supplement to the contract and all provisions of the contract will apply here to. HUBBARD ELECTRIC, INC. HUBBARD ELECTRIC, INC Electrical Contractor 14166 Bank St. Becker, MN 55308 Phone:(763) 263-8334 CONTRACT POTENTIAL/CHANGE ORDER #5 Date: 7/ 12/2021 Job # Orono Park Site Improvements Contract For: Electrical Owner/Contractor: City of Elk River / New Look Construction The following changes frorn the contract plans and specifications are hereby req - - - - - - - - - - - - - - - - - - - - - - - - - - Decrease in Increase .�in/ DescrNion of Change Contract Price Contract.4" Run futu 2" PVC conduit for the future Electrical Vehicle anger to be located on t west parking lot. Conduit is to be direction bored and run under Crary St t to utilize power source on the power p e across the street. (This is a shorte nd cheaper route to directionallyron across Gary Street than to trench all i way back to the existing servi the south side of the park as originally sug ted.) Net7is Co act The sum of 5 $2 956.00reby _ ad (added to or deducted The time for completion i. the same __ __ __ by _ Material: $181.93 Labor/Bore: $2,736.00 OH&P Price: to the total contract ptice, days. This document will become a suppl tent to the contract and all provisions of the contraNvill apply here to. ELECTRIC, INC. Authorized Sianatt ISS IF SRFNo. 13673 A PROPOSAL REQUEST a Date: 07/29/2021 PR No.: 006 Project: Orono Park To: Wyatt Gutzke General Site Improvements New Look Contracting 18599 Gary Street 14045. Northdale Boulevard Elk River, MN 55330`- Rogers, MN 55374 Owner: City of Elk River From: Tim Wold 13065 Orono Parkway SRF Consulting Group, Inc. Elk River, MN 55330 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: ® Owner Request ❑ Unforeseen Condition ❑ Code Interpretation Other 1. Add two additional 1" PVC conduits with a pull string for additional camera locations. One to be located on the existing light pole on the north side of the play area. The second to be located on the new covered shelter on the southeast corner column to capture the restroom doors. Both conduits will be changed over to rigid conduit upon emergence at the light pole and corner column locations. Both conduits will be run to the electrical room within the new restroom building near the new incoming low -voltage conduit. Labor $ 900.00 Materials $ 2,040.00 OH&P $ 294.00 _ (Add) (Deduct) $_ 3,234.00 (Circle One) 3701 WAYzATA BOULEVARD, SUITE 100 I MnvNEAPoLis, MN 55416 1 763.475.0010 1 VAMSUCONSULTING.COM Page 2 of 2 TOTAL ADD/DEDUCT: Does Proposed Change(s) involve a change in Contract Time? ® No ❑ Yes jncreased)pecreased) _ days. A ovA Attachments: None 6�x" &4, Request By: Tim Wold, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River ?%s1 /a, r PR No. 005 H.\Projects\ 13000\ 13673\ConsImaion\Orono Park\Con1w Changes\Proposal Requesu\PR #S_Ekc&ical 071421.docx ISSRIF PROPOSAL REQUEST Date: 09/13/2021 Project: Orono Park General Site Improvements 18599 Gary Street Elk River, MN 55330 Owner: City of Elk River 13065 Orono Parkway Elk River, MN 55330 OR No.: 007 sEFNe. 13671 A qr- /;.-P / To: Wyatt Gutzke New Look Contracting 14045 Northdale Boulevard Rogers, MN 55374 From: Tim Wold SRF Consulting Group, Inc. 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time fox proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposaL This is not a change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: ® Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ❑ Other 1. Add additional 1" PVC conduit with a pull string for proposed flagpole as shown on the attached plan ELL (approx.. 32 LIB). $ Labor $_ - I f 7 Materials $ 9 7 Ox&P (Add) (Deduct) (Circle One) 2. Add two additional 1'-PVC conduits with a pull string for future skate park lighting as shown on the attached plan PR7.1 (approx. 278 LF). Labor $�'� 'Z l 3701 WnS�zATA BouLEv.,=, SurrF-100 I hftN FAPOLIs, MN 55416 1 763.475.0010 1 %VkV%v.SRNCONSULTING.cohr Page 2of2 Materials OH&P (Add) (Deduct) (Circle One) TOTAL ADD/DEDUCT: $ / Does Proposed Change(s) involve a change in Contract Time? ❑ No Efles (Increased)(Decreased) I days. Attachments: None Request By: Tim Wold, SRF cc Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River PR No. 007 lL\Per\13000\13(73\Cm.rhm w\OnwPan4\Cw1wdaxwA "WRmjwb,\PR#7J�.6rrAwLa91ss1.d ,x Wyatt Gutzke From: Lonnie Spear <lonnie@hubmn.com> Sent: Friday, September 17, 2021 7.47 AM To: Wyatt Gutzke Subject: Revised PR#007 Attachments: Change Order #7&8 Revised.pdf Wyatt, Per the meeting with Michael with the City of Elk River yesterday, please see attached the revised Change orders #7 and #8. Thanks Lonnie Spear Hubbard Electric Office (763) 263-8334 Cell (763) 458-2533 lonniefhubmn.com CAUTION: Thi$.eirail originated from.optsid,e of the.organiza#ion. t)o.not click [inks ox open attachments. unless.yoy �ognlie the sQndnd know the.coptent is safe. NEW N"_�l LOOK= CONTRACTING W 14045 Northdale Blvd., Rogers, NIN 55374 763-241-1596 REVISED -Quote JOB NUMBER: 21-5034 Job Name: Location of Work: Owner: Orono Park DATE: Owner's Rep_: 110.15.21 REV SRF lnorth end of park City Description of W : PR 8 - Furnish and install 1 NEW FLAG POLE Revised to instalN 35 T' fla ole Item # Equipment/Description Quantity I Units I Rate Total 1 Excavate for new pole foundation 1 1 Is 1 $ 500.00 $ 500.00 2 Set pole foundation 1 1 Is 1 $ 1,500.00 $ 1,500.00 3 Erect pole 1 Is $ 500.00 $ 500.00 $ - $ - $ _ I $ _ I P $ - subtotal $ 2,500.00 Laborer/Operator Name Hours Rate Hubbard 1 Is $ 938.75 $ 938.75 Operator 4 hr $ 110.00 $ 440.00 Laborer-2 men 1 8 hr $ 110.00 $ 880.00 Super 3 hr $ 115.00 $ 345.00 subtotal $ 2,603.75 Materials Quantity Rate Flag pole quote w/ 5x8 American Flag 1 I $ 6,317.90 $ 6,317.90 'electrical materials 11 $ 514.25 f $ 514.25 Foundation materials 1 $ 500.00 $ 500.00 $ - Is - $ - I subtotal P $ 7,332.15 Material taxes 7.25% $ 531.58 Mark up on total 1 10% $ 1,296.75 A TOTAL: $ 14,264.23 _ f d f lP T-7d, Date: lifaff g 10.15.21 REV -New Look Contracting, Inc. Date. I 'SR F PROPOSAL REQUEST SRF No. 93673 A Date: 10/25/2021 PR No.: 009-1t1 Project: Orono Park To: Wyatt Gutikc General Site Improvements New Look Contracting 18590 Gary Street 14045 Northdalc Boulevard lick ltiver, MN 55330 Rogers; MN 55374 Owner; City of Elk River From: Tim Wold 13065 Orono lWkway WF Consulting Group, Inc. I Ilk ltiver, MN 55330 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for proposed .modifications to Contract Documents. -Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications. Reason for Change: 10 Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ❑ Other 1. Reconstruct trail connection to existing fishing pier on existing aggregate base as shown on attached sheet PR-9R1. Areas to be reconstructed total approximately 15 SY. s--' 2. Remove existing bituminous trail connection to existing shelter and replace with 6" thick concrete�lk as shown on attached sheet PR 9R1. Proposed new concrete walk area is approximately 477 SF. &/ Labor Materials O14&P (A t1 (Circle One) $ 14Y(, z 3 $ TOTAL AWDEDUCT: s 7 WTI 3701 WAYZATA &w1.1wARD, SUITH 100 1 MINNf.+.A1101.18, NIN 55416 1 763.475.0010 1 %VMV.SRli(:ONsura'INc,(X)NI i Page 2 of 2 Does Proposed Change(s) involve a change in Contract Time? ❑ No Yes (Increased) days. Attachments: Sheet PR-9R1 Request By: Tim Wold, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Brandon Wisner, City of Elk River PR No. 009-R1 I1:\ProjuiAI5WAI5fi73\(;Dx0rWiiw\()MwPurA%\ vjnw(jjtmr,Al%pw/Rrgws/s\fsR#9-r!_6vilOwediautr_10252t.dac\ ddN 14045 Northdale Blvd., Rogers, MN 55374 6odd®K= 763.241-1696 CONTRACTING JOB NUMBER: 21-5034 Revised Quote Job Name: Location of Work: Owner: Orono Park DATE: 1.1.4.21 Owner's Rep: srf Elk River IcIfy Descri tion of Work: PR 9 R1 - change section of trail into sidewalk to existing shelter Item # EquipmentlDeacription Quantity Units Rate Total 1 Re -grade for sidewalk vs bit 477 sf $ 5.00 $ 2,386.00 2 saw cut bit trail 20 0 $ 3.50 $ 70.00 3 Remove bit trail 51 sy $ 1.90 $ 96.90 4 Pave bit trail 15 sy $ 11.00 $ 165.00 subtotal $ 2,716.90 Laborer/Operator (dame Hours Rate Concrete sub 1 Is $ 1,900.00 $ 1,900.00 Operator hr $ 110.00 $ - Laborer - hr $ 110.00 $ - Super 3 hr $ 115.00 $ 345:00 Is - subtotal $ 2,246.00 Materials Quantity Rate $ - Concrete materials 1 Is $ 2,393.00 $ 2,393.00 Bit path credit 53 sy $ (11:00) $ (583.00) $ - $ $ - subtotal Is 1,810.06 Material taxes 7.25% $ 131.23 Mark upon total 10% $ W0.31 Owner/Representative: w+aa New Look Contracting, Inc. TOTAL: $ 7,593.44 Date: 11,4.21 D e: EW 14045 Norlhdale Blvd., Rogers, MN 55374 LOOM 763-241-1596 P66 CONTRACTBIG . . JOB NUMBER: 21-5034 Quo* Job Name: Orono Park DATE: 110.20.21 Location of Work: lexisfing trail connection Owner: lCity Elk River Owner's Re srf Description of Work: PR # 9- remove ansi'replace trail connections - 2 locations Item # E ui mentlDescription Quantity I Units Rate Total 1 saw cut bit trail 20 If $ 3.50 $ 70.00 2 Remove bit trail 51 By $ 1.90 $ 96.90 3 Pave bit trail 51 sy $ 13.00 $ 663.00 Jason told me the orte by the canopy is•going. to be concrete. Can't get a paver in there. $ - Gan do ttiQ one by the boat famp. though. $ We tfi+ill Keel extra time for grading fof.concrete. though subtotal $ 820.90 LaborertoLwrator Name Hours Rate ... *** **Void + r+evised per. R g R 1 •.I.ns.. $ - Operator hr $ 110.00 $ - Laborer - hr $ 110.00 $ - Super 2 hr $ 116.00 $ 230.00 $ - subtotal $ 230.00 Materials Quantity Rate $ - $ - $ - $ - $ - subtotal $ - Material taxes 7.25% $ - Mark up on total 10% $ 10 . TOTAL: $ 65.89 Owner/Representative: Date: =10-20.27 New Look Contracting, Inc. Date: Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Minnesota 55422 Ph. 800-622-54251763-546-7787 Fax 763-546-5050 l tim(omnwiplay.com CONSULTANT. TIM NEWGARD 09/24/2021 1 j�j Quote #101903-01-02 City of Elk River- Orono Park Shelter- Change Order- Doors City of Elk River Ship to Zip 55330 Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhecker@elkdvermn.gov 1 RDU Cedar Forest Products - Shelter Doors and Hardware $373.85 $373.85 5 Restocking Cedar Forest Products - Restocking Fee for 5 Doors and Hardware $450.00 $2,250.00 Sub Total $2 623.85 Comments The customer is going to receive a credit for returning the 5 doors and hardware for the Orono Park shelter. The credit is $1,500 per door or a total of $7,500. This quotation is subject to current MinnesotaNVisconsin Playground (MWP) policies as well as the following terms and 1conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out'to Minnesota/Wsconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Owner's Representative will indemnity and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Pricing: f.o.b. factory, firm for 15 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at time of order entry. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; acceptance of equipment and off-loading; storage of goods prior to installation; equipment assembly and installation; safety surfacing; borders and drainage provisions. Page 1 of 2 fu Minnesota / Wisconsin Playground 09/24/2021 0CF'' '! �;3 5101 Highway 55, Suite 6000 Quote #101903-0"2 Golden Valley, Minnesota 55422 ur Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 j tim@mnwiplay.com � } R CONSULTANT. TIM NEWGARD City of Elk River- Orono Park Shelter- Change Order- Doors Order Information: Bill To: Ship To: Company: Project Name: Attn: Attn: Address: Address: City, State, Zip: City, State, Zip: Contact: Contact: Tel: Tel: Fax: Fax: lotance of a ion,�] l Accepted By (printed): /►j V I /[Cf P.O. No: f Signature: Date: Title: PQ��S a..d cV 1 V �v Phone: Facsimile: Purchase Amount: $2,623.85 Page 2 of 2 Minnesota / Wisconsin Playground 10/24/2021 5101 Highway 55, Suite 6000 Quote #101903-01-03 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com CONSULTANT. TIM NEWGARD City of Elk River- Orono Park Shelter- Change Order - City of Elk River Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhecker@elkrivermn.gov Ship to Zip 55330 DescriptionQuantity Part # 1 Add'I Concrete Other - Install an Additional 904 sgft exterior concrete sidewalk/shelter pad @ 61. $9,012.00 $9,012.00 Sub Total $9,012.00 Total $9,012.00 Comments Install an Additional 904 sgft exterior concrete sidewalk/shelter pad @ 6"t for added scope of work that was originally included in New Look's Scope of work. This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Owner's Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; acceptance of equipment and off-loading; storage of goods prior to installation; equipment assembly and installation; safety surfacing; borders and drainage provisions. Page 1 of 2 Minnesota / Wisconsin Playground 10/24/2021 TR Wll,} 5101 Highway 55, Suite 6000 Quote #101903-01-03 O t Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-5050 1 tim@mnwiplay.com z'' CONSULTANT: TIM NEWGARD City of Elk River- Orono Park Shelter- Change Order - Order Information: Bill To: Company: Attn: Address: City, State, Zip: Contact: Tel: Fax: Acceotance of quotation: Accepted By (printed): Signature: Title: Facsimile: Ship To: ! _ _ Project Name: Attn: Address: City, State, Zip: Contact: Tel: Fax: P.O. No: Date: Phone: Purchase Amount: $9,012.00 Page 2 of 2 97 0 Companies, Inc. 13792 24791 Avenue - Zimmerman, MN 55398 Phone (7631274-0925 Fax (7631274-0928 ROLL -OFFS * SEPIK SYSTEMS D(CAVATING LANDSCAPING * DEMOLITION BILL TO City Of Elk River 13065 Orono Parkway Elk River, Mn 55330 , DESCRIPTION DEMO 20 Yard Box Box overweight charges DEMO 20 Yard Box Box overweight charges DEMO 20 Yard Box Box overweight charges DEMO 12 Yard Box DEMO YARD WASTE TAX Box overweight charges Thankyou INVOICE DATE INVOICE # 11/10/2021 ! 20306 1 PROJECT Orono Park DROP DATE I QTY I BOX YD Rs p�+rsfo6n R��1 �ao� 4-45`►a-�53o 7/6/2021 1 20 1.22 9/8/2021 1 20 6.21 9/13/2021 9/29/2021 1 7.64 1 72 4 Pill 12 SUBTOTAL RATE I AMOUNT 356.00 356.00 105.00 128.10 356.00 356.00 105.00 652.05 356.00 356.00 105.00 802.20 272.80 27Z80 0.60 43.20 0.00 0.00 $2,966.35 * Payment Terms (unless otherwise noted above) are: Payment is due when Payments/Credits $0.00 customer is invoiced. * All past due amounts are subject to a finance charge atthe maximum rate BALANCE DUE 2 966.35 allowed by state law, plus all costs of collections including attorneyfees if incurred. Returned Checks will be charged a $30.00 Fee. * All prices are based on cash or check payment. Alternate payment types may be charged additional 3% convenience fee. �L Elk Rlver\-We=, MunIcIpalutilities 13wo pb"IPCOMAN CITY OF ELK RIVER 13065 ORONO PARKWAY ELK RIVER MN 55330 Account: 6 STATEMENT: 657 Statement Date: 11/30/2021 Statement Period: Oct 2021 Total Due., 4,840.75 Current Due; 0.00 1 - 29 Past Due: 0.00 . 30 - 59 Past Due: 4,840.75. 60 - 89 Past Due: 0.00 90 & Over Past Due: 0.00 Page 1 of I 10/19/2021 1466 Commercial Water connection 4greement Q 18599 Gary St (Orono 4,840.75 4,840.75. Park)and meter Product Une Description Qty Line Amt Tax WATER AVAILCRG C- Commercial Water Availability Charge 1.000 383.00 0.00 WATER CONNECT' C Commercial Water Connection Charge 1.000 3,532.00 0.00 WATER MISCELLANE Water meter 11/2" 1.000 925.75 0.00 4,840.71 0.00 4,840.75 Total Due: 4,840.75 ~� ati � 4 F5qL(-q5,30 Our records in" kite your account has unpaid invoices. Please remit payment. Eliactroniic�.pa,y4nent,c-airae made oappe-py vjsjqnqour!1 Ds , -qerrnumn;coM AL, FA Rlver+il Municipal Udlities 13M OF&*." j P01k. 435 0 Rkw , WN 3333NX32 1793.Gi2uu CITY OF ELK RIVER 13065 ORONO PARKWAY ELK RIVER MN 55330 statemenT rZte-:T!/0/2021 —IT-0fill —Due. 4;840.75: Statement: 657 Amount Account: 6 Enclosed-i Remit To: ELK RIVER MUNICIPAL UTILITIES 13069 ORONO PARKWAY P.O. BOX 430 ELK RIVER MN 55330 YAC/Ebert Change Orders Change # PR # Date Brief Description I Total Cost 1 001 7/20 Revising water services to come off well near the concessions building $-738.00 Subtotal $-738.00 2 002 9/28 Revise site improvements based on shifting restroom bldg. 11 ft to the west $8,908.44 2 004 9/28 Add electric feed to new building $7,258.00 Subtotal $16,166.44 3 003 10/18 Increase water service size to restroom building from 1" to 2" $1,074.96 3 005 10/18 Increase vent pipe size for concessions building per plumbing plan review $736.16 3 006 10/18 Add gypsum board due to poor backing material. Replace moldy insulation and poly in ceiling of concessions building. $4,298.04 3 0010 10/18 General contractor overhead and profit/bonds not included in Change order 2 $1403.65 Subtotal $7,512.81 4 007 10/12 Replacement windows $9,314.06 4 009 11/18 Pressure Reducing Valve $332.56 4 0011 10/14 Irrigation Valve Box $1,054.73 4 0012 10/22 Paint Columns $887.91 4 0013 10/25 Boarding up windows $719.04 4 0014 11/11 Credit for no longer installing the column wraps -Ebert labor -665.00 008 11/27 Subtotal Alternate BID accepted North Valley Bituminous $11,643.30 $18,204.49 Subtotal Grand Total $17,392.55 $51,977.10 N:\Departments\Parks and Recreation\Administration\Projects\Orono Park and YAC Active Elk River\Changes orders (Updated 12-2-21) MN/Wisconsin Playground Change Orders PR # Change Date Brief Description 10/18 YAC Shelter 2 x 26 Concrete Building Total Cost 001 1 $594 2 10/21 Concrete Finish for sidewalk $5,281 3 10/26 Concrete pad between building and asphalt path (deduct $2,500 from Ebert) E2, Total $8,375 N:\Departments\Parks and Recreation\Administration\Projects\Orono Park and YAC Active Elk River\Changes orders (Updated 12-2-21) .x EBERT To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph:763/635-1060 Fax:7631635-1090 Description: Revised Water Lines Change Proposal MISS Number: PR001 R Date: 7120121 Job:6484 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following changes: Revise Water Service per PR001 and as noted. Excludes tree/plantings removal and resortation of distrubed areas and additional asphalt removal. Assumes asphalt base will be salvaged for reuse. The total amount to provide this work is.................................................................................................. (Please refer to attached sheet for details.) If you have any questions, please contact me at (763)498-7844. 23350 County Road 10 Corcoran, MN 55357 Ph: 763-488-7844 qu Sow VI q-017 -�cb►.of nl�� R�mav� $-738.00 Submitted by: Josh Nichols Approved by: _ Ebert Constuction Date: • / _ _. Page 1 of 2 �t EBERT OONGTNOOTION Change Proposal PRO01 R Price Breakdown Continuation Sheet Description: Revised Water Lines 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-78M Description Labor Material Equipment Subcontract Other Price Credit Water Connections - Winberg $-4,530.00 $4,530,00 Prep for asphalt $1,400.00 $1,400.00 Credit Boring - Mayers $-7,600.00 $-7,600.00 Added asphalt patch - Ornann $1,492.00 $1,492.00 Water Utilities - Hobs $8,500.00 $8,500.00 Subtotal: $-738.00 Self -Performed OH&P $0.00 Sub -Performed OH&P $0.00 Bond & Insurance $0.00 Total: $-738.00 Page 2 of 2 SRF No. 13673_C September 28, 2021 CHANGE ORDER NO. 2 Cir)- of kA River 13065.Ororlo. Pa�icat s� Elk River MNI 55330 PROJECT: Youth &LIcdc Comfrlex Concession BuWing Renovation and 5itr Work CONTRACTOR: n _' n 2,33�6 Quni), d 1.0 _ Qorcom@., �N 5533 WHEREAS: Proposal Request #2 — Add $8,908.44 '< RXgpqsjg t #4 - 7. 00 Change Order #2 Totak • $16,166.44 THEREFORE: In accordance with the terms of the Contract, Ebert Construction is hereby authorized to perform the improvements as described above. ORIGINAL CONTRACT SUM L20? 200.00 NET CHANGE BY PREVIOUS AUTHORIZED CHANGE. ORDERS CURRENT CONTRACT SUM CHANGE ORDER #Z NEW CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER ISSUED BY: I'1w 1k'old .Senior Associate 2127I2021 SRF CO LTING GROUP, INC. DATE ACCEPTED: i � i cr _ � S azn EBERT CONSTRUCTION DATE MOVER. r :r CITY OF ELK RIVER 71)ATE «;38(?''-- - S2�7.462.00 slb,466.44 _ _ -_-- �Z83,628�4 3701 WAYZATA BOULEVARD, SUITE 100 1 MINNEAPOLIs, MN 55416 1763.475.0010 1 WWW.sRFCONSULTWG.coM Hubbard Electric ISRF SRFNo. 13673_C PROPOSAL REQUEST Date: 08/25/2021 PR No.: 002 Project: Youth Athletic Complex To: Nick Schmidt Concession Building Ebert Construction Renovation and Site Work 23350 County Road 10 9950165`s Avenue Corcoran, MN 55357 Elk River, MN 55330 Owner: City of Elk River From: Mike Aaron 13065 Orono Parkway SRF Consulting Group, Inc. Elk River, MN 55330 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications Reason for Change: ❑ Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ® Other 1. Revise site improvements based on shifting the restroom building 11 feet to the west per revised plans attached and dated August 24, 2021. Labor Materials OH&P $ 759.00_ S 710.00 $146.00 (Add)(Deduct) $1615.00 _ — (Circle One) TOTAL ADD/DEDUCT: $ 1615.00 Does Proposed Change(s) involve a change in Contract Time? ® No ❑ Yes 3701 WAYZATA BOULEVARD, SurrE 100 1 MINNEApoms, MN 55416 1 763.475.0010 1 W W W.SRFCONSULTING.COM Page 2 of 2 (Increased)(Decreased) _ days. Attachments: 13673_PR02 SiteSheets_082521.pdf Request By: Mike Aaron, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River Tim Wold, SRF PR No. 002 H.•\Prsjeds\ 13000\ 13673\Consime6n\YAC\C&a&ad Cbanges\Pnposal ReguestAPR #1_070521 \PR_2 082521—Bui/din&Sbif1\PR 2 RealnwmBui/dingSbo 082521.do,x Ebert Construction ISRF SRF No. 13673_C PROPOSAL REQUEST Date: 08/25/2021 PR No.: 002 Project: Youth Athletic Complex Concession Building Renovation and Site Work 9950 165h Avenue Elk River, MN 55330 Owner: City of Elk River 13065 Orono Parkway Elk River, MN 55330 To: Nick Schmidt Ebert Construction 23350 County Road 10 Corcoran, MN 55357 From: Mike Aaron SRF Consulting Group, Inc. 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for proposed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications Reason for Change: ❑ Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ® Other 1. Revise site improvements based on shifting the restroom building 11 feet to the west per revised plans attached and dated August 24, 2021. Labor Materials OH&P (Deduct) (Circle One) $ 1,116.00 S 649.44 $ 1,765.44 TOTAL ADD/DEDUCT: 1,765.44 Does Proposed Change(s) involve a change in Contract Time? M No ❑ Yes 3701 WAYZATA BOULEVARD, SUITE 100 I MINNEAPOLIs, MN 55416 1 763.475.0010 1 WWW.SRFCONSULTING.COM Page 2 of 2 (Increased)(Decreased) — days. Attachments: 13673_PR02_SiteSheets_082521.pdf Request By: Mike Aaron, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River Tim Wold, SRF PR No. 002 H.•\Pmjeas\ 13000\ 13673\Co"fudron\YAC\Coatraa Changer\Pmporal Repaft\PR #1_070521\PRE 082521_B MingShi*\Pli 2 Res[momBuildingSbif!_082521.doex I 'SR F JWinberg Companies PROPOSAL REQUEST SU No. 13673 C Date: 08/25/2021 PR No.: 002 Project: Youth Athletic Complex To: Nick Schmidt Concession Building Ebert Construction Renovation and Site Work 23350 County Road 10 9950 165dAvenue Corcoran, MN 55357 Elk River, MN 55330 Owner: City of Elk River From: Mike Aaron 13065 Orono Parkway SRF Consulting Group, Inc. Elk River, MN 55330 3701 Wayzata Boulevard, Suite 100 Minneapolis, MN 55416-3791 Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for ppropp9sed modifications to Contract Documents. Submit your cost within five days, or notify Architect of the date you anticipate submitting your proposal. This is not a change order or a direction to proceed with the work described in the proposed modifications Reason for Change: ❑ Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ® Other 1. Revise site improvements based on shifting the restroom building 11 feet to the west per revised plans attached and dated August 24, 2021. Labor Materials OH&P $ Cd� (Deduct) $ 5528.00 (Circle One) TOTAL ADD/DEDUCT: $ 5528.00 5528.00 Does Proposed Change(s) involve a change in Contract Time? ® No ❑ Yes 3701 WAYZATA BOULEVARD, SUITE 100 1 MINNEAPOLIS, MN 55416 1 763.475.0010 1 WWW.SRFCONSULTING.COM Page 2 of 2 (Increased)(Decreased) _ days. Attachments: 13673_PR02 SiteSheets_082521.pdf Request By: Mike Aaron, SRF cc: Michael Hecker, City of Elk River Tim Sevcik, City of Elk River Branson Wisner, City of Elk River Tim Wold, SRF M.\Pmjeas\13000\ 13673\Conshuc6n\YAL\Ca#tewt C.7aWs\Pmpasa/Requests\PR #1_070521\PR.2_082521—B#iMagSbft\PR-2 RestmomBmldi#gSluft_082521.doax HUBBARD ELECTRIC, INC Electrical Contractor 14231 Liberty Lane Becker, MN 55308 Phone:(763) 263-8334 CONTRACT POTENTIAL/CHANGE ORDER #2 Date: 9/10/21 Job # Contract For: Youth Athletic Complex Owner/Contractor: City of Elk River / Ebert Construction The following changes from the contract plans and specifications are hereby requested: - - - - - - - - - - - - - - - - - - - - - - - - - - - Decrease in Increase in Description of Change Contract Price Contract Price Run (1) 100amp single phase Electrical feeder to the new bathroom building facility. To be fed from the existing exterior service on site. Material: $2,584.43 Labor: $4,013.75 OH&P: $659.82 Net Change in Contract Price: $7,258.00 The sum of S _ 7.25&00 is hereby _ added to to the total contract price. (added to or deducted from) The time for completion is _the same _ __ _ by zero days. This document will become a supplement to the contract and all provisions of the contract will apply here to. HUBBARD ELECTRIC, INC. Authorized Signature LSRF SRF No. 13673—C October 18, 2021 CHANGE ORDER NO. Cit, of Elk River 13065 Oron Parkwa• a &s= VN 55330 _ PROJECT: Youth AjWXtiC Comdex Concession BuildinR.Rengvation and Site Work CONTRACTOR: Ebert Consi=,iuction 23350 Q= nad 10 Corcoran.MN WHEREAS: Proposal Request #3 — Add $1,074.96, Proposal Request #5 — Add $736.16 `x Proposal Request #6 — Add $4,298.04 k Proposal &4ueg #10 — Add k1.413,65 X Change Order 43 Total: $$^7 522.81 THEREFORE: In accordance with the terms of the Contract, Ebert Construction is hereby authorized to perform the improvements as described above. ORIGINAL CONTRACT SUM S262. 00.000 NET CHANGE BY PREVIOUS AUTHORIZED CHANGE ORDERS15.4244 CURRENT CONTRACT SUM S283,628.44 CHANGE ORDER #2 V.522.111 NEW CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $2.91.151.25 .- ISSUED BY: Tim Senior ate 10 18,2021 SRF COO . 7LTING GROUP, INC. DATE ACCEPTED: Nick Schmidt Pro ect Manager 1012012021 EBERT CONSTRUCTION DATE APPROVED BY: CITY OF ELK RIVER DA E 3701 WAYZATA BOULEVARD, SUITE 100 1 MINNEAPOLIS, MN 55416 1763.475.0010 1 WWW.SRFCONSULTING.COM ' A' 4 CON>ATNYOTI ON To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph: 763/635-1060 Fax: 7631635-1090 _ — - - -- -_...- - . —- - - -- _... -i.. I Change Proposal Number: PRO03 Date: 10/12/21 Job: 6484 Elk River Youth Complex Phone: Description: Water Distribution Piping We are pleased to offer the following specifications and pricing to make the following changes: /hater Distribution Piping: Increase the speed 1" line to a 2" tine. 23350 County Road 10 Corcoran, MN 55357 Ph 753-498-7844 Thetotal amount to provide this work is.................................................................................................. (Please refer to attached sheet for details.) -' 11 If you have any questions, please contact me at Submitted by: Ebert Construction, Inc. Approved by: Date: I $1,074.96 Page 1 of 2 r esiewr CONBTRYCTION Contractor: Ebert Construction 23350 County Road 10 Corcoran, MN 55357 Description: PR#3, 5, 6, 10 The Contract is changed as follows: PRO03 Water Distribution Piping PRO05 Plumbing PRO06 Ceiling Re -build PR0010 Project Management 23350 County Road 10 Corcoran, MN 55357 Ph : 763-498-7844 Change Order { Change Order: 3 Date: 10/20/2021 Job: 6484 Elk River Youth Complex $1,074.96 $736.16 $4,298.04 $1,413.65 TOTAL: $7, 522.81 The original Contract Amount was.....................................,........................................................................... $268,200.00 Net change by previously authorized Change Orders....................................................................................... $15,428.44 The Contract Amount prior to this Change Order was..................................................................................... $283,628.44 The Contract will be increased by this Change Order in the amount of.............................................................. $7,522.81 The new Contract Amount including this Change Order will be......................................................................... $291,151.25 The Contract Time will be increased by 1 week. The date of Substantial Completion as of the date of this Change Order therefore is 12/2/2021 ARCHITECT CONTRACTOR OWNER Ebert Construction 23350 County Road 10 Corcoran, MN 55357 Signed Date Signed Date Signed Please sign and return Original to Ebert Construction Date EBERT OCNSTRYCTION To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph: 763/635-1060 Fax: 763/635-1090 Description: Water Distribution Piping We are pleased to offer the fa Water Distribution Piping:lncr The total amount to (Please refer to If you have any questions, pie Submitted by: Ebert Construction, Inc. 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 Change Proposal Number: PRO03 Date:10/12/21 Job: 6484 Elk River Youth Complex Phone: Approved by: Date: Page 1 of 2 EBERT cowerwccrIow Change Proposal PR003 Price Breakdown Continuation Sheet Description: Water Distribution Piping Description Labor Material Equipment Subcontract Water Utilities ` — — _ — — $998.80 Self -Performed OH&P Sub -Performed OH&P Bond & Insurance 23350 County Road10 Corcoran, MN 55357 Ph: 763.498-7844 Other Price $998.80 Subtotal: $998.80 $0.00 $998.80 5.00% $49.94 $1,048,74 2.50% $26.22 Total: $1,074.96 Page 2 of 2 �36�T oowarwuoriow Change Proposal PRO03 Price Breakdown Continuation Sheet 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 Description: Water Distribution Piping Description Labor Material Equipment Subcontract Other Price Water Utilities $998.80 $998.80 Subtotal: $998.00 Self -Performed OH&P $0.00 Sub -Performed OH&P $998.80 6,00% $49.94 Bond & Insurance $1,048.74 2.50% $26.22 Total: $1,07.4.96 Page 2 of 2 Robs Excavating 0165th Ave Elk River, MN f River MN f OYl212021 Hobs Job No. 21.70 YAC Mcription of thange: {Field Change Order (FCO) No: 1 j Brief Description: Pipe change II Initiated b is Jamie Hinton. PM for Mobs �J j Additional Notes: Change in pipe sizing j Nature of Change: --_ -_ - -- - - Reason for Change: j jProposed Contract AdJustmorMir 1. Contract ost Adjustment DescriOwcn: Manhoura Quantity V of M lCost Ea tee nsion _ Lab9r: ! I Materials: Pine and flttin s 1 LS $ 9M.00 is 908.00 Equ pment: Subcontract: Mob infout) T EA $ 260.00 1 $ __ Subtote a: 0 Engineeringc Construction OHP: 3 908.00 $ $ 90.80 0 0.1 cce nce z on: This Field Change Order, when executed, constitutes an a uth ori zabo n by Own ar, end en obpgation or _ohtractor to proceed with Additional Work I accordance with all provisions of the Contract, except as modified by this Field Change Order. This Field Change Order shall be Incorporated Into a Contract Amendment/Change Order at the earliest convenience of the Iiartles. Hobs xcava ng `not appi.ca;le YAC reement Recommendation Approved_ _ Name: Jame Inton i name_t _ name) Title: Proem Manager Date: laflZILludl 10/12/2021 3:15 PM 21.70 FCO fcot 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 E3S-IT 60N®1'RUOT90H Clhange Proposal To: City of Elk River Nurn4er: PRO05 Building Department Bate: 1QI11121 13065 Orono Parkway Job: 604 Elk River Youth Complex Elk River, MN 55330 Phone: Ph: 7631835-1060 Fax: 7631635-1090 Description: Plumbing I We are pleased to offer the following specifications and pricing to make the following changes: Revison of vent pipe sizes per the RAN plumbing code review. I The total amount to provide this work is.................................................................................................. $738.18 (Please refer to attached sheet for details.) f If you have any questions, please contact me at . i Submitted by: Ebert Construction, Inc. Approved by: Date: Page 1 of 2 i 63SCIT Description: Plumbing i Description Plumbing Change Proposal PRO05 Price Breakdown Continuation Sheet 23350 County Road 10 Corcoran. MN 55357 Ph: 763.498-7644 Price $684A0 i $684.00 $0.00 $34,20 $17.9C� $736.16 Page 2 of 2 Labor Material Equipment Subcontract Other 3". 1LY„t�•��: �+'r�JSI..�' '.Y ••�•.�•. - e._!_�_.i— �-�.�. 3i �' :�... ��'e .v..� 1__ a a1. �..2.:: r. �N4f9tlt9YP�e'CY.J3` Adam Gust: 0 h, 8 i0 Norths;d . i + -lex iA. •�. 11f 1Y n1cal Inc. WING SERVICE �. »Il�IIE{hpriit UO 64849 Proposal To: Ebert Construction �Taate: 10111/2021 Job Name: Elk River YAC - PR S Job Location: Elk River, MN PR - 5: Revise vent pipe sixes per MN plumbing code review. Total Cost: $684.00 i r^ � n Thank You! yAuthorization Signature: _ _ Date: a l d(/202I Signature of Acc tance: Date: ! /2021 This proposal is valid for it period of thirty (30) days. egawr To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph:763/635-1060 Fax:753/636-1090 Change Proposal Number: PR906 Date: 1011 /21 Job: 6484 Elk River Youth Complex Phone: Description: Ceiling Re-bulld i We are pleased to offer the following specifications and pricing to make the following changes: Added amount for insulation, poly and gypsum on the first floor ceiling. I The total amount to provide this work is ........................................ (Please refer to attached sheet for details.) Please note that Ebert Construction will require an extra 1 week. If you have any questions, please contact me at, Submitted by: Ebert Construction, Inc. Approved by: Date: 23350 County Road 10 Corcoran, MN 55357 Ph: 763-4W?844 i $4,298.04 Page 1 of 2 To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 56330 Ph:763/835-1060 Fax:7631636-1090 Description: Ceiling Re -build Change Proposal Number: PRQQ6 Date: 1011121 Job: 6484 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following changes: Added amount for insulation poland�yps_ um on the first floor ceiling. The total amount to provide this work is.................................................................................................. (Please refer to attached sheet for details.) Please note that Ebert Construction will require an extra 1 week. If you have any questions, please contact me at. Submitted by: Ebert Construction, Inc. `0y, Approved by: Ojy��� Date: 23350 County Road 10 Corcoran, MN 56357 Ph: 763-498-7844 $4,298.04 Page 1 of 2 Change Proposal PRO06 Price Breakdown Continuation Sheet Description: Ceiling Re -build 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 Description Labor Material Equipment Subcontract Other Price Gypsum Board $1,458.03 $1,458.03 Thermal Insulation $2,535.50 $2,535,50 Subtotal: $3,993.63 Self -Performed OH&P $0.00 Sub -Performed OH&P $3,993.53 5.00% $199.68 Bond & Insurance $4,193.21 2.50°Jo $104.83 Total: $4,298.04 Page 2 of 2 EBERT COWWWuerraw Change Proposal PROW Price Breakdown Continuation Sheet Description: Ceiling Re -build Description � _ lLabor Gypsum Board Thermal Insulation 23350 County Road 10 Corcoran, MN 55357 Ph: 763.498.7844 Material Equipment Subcontract Other Price $1,458,03 $1,458.03 $2,535.50 $2,535.50 Subtotal: $3,993.53 Self -Performed OH&P $0.00 Sub -Performed OH&P $3,993.53 5.00% $199.68 Bond & Insurance $4,193.21 2.50% $104.83 Total: $4,298.04 Page 2 of 2 Elk River Youth Athletic Bldg Request for Change 9950165th Ave NW Elk River, MN 55330 To: Ebert Construction, Inc. RFC Number: RTL #002 Original Contract $11,959.00 Other Approved Change Orders: $0.00 Total Contract to Date: $11,959.00 Other Pending Requests: $0.00 This Request: $1,458.03 RTL Job # 21-181 Date:9/1/2021 r Description of Change, Add gypsum board to the ceiling that was demo'd. (Taping already I fi ured in base bid) _ Cost Notes/Attachments Labor $ 900.00 Material $ _ 425.48 Total Cost $ 1,325.48 Overhead and Profit $ 132.55 10% Self -Performed Total J _ $1,458.03 Subcontractors $ I 0.00 Overhead and Profit on Subs $ 0.00 ' Subcontractor Total $0.00 l Total Change in Contract $1,458.03 1 I I Labor �--I�ours _ Gate 5heetrocking� r 10_ $90.00 $900.00� Labor Total 10 __ $900.00 �Matterial �Tot aI Material Total $425.48 The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Upon approval the sum of $1,458.03 will be added to the contract price. Authorized Signature:__-- _ Date: Ebert Construction, Inc. 6 EBERT BONBTRYCTION To: City of Elk Rlver Building Department 13065 Orono Parkway Elk River, MN 55330 Ph: 763/635-1060 Fax:763/835-1090 Description: Project Management Change Proposal Number: PR0p10 Date: 10/11/21 Jab: 6484 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following changes: OH+P from CO#2 The total amount to provide this work Is.................................................................................................. (Please refer to attached sheet for details.) If you have any questions, please contact me at. Submitted by: Ebert Construction, Inc. 23350 County Road 10 Corcoran, MN 55357 Ph: 763498-7844 $1,413.65 Approved by: A" - - Date: Page 1 of 2 tk 23350 County Road 10 ' Corcoran, MN 55357 Ph . 763-498-7844 �3E�T pgNSTROOTIOR Change Proposal PROM Price Breakdown Continuation Sheet Description: Project Management Description Labor Material Equipment Subcontract Other Price Project Management $1,413.65 $1.413.65 Subtotal: $1,413.65 Total: $1,413.65 Page 2 of" �RF CHANGE ORDER NO. 4 Ci±i, of Elk River 13065 Orono Parkwa . SRF No. 13673_C November 24, 2021 Elk River MN 55330 PROJECT: Youth Athletic Complex Concession Buildin,+ Renowtion.and .Site Work CONTRACTOR: Ebert Construction 23350 Counr}. Road 10 Corcoran: MN 55357 WHEREAS: Proposal Request #7 — Add $9,314.06 Proposal Request #9 — Add $332.56 Proposal Request #11— Add $1,054.73 Proposal Request #12 — Add $887.91 Proposal Request #13 — Add $719.04 Pro __osal.Re, iuest a#14 —Deduct <S665.00> Change Order #4 Total: $11,643.30 THEREFORE: In accordance with the terms of the Contract, Ebert Construction is hereby authorized to perform the improvements as described above. ORIGINAL CONTRACT SUM 5268200.00 NET CHANGE BY PREVIOUS AUTHORIZED CHANGE ORDERS 322,951.25 CURRENT CONTRACT SUM Q91.151.25 CHANGE ORDER #4 $11A43.30 NEW CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER z302,794.55 ISSUED BY: Tim `,,gold Senior Associate 11 22'2021 SRF COS, LTIlVG GROUP, INC. DATE ACCEPTED: Nick Schmidt. Pro'ect Mana er 1211 /2021 EBERT CONSTRUCTION DATE APPROV D BY: -- - �aala, CITY OF ELK RIVER DATE 3701 WAYZATA BOULEVARD, SUITE 100 1 MINNEAPOLIS, MN 55416 1763,475.0010 1 www.SRFcoNsuLTiNG.com ISRF CHANGE ORDER NO. 4 City of Elk River 13065 Orono Parkway Elk River_ MN 55330 SRF No. 13673_C November 24, 2021 PROJECT: Youth Athletic Complex Concession Building 1movation and Site Work CONTRACTOR Ebert Construction 23350 County Road 10 Corcoran, MN 55357 WHEREAS: Proposal Request #7 — Add $9,314.06 Proposal Request #9 — Add $332.56 Proposal Request #11— Add $1,054.73 Proposal Request #12 — Add $887.91 Proposal Request #13 — Add $719.04 Proposal Request #14 — Deduct <S665.00>>. Change Order #4 Total: $11,643.30 THEREFORE: In accordance with the terms of the Contract, Ebert Construction is hereby authorized to perform the improvements as described above. ORIGINAL CONTRACT SUM $268,200.00 NET CHANGE BY PREVIOUS AUTHORIZED CHANGE ORDERS CURRENT CONTRACT SUM CHANGE ORDER #4 NEW CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER ISSUED BY - Tim Wold Senior Associate 11/22i2021 SRF CONY, GROUP, INC. DATE ACCEPTED: Nick Schmidt, Project Manager EBERT CONSTRUCTION APPROVED BY: CITY OF ELK RIVER 121112021 DATE DATE $22,951.25 S.291.151,25 $11,,643.30 302,794.55 3701 WAYZATA BOULEVARD, SUITE 100 1 MINNEAPOLIS, MN 55416 1 763.475.0010 1 WWW.SRFCONSULTING.COM E3EaT CONSTRUCTION To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph: 7631635-1060 Fax: 763/635-1090 Description: Window Replacement Change Proposal Number: PROfl7 Date: 10/12/21 Job: 6404 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following changes: Window replacement from the suspected vandalism on the second story windows. The total amount to provide this work is......................................:...............................................I......,... (Please refer to attached sheet for details.) Please note that Ebert Construction will require an extra 10 weeks. If you have any questions, please contact me at. Submitted by: Ebert Construction, Inc. Approved by: Date: • *: s 23350 County Road 10 Corcoran, MN 55357 Ph : 763-498.7844 $9,314,06 Page 1 of 2 EBERT CONSTRUCTION Change Proposal PRO07 Price Breakdown Continuation Sheet Description: Window Replacement Description Windows Labor $3,040.00 23350 County Road10 Corcoran, MN 55357 Ph: 763-498-7844 Material Equipment Subcontract Other $4,861.64 Subtotal: Self -Performed OH&P $7,901.64 15.00% Sub -Performed OH&P Bond & Insurance $9,086.89 2.50% Total: Price $4,861.64 $3,040.00 $7,901.64 $1,185.25 $0.00 $227.17 $9,314.06 Page 2 of 2 a . . . . . . . . . . . . =:t7F C30NMTRUC COST ISSUE DATE: 10/14/2021 TO: Nick Schmidt Ebert Construction 23350 County Road 10 Corcoran, MN 55357. PR JECT: 6484 Elk River YAC RE: PR #Window Replacement DATE: 10/4/2021 TIME EXTENSION REQUESTED. ESCRIP ON: Remove 4-each Wood Window, Replace with new Maintenance free Windows. MATERIAVLABOR BREAK -DOWN I AMOUNT Remove 4-each woad windows, insta i new Carpenter windows. 32 hrs @ $95.00 hr -- $3,040.00 Total Cost $3,040.00 TOTAL. ADDITIONAL COST: $3,04Q.00. EBERT CONSTRUCTION. Prepared By: Kevin Roehl OMS Ver. 0003.10.00 (Current) Product availability and pricing subject to change. PURCHASE APPROVAL/SIGN OFF Elk River Window Replacement Elk River Window Replacement Quote Number: SPZSTQA Project Subtotal Net Price: USD 1,133.25 0.000% Sales Tax: USD 0.00 Project Total Net Price: USD 1,133.25 (, (33.2 5 for l w (' (Jow . 4 am r wea plus mac. I have reviewed all line item quotes in detail and agree that the product specifications and pricing are accurate, and I approve the project for order. I acknowledge that additional charges, tax or Terms and Conditions may apply. Seller: Buyer: OMS Ver. 0003.10.00 (Current) Processed on: 10/12/2021 10:09:47 AM Page 4 of 4 E3E�T CON®TRYOTION To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph:763/635-1060 Fax:763/635-1090 Description: Pressure Reducing Valve (- Change Proposal Nkimber: PRO09 Date: 1118121 Job: 6484 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following cha Installing a pressure reducing valve to ensure safe pressure for building. The total amount to provide this work is ....................................... (Please refer to attached sheet for details.) If you have any questions, please contact me at . Submitted by: Ebert Construction, Inc. Approved by: -_ Date: 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 Page 1 of 2 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-78" EBERT oor+stRUCTIOe Change Proposal PRO09 Price Breakdown Continuation Sheet Description: Pressure Reducing Valve Description Labor Material Equipment Plumbing Subcontract $309.00 Other Price $309.00 Subtotal: $309.00 Self -Performed OH&P $0.00 Sub -Performed OH&P $309.00 5.00% $15.45 Bond & Insurance $324.45 2.50°% $8.11 Total: $332.66 Page 2 of 2 GUSTAFSON Mechanical Into PLiJI►'mBING HEATING SERNt+CE Proposal To: Ebert Construction Job Name: Elk River YAC - PR 9 Job Location: Elk River, MN Adam Gustafson 810 Northside Drive ! Alexandria, M8 56308 f 320-760-6701 fax 320-219-7267 gustdfsonmechanicol@Omoil.corn DO 64849 PR - 9: Install a pressure reducing valve at water supply to building. 1 - 1 " pressure reducing valve. $180.00 2 - 1" male adapters. $34.00 Labor (1hr Qa $95) $95.00 Total Cost. W9.00 Authorization Signature: Signature of Acceptance: Thank You! This proposal is valid for a period of thirty (30) days. Date: 11/812021 Date: e!K/r/2021 Date: / /2021 �3E�T CON8TRYCTION To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph:7631635-1060 Fax:763/635-1090 Description: Earthwork Change Proposal Number. PR0011 Date: 10/14/21 Job: 0484 Elk River Youth Complex Phone: 23350 County Road 10 Corcoran, MN 55357 Ph: 763498-7844 We are pleased to offer the hollowing specifications and pricing to make the following changes: Add the material and installation of an irrigation valve box in order to allow the plumbing inspector to have access to the connection. The total amount to provide this work is.................................................................................................. $1.054.73 (Please refer to attached sheet for details.) If you have any questions, please contact me at , Submitted by: Ebert Construction, Inc. Approved by: - Date: Page 1 of 2 E3�4T CONSTRUCTION Description: Earthwork Description Earthwork 23350 County Road10 Corcoran, MN 55357 Ph: 763-498-7844 Change Proposal PR0011 Price Breakdown Continuation Sheet Labor Material Equipment Subcontract Other Price $980.00 $980.00 Subtotal: $980.00 Self -Performed OHBP $0.00 Sub -Performed OHBP $980.00 5.00% $49.00 Bond & Insurance $1,029.00 2.50% $25.73 Total: $1,054.73 Page 2 of 2 Nick Schmidt From: Brandon Bistodeauabbistodeau.winbergcompanies@yahoo.com> Sent: Thursday, Qctober 14, 2021 1:05 PM To: Nick Schmidt Cc: joeowinbergcompanies.com Subject: Elk River youth complex extra Nick with materials and labor we can place that pipe and hat for $980.00, let me know if we can proceed for tomorrow Grading f Earth WOA Removat d Oemo Utiows superv'1009 Clear & Grub Erosion Control BrIfidon sistodeal • he lad M31298f V 12-290-Mi 7 DF4 III I1 .flQlil Please note my email is updating to brandon@winbergcompanies.com Certified SDVOSB contractor Winberrcomraanies.com Please reach out with any questions or concerns Cell: 622.290-8027 Main: 651-248-S233 Thank you, Brandon Bistodeau 2 FM ESEMIT CONSTRUCTION To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph:763/635-1080 Fax: 763/635- 1090 Description: Painting Change Proposal Number: PR0012 Date. 10/22/21 Job: 6484 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following changes: Painting: Paint the columns instead of vinyl wrap as they are too warpped to get a vinyl sleeve around. The total amount to provide this work is................................................................................................. (Please refer to attached sheet for details.) If you have any questions, please contact me at. Submitted by: Ebert Construction, Inc. 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 $887.91 Approved by: Date: - — - — Page 1 of 2 ( i) EBERT CONSTRUCTION Description: Painting Description Painting 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 Change Proposal PR0012 Price Breakdown Continuation Sheet Labor Material Equipment Subcontract Other $825.00 Subtotal: Self -Performed OH&P Sub -Performed OH&P $825.00 5.00% Bond & Insurance $866.25 2.50% Total: Price $825.00 $825.00 $0.00 $41.25 $21.66 $887.91 Page 2 of 2 Nick Schmidt From: Bruce DeGoller <degolierpainting@gmail.com> Sent: Tuesday, October 19, 2021 4:56 PM To: Nick Schmidt Subject: Re: Elk River YAC: Change Proposal Follow Up Flag: Follow up Flag Status: Flagged Nick, $825.00 Material 150.00 Labor 675.00 On Tue, Oct 19, 2021 at 8:03 AM Bruce DeGolier <deeoliergaintina@g_mail.com> wrote: Yes, we can do that for you. i will get you a price today Thks Bruce On Mon, Oct 18, 2021 at 3:56 PM Nick Schmidt <nschmidt ebertconst.com> wrote: Hi Bruce, 1 was out at the YAC site recently talking with the architect. He mentioned that he would like to get a price to paint the columns around the building. Some details: . 14-15 total columns all covered by the roof/overhang • Requested white paint (same color as building; technical color is called snow white) • Columns are 6" xV pressure treated pine columns that are all about 8' high. Please let me know if you can do this or if you have any questions. P.S. I'll be going back out to the site on Thursday if you would like some pictures of the columns. 1 EBERT aaRTwvarlo W To: City of Elk River Building Department 13066 Orono Parkway Elk River, MN 55330 Ph: 763/635-1060 Fax: 763/635-1090 Description: Boarding Windows Change Proposal Number: PR0013 Date: 10l25/21 Job: 6484 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following changes: Cost for the time and material for boarding up the windows that had rocks thrown through them. The total amount to provide this work is................................................................................................. (Please refer to attached sheet for details.) If you have any questions, please contact me at. Submitted by: Ebert Construction, Inc. Approved by:*�AO Mml Date; 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 $719.04 Page 1 of 2 EBERT CONSTRUCTION Description: Boarding Windows Description Temp Enclosures & Barricades Change Proposal PR0013 Price Breakdown Continuation Sheet Labor Material Equipment Subcontract $425.00 $185.00 Self -Performed OH&P Sub -Performed OH&P Bond & Insurance 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7644 Other Subtotal: $610.00 15.00% $701.50 2.500/6 Total: Price $610.00 $610.00 $91.50 $0.00 $17.54 $719.04 Page 2of2 IVi C.k 23350 County Road 10 Corcoran, MN 55367 Ph; 763-498-7844 aoffSTRUCrION To: City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph: 763/635-1060 Fax:7631635-1090 Description: Ebert Labor Change Proposal Number. PR0014 Date: 11/12/21 Job: 6484 Elk River Youth Complex Phone: We are pleased to offer the following specifications and pricing to make the following changes: Credit for no longer installing the column wraps. The total amount to provide this work is.................................................................................................. (Please refer to attached sheet for details.) If you have any questions, please contact me at. Submitted by: Ebert Construction, Inc. $-665.00 Approved by: Date: — — - - - - - Page 1 of 2 CONSSTRUCTION COST ISSUE 1DATEi 1111il2021 TO: Nick SchmIdt Ebert Construction 23350 County Road 10. Corcoran, MN 50357 PROJECT: - 6484 Elk`River'YA .. RE: PR #Column Wrap Credit DATE: 11/11/2021 TIME EXTENSION REQUESTED: DESCRIPTON: Credit for not installing column wraps at 14. locations. 'MATER1ALlLABOR BREAK -DOWN AMOUNT_.. -.. Carpenter Credit for not Install column wraps; 14- each. 7 hrs @ $95.00 hr = I $665.00 Total Cost 1665.00 TOTAL ADDITIONAL COST: $665.00 EBERT CONSTRUCTION Prepared By: Kevin Roehl / i)� EBERT CONSTRUCTION Description: Ebert Labor I Description Rough Carpentry 23350 County Road 10 Corcoran, MN 55357 Ph: 763-498-7844 Change Proposal PR0014 Price Breakdown Continuation Sheet Labor Material Equipment Subcontract Other $-665.00 Price $-665.00 Subtotal: $-665.00 Self -Performed OH&P $0.00 Sub -Performed OH&P -$665.00 $0.00 Bond & Insurance -$665.00 $0.00 Total: $-665.00 Page 2 of 2 CONSTRUCTION COST ISSUE DATE: 11/11/2021 TO: Nick Schmidt Ebert Construction 23350 County Road 10 Corcoran, MN 55357 PROJECT: 6484 Elk River YAC RE: PR #Column Wrap Credit DATE: 11 /11 /2021 TIME EXTENSION REQUESTED: DESCRIPTOW Credit for not installing column wraps at 14- locations. MATERIAL/LABOR BREAK -DOWN AMOUNT Carpenter Credit for not install column wraps, 14- each. 7 hrs @ $95.00 hr = $665.00 Total Cost $665.00 TOTAL ADDITIONAL COST; $665.00 Prepared By: EBERT CONSTRUCTION _ Kevin Roehl Ph: 763 274 2580 Fax: 763 274-2584 Customer. ELKRIV CITY OF ELK RIVER 13065 ORONO PARKWAY ELK RIVER, MN 55330 INVOICE: 21598*03 Page 1 of 1 Pay Application Date Terms Contract 3 11i27/2021 NET 30 21698 Contract Location Job Coat Project #: 21598 YOUTH ATH COM TRL-ELK RIV YOUTH ATHLETIC COMPLEX TRAIL ELK RIVER, MN 55330 Bid Estimated Previous Current To Date Unit Current To Date Item Description UOM Quantity Quantity Quantity Quantity Price Amount Amount 100 MOBILIZATION LSU 1.000 1.000 101 REMOVE EXISTING SITU MINOUS 5Y 225.000 225.000 102 PREP EXISTING AGGREG ATE BASE SY 370.000 394.000 103 SP 9.5 WEAR (SPWEA24 OC) 2.5 THICK TN 60.000 53.740 104 CASTING ADJ LSU 1.000 1.000 105 WORK AFTER NOV. 1 LSU 1.000 .000 900 MISCELLANEOUS EA 1.000 .000 Total Contract and Change Orders Billing Summary for Contract: 21598 Complete to Date: Sales Tax cQ 0.000% Less Retainage at 0.0% Balance Less: Previous Payments Total Amount Due I,GJV.VV 0.00 n fin .000 1.000 2,911.650 0.00 2,911.65 .0w 225.000 9.620 0.00 2,164.50 .000 394.000 6.740 0.00 2,655.56 .000 53.740 163.710 0.00 8.797.78 .000 1.000 425.000 0.00 425.00 1.000 1.000 1.250.000 1,250.00 1,260.00 .000 .000 10.000 0.00 0.00 Tn flats n nn 1,250.00 18,204.49 A�?V'6A V5y �f- �{ 530 Please Remit To North Valley Inc. 20015 Iguana St. NW Ste 100 Nowthen, MN 55330 Print Date:11129/21 An Equal Opportunity Employer Minnesota / Wisconsin Playground 10/18/2021 5101 Highway 55, Suite 6000 Quote 0101995-0 Golden Valley, Minnesota 55422 �A' 9 Ph. 800-622-64251763-546-7787 Fax 763-546-50601 timCmnwiplay com CONSULTANT., TIM NEWGARD Bwi 14 4 �q City of Elk River- YAK Shelter- 2" x 26' of concrete(Change Order) City of Elk River Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330- . Phone: 763-635-11150 mhecker@elldiverrm.gov 1 Concrete IF Ship to Zip 55330 $594.00 594.001 Sub Total $SWM This quotation is subject to current MinnesotaWisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground. Other - 2' x 26' of concrete Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terns and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Ownees Representative wtfi Indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/OHnees Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Pricing: f.o.b. factory, firm for 15 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at time of order entry. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non4ax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing obstructions/equipment; acceptance of product and off-loading; storage of goods prior to installation; product assembly and installation; concrete work of any type and drainage provisions. Page 1 of 2 Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Mmnesote 55422 Ph. 800-622-54261763446-7787 Fax 763-546-5050 ( dm@mnwiplay.com CONSULTANT. TIM NEWGARD 10/18/2021 Quote # 101995-01-01 City of Elk River- YAK Shelter- 2" x 26' of concrete(Change Order) Order Information: Bill To: Company: Attn: Address: City, State, Zip: Contact: Tel: Fax: Ship To: Project Name: Attn: _ . Address: City, State, Zip: — Contact: Tel: Fax: AMpWgce of 9 on: Accepted By (printed): I I I I P.O. No: Signature: a" '101AV Date: Q 1 Title: & Uv" Phone: Facsimile: Purchase Amo t: S59.t.00 Page 2 of 2 n Minnesota / Wisconsin Playground 10/2112021 5101 Highway 55, Suite 6000 Quote #102008-0 -01 Golden Valley, Minnesota 55422 Ph. 800-622-5425 J 763-546-7787 l Fax 763-546-5050 J fim@mnwiplaycom e� CONSULTANT: TIM NEIWGARD City of Elk River- Change Order- YAK Shelter- Add Concrete Pad/Sidewalk City of Elk River Ship to Zip 55330 Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhedcer@elkdvermn.gov Concrete Other-11'x50'x4"t concrete pad/sidewalk- Concrete to be min 4000 psi w/ a broom finish $5,281.00 $5,281.00 Our bid for the added 11'x50'x4"t concrete pad/sidewalk -supply & install new 4"t concrete sidewalk. Concrete to be min 4000 psi w/ a broom finish. This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to MinnesotalWsconsin Playground. Each quote is handled on a per order/project basis. Unless a long -tern agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Owners Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representafive's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owners Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; acceptance of equipment and off-loading; storage of goods prior to installation; equipment assembly and installation; safety surfacing; borders and drainage provisions. Page 1 of 2 Minnesota / Wisconsin Playground 10/21/2021 5101 Highway 55, Suite 6000 Quote #102008-01-01 Golden Valley, Minnesota 55422 Ph. 800-622-5425 1 763-546-7787 Fax 763-546-50501 bm@mmMplay.com CONSULTANT: TIM NEWGARD City of Elk River- Change Order- YAK Shelter- Add Concrete Pad/Sidewalk Order Information: Bill To: Ship To: Company: Project Name: Attn: Attn: Address: Address: City, State, Zip: City, State, Zip: Contact: Contact: Tel: Tel: Fax: Fax: AM&Anag of e 121amopr Accepted By (printed): l P.O. No: Signature: " ca" Date: - 1 a ) Trite: Phone: Facsimile: Purchase Amount: $5,281.00 Page 2 of 2 Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Minnesota 55422 Ph. 800-622-5425 763-546-7787 Fax 763-546-5050 tim@mnwiplay.com CONSULTANT. TIM NEWGARD 10/26/2021 Quote #102008-01-02 City of Elk River- Change Order- YAK Shelter- Add Concrete Pad/Sidewalk City of Elk River Ship to Zip 55330 Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhedcer@eikrivermn.gov 1 Concrete Other -Added scope is to install approx 11'x5l'x4"t concrete pad between our building pad and the $2,500.00 $2.500.00 asphalt path. Sub Total $2.500.00 T Total $2,500.001 Comments Our bid for the added 11'x50'x4"t concrete pad/sidewalk This quotation is subject to current Minnesota>Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to MinnesotaNVIsconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Ownees Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owners Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owners Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; acceptance of equipment and off-loading; storage of goods prior to installation; equipment assembly and installation; safety surfacing; borders and drainage provisions. Page 1 of 2 Minnesota / Wisconsin Playground 10/26/2021 5101 Highway 55, Suite 6000 Quote #102008-01-02 Golden Valley, Minnesota 55422 Ph. 800-022-54251763446-7787 Fax 763-546-5050 1 tim@mnwiplay.cem CONSULTANT: TIM NEWGARD City of Elk River- Change Order- YAK Shelter- Add Concrete Pad/Sidewalk Order Information: Bill To: Ship To: Company: Project Name: Attn: Attn: Address: Address: City, State, Zip: City, State, Zip: Contact: Contact: Tel: Tel: Fax: Fax: gMOance of ouo Accepted By (printed): [ L P.O. No: Signature: _ Date: Titla: l YPhone: Facsimile: Purchase Amount: $2,500.00 Page 2 of 2 Hecker, Michael 'rom: Mike Aaron <maaron@srfconsulting.com> .ient: Tuesday, October 26, 2021 9:53 AM To: Nick Schmidt Cc: Timothy Wold; Hecker, Michael; Sevcik, Tim; Byron Munoz, Tim Mcllwain; Tim Newgard Subject: RE: Elk River YAC: Mobilization charge Nick: Minnesota Wisconsirk-Playground has agreed to construct the 11' slab adjacent to the trail. We will prepare a deduct change order f r $2,500 a0d this work will be removed from your contract. We will also prepare a change order for MAN WI Playground tthe work to their contract. They will complete the concrete work yet today. Let me know if you have any questions regarding this change. Thanks, Mike Michael Aaron, PE (MN), LEED-AP Senior Associate, Municipal Group SRF Consulting Group 3701 Wayzata Boulevard, Suite 100, Minneapolis, MN 55416-3791 Direct: 763.249.6756 1 maaron@srfconsulting.com srfconsulting.com I Facebook I Linkedln I Twitter I YouTube I Ins1ggmM CONFIDENTIALITY NOTICE: The contents of this email message and any attachments are confidential and are intended solely for addressee. The information may also be legally privileged. This transmission is sent in trust, for the sole purpose of delivery to the intended recipient. From: Nick Schmidt <nschmidt@ebertconst.com> Sent: Monday, October 25, 2021 10:51 AM To: Mike Aaron <maaron@srfconsulting.com> Subject: RE: Elk River YAC: Mobilization charge We would like MN/Wl playground crews to pour their concrete as well as our area of concrete. The 2 problems are the price they gave us for them to do this and we do not want to be on contract for that concrete. We estimate that it would be $2,500 for Ebert to go out there and pour the concrete (this does not include the mob and cold weather concrete cost). MN/WI playground crews sent us an estimate of $5,300 for us to hire them to pour our area of concrete. That cost is why we elected not to give MN/WI playground crews our area of concrete. Secondly, Ebert does not want to be under contract as a responsible party as we are not the ones who will be pouring the concrete; if we were to give them the okay to do our area of concrete. What needs to happen for MN/WI playground crews to pour the entire area by the restroom building on Tuesday. 1. The City of Elk River issues Ebert Construction a deduct of contract for the amount by the restroom building. An amount of $2,500 with an understanding that there will not be an additional charge from Ebert on mob and cold weather concrete. 2. The City of Elk River signs anew contract with MN/WI playgrounds or their crew to do the added area of concrete by the restroom building. Again, I would like to reiterate that it would be in all parties' best interests to have MN/WI playground crews pour the sidewalk that Ebert is currently responsible for. Let me know if you have any questions. Thanks, �EBETT CONSTfIlUCT1O111 Nick Schmidt I Project Manager I 'Cell: 763-568-2227 23350 County Road 10, Corcoran, MN 55357 1 'a Phone: 763.498.7844 1 eUFax: 763.498.9951 I Web www.ebertconst.com From: Mike Aaron <maaron srfconsultin .com> Sent: Monday, October 25, 20219:52 AM To: Nick Schmidt <nschmidt@ebertconst.com> Cc: Hecker, Michael <MHecker@ElkRiverMN.eov>; Sevcik, Tim <TSevcik ElkRiverMN.eov>; Timothy Wold <twold@srfconsulting.com>; Tim Newgard <Tim@mnwiplay.com> Subject: RE: Elk River YAC: Mobilization charge Nick: Would it make sense to have MN WI Playground concrete crews pour it on Tuesday when they pour the other slab? We would need to get Tim Nerwgard's input on this and he is out of the office today at a funeral. Thanks, Mike Michael Aaron, PE (MN), LEED-AP Senior Associate, Municipal Group SRF Consulting Group 3701 Wayzata Boulevard, Suite 100, Minneapolis, MN 55416-3791 Direct: 763.249.6756 1 SRF srfconsultin;;.com I Facebook_1 Linkedln I Twitter I YouTube I Instagram CONFIDENTIALITY NOTICE: The contents of this email message and any attachments are confidential and are intended solely for addressee. The information may also be legally privileged. This transmission is sent in trust, for the sole purpose of delivery to the intended recipient. From: Nick Schmidt <nschmidt@ebertconst.com> Sent: Monday, October 25, 20219:44 AM To: Mike Aaron <maaron@srfconsulting.com> Cc: Hecker, Michael < IHecker@ElkRiverMN.go� > Subject: Elk River YAC: Mobilization charge Good morning, As you remember last week Ebert was at site to pour our area of concrete. We did not get to do that as the concrete we were butting up to was not in ADA compliance. Tim Newgard has informed me that their crews are demoing that concrete today (Monday Oct. 25"), repouring tomorrow. Since, our phone conversation this morning, I have been in --ontact with the head of our concrete division who said that they will not be able to get out to pour on Wednesday due co rain and previously scheduled projects getting backed up as well. 1 do not have a set date that we will be able to pour, however I will talk with him after his scheduling meeting today to see if he can give me a date that they can pour. Additionally, since we are getting pushed back there will be a charge of $1200 for mobilization and $864 for the cold weather concrete. These charges come from getting our crews back out to the site and the fact that we are pouring and curing in below freezing temperatures. Let me know if you have any questions. Thanks, CONSTRUCTION Nick Schmidt I Project Manager I 'Cell: 763-568-2227 23350 County Road 10, Corcoran, MN 55357 1 Sii1 Phone: 763-498-7844 W Fax: 763-498-9951 j Web www.ebertconst.com