5.3 ERMUSR 12-12-2021 Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
ERMU Commission Melissa Karpinski— Finance Manager
MEETING DATE: AGENDA ITEM NUMBER:
December 14, 2021 5.3
SUBJECT:
2022 Annual Business Plan (Budget, Schedule of Rates & Fees)
ACTION REQUESTED:
Adopt the 2022 Annual Business Plan
BACKGROUND:
In November, the preliminary 2022 Annual Business Plan was presented to the Commission.
There have been some changes due to the finalizing of projects and expenses. The final
highlights are discussed below.
DISCUSSION:
Electric Budget and Rates
As discussed in November, we are proposing a 5% rate increase for 2022.
Notable items in the electric budget for 2022 are:
• 3%wage adjustment for Office, Field, and Management pay plan groups and a 2.8%
wage adjustment for Line Worker pay plan group.
• Conservative estimate for usage and growth.
• 11%wholesale power rate increase.
• Interest expense on bond for new field services building.
• Administrative expenses for inventory assistant and new general manager to be filled in
2022.
• Administrative expense for Travel and Training; Additional leadership training (all
departments as identified in organizational effectiveness survey) and Management
training (includes strategic planning).
• Replacement of Bucket Truck#4.
• Replacement of Dump Truck#7.
• Purchase of a Bobcat, Forklift, and Sweeper.
• Shared cost in the replacement for Vehicle #1 for Administration and Pickup Truck#2 for
Technical Services.
• Electric Service Territory acquisition loss of revenue for Areas 1&2, 3&4, 5&6, and 7&8
from reserves.
• Highway 169 Redefine project from reserves.
• Highway 10 substation design and construction from reserves.
Page 1 of 2
74
• Advanced Metering Infrastructure (AMI) project from reserves.
Water Budget and Rates
As discussed in November, we are proposing a 2.5% rate increase for 2022.
Notable items in the water budget for 2022 are:
• 3%wage adjustment for Office, Field, and Management pay plan groups.
• Conservative estimate for usage and growth.
• Interest expense on bond for new field services building.
• Administrative expenses for new general manager to be filled in 2022.
• Administrative expense due to wellhead protection plan amendment.
• Administrative expense for Travel and Training; Additional leadership training (all
departments as identified in organizational effectiveness survey) and Management
training (includes strategic planning).
• Replacement of Pickup Truck#32.
• Highway 169 Redefine project from reserves.
• Shared cost in the replacement for Vehicle#1 for Administration and Pickup Truck#2 for
Technical Services.
• AMI project.
Submitted for approval is the 2022 Annual Business Plan which includes the 2022 Budget and
the 2022 Schedule of Rates & Fees. The 2022 fees were already approved by the Commission in
November and are being presented here unchanged. The adoption of the 2022 Schedule of
Rates & Fees through the adoption of the Annual Business Plan shall supersede and replace all
previously adopted tariffs, rates, and fees.
FINANCIAL IMPACT:
Notable items discussed above. As previously discussed, we are proposing a rate increase of 5%
for electric and 2.5%for water.
ATTACHMENTS:
• Proposed 2022 Annual Business Plan
o 2022 Budget
o 2022 Schedule of Rates & Fees
Page 2 of 2
75
.,,
Elk River __,
Municipal Utilities
2022 Annual Business Plan
76
TABLE OF CONTENTS
2022 BUDGET
• Summary of Budgets
• Electric Revenue and Expense Budget
• Water Revenue and Expense Budget
• Electric Capital Budget
• Administration and Technical Services Capital Budgets
• Water Capital Budget
• Training and Travel Budget
• Dues and Subscriptions Budget
• Conservation Improvement Program Budget
2022 SCHEDULE OF RATES & FEES
• Residential All Electric Service Rate
• Residential Electric Service Rate
• Residential Clean Energy Choice Program Rate
• Non-Demand All Electric Service Rate
• Non-Demand Electric Service Rate
• Demand All Electric Service Rate
• Demand Electric Service Rate
• Large Industrial Demand Electric Service Rate
• Transmission Transformed Service Rate
• Commercial Clean Energy Choice Program Rate
• Off-Peak Demand Electric Service Rate
• Commercial All Electric with Ground Source Heat Pump Service Rate
• Ground Source Heat Pump Program Rate
• Electric Vehicle Charging Rates
• Energy Management Program Rates
• Street/Security Light Service Rate
• Water Service Rates
• Fee Schedule
77
Elk River Municipal Utilities
2022 Budget
78
ELK RIVER MUNICIPAL UTILITIES
SUMMARY OF YEAR 2022
BUDGETS
ELECTRIC BUDGET SUMMARY 2022
ELECTRIC REVENUE $ 43,186,605
ELECTRIC EXPENDITURES (41,620,221)
ELECTRIC NET FOR CAPITAL 1,566,384 3.63% 1,565,534 110%annual avg debt svc 3.63%
DEBT RETIREMENT (1,055,000)
PROMISSORY NOTE TO COUNTY (209,124)
NET LESS DEBT PRINCIPAL PMTS 302,260
CAPITAL EQUIPMENT/CONSTRUCTION (6,153,305)
FUND FROM RESERVES 500,000 * Highway 169 redefine
FUND FROM RESERVES 1,000,000 * Hwy 10 Substation
FUND FROM RESERVES 500,000 * AMI
FUND FROM RESERVES 884,185 * Territory Acquisition Areas 1&2,3&4,5&6,7&8 Loss of Revenue
BONDING -
NET (2,966,860)
DEPRECIATION 3,104,833
NET TO RESERVES 137,973 * Note that this is separate from above funding of draw on reserves
WATER BUDGET SUMMARY 2022
WATER REVENUE $ 3,343,069
WATER EXPENDITURES (3,235,395)
WATER NET FOR CAPITAL 107,674 3.22% 107,643 105%debt svc 3.22%
DEBT RETIREMENT (320,000)
NET LESS DEBT PRINCIPAL PMTS (212,326)
CAPITAL EQUIPMENT/CONSTRUCTION (1,725,655)
FUND FROM RESERVES 1,201,575 * Highway 169 Redefine
BONDING -
NET (736,406)
DEPRECIATION 1,199,124
NET TO RESERVES 462,718 * Note that this is separate from above funding of draw on reserves
*Currently,target reserves are met.
79
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER MINNESOTA
2022 ELECTRIC BUDGET
2022 Annual 2021 Annual 2020 Annual
Electric Budget Budget Actual
Revenue
Operating Revenue
Elk River
440.4411 ELECT SALES-ELK RIVER RESIDENTIAL 13,814,153 12,599,985 12,307,233
440.4412 ELECT SALES-ELK RIVER NON-DEMAND 3,349,199 3,009,962 2,858,321
440.4413 ELECT SALES-ELK RIVER DEMAND 20,053,948 18,759,264 18,141,843
Total for Elk River: 37,217,301 34,369,210 33,307,399
Otsego
440.4416 ELECT SALES-OTSEGO RESIDENTIAL 1,397,314 1,274,499 1,221,434
440.4417 ELECT SALES-OTSEGO NON-DEMAND 439,854 395,302 370,490
440.4418 ELECT SALES-OTSEGO DEMAND 1,147,858 1,075,452 999,382
Total for Otsego: 2,985,026 2,745,253 2,591,308
Rural Big Lake
440.4421 ELECT SALES-BIG LAKE RESIDENTIAL 210,671 192,155 182,865
440.4422 ELECT SALES-BIG LAKE NON-DEMAND 4,366 3,924 3,862
Total for Rural Big Lake: 215,037 196,078 186,728
Dayton
440.4431 ELECT SALES-DAYTON RESIDENTIAL 218,094 198,925 183,877
440.4432 ELECT SALES-DAYTON NON-DEMAND 38,348 34,464 33,896
Total for Dayton: 256,442 233,389 217,774
Public St&Hwy Lighting
440.4414 ELECT SALES-SEC LTS 250,000 244,000 250,174
Total for Public St&Hwy Lighting: 250,000 244,000 250,175
Other Electric Sales
440.455 SUB-STATION CREDIT 4,800 4,800 4,800
Total for Other Electric Sales: 4,800 4,800 4,800
Total for Operating Revenue: 40,928,605 37,792,730 36,558,183
Other Operating Revenue
Interest/Dividend Income
460.4691 INTEREST&DIVIDEND INCOME 80,000 70,000 134,464
Total for Interest/Dividend Income: 80,000 70,000 134,465
Customer Penalties
470.4701 CUSTOMER DELINQUENT PENALTIES 235,000 - 42,555
Total for Customer Penalties: 235,000 - 42,556
LFG Project
470.4721 LFG PROJECT 836,000 1,186,307 1,141,482
Total for LFG Project: 836,000 1,186,307 1,141,482
Connection Fees
470.4702 DISCONNECT&RECONNECT CHARGE 220,000 145,000 160,186
Total for Connection Fees: 220,000 145,000 160,186
Misc Revenue
470.4703 MISC ELEC REVENUE-TEMP CHG 2,000 500 2,700
470.4704 STREET LIGHT 20,000 5,000 20,100
470.4715 TRANSMISSION INVESTMENTS 600,000 460,951 442,112
470.4722 MISC NON-UTILITY 90,000 60,000 87,365
470.4723 GAIN ON DISPOSITION OF PROPERTY - - 23,317
470.4739 PERA PENSION REVENUE - - 7,481
470.475 RENTAL PROPERTY INCOME - - 7,350
470.477 CONTRIBUTIONS FROM CUSTOMERS 175,000 100,000 174,556
470.478 CONTRIBUTIONS FROM GRANTS - -
Total for Misc Revenue: 887,000 626,451 764,984
Total Other Revenue
Total for Total Other Revenue: 2,258,000 2,027,758 2,243,673
Total Revenue 43,186,605 39,820,488 38,801,856 8.5%
Expenses
Purchased Power
540.5551 PURCHASED POWER 28,376,952 25,546,480 24,240,439 11.1%(2.5%Rate increase and EAC increase)
Total for Purchased Power: 28,376,952 25,546,480 24,240,440 11.1%
Operating&Mtce Expense
540.5461 OPERATING SUPERVISION 143,000 121,000 100,964
540.5471 DIESEL OIL FUEL 10,000 15,000 6,672
540.5472 NATURAL GAS 17,500 27,000 26,403
540.5483 ELECTRIC&WATER CONSUMPTION-PLANT 30,000 33,000 26,370
540.5484 PLANT SUPPLIES&OTHER EXPENSE 13,000 10,000 9,865
540.5491 MISC POWER GENERATION EXPENSE 8,000 7,000 5,747
540.5521 MAINTENANCE OF STRUCTURE-PLANT 15,000 19,000 12,406
540.5531 MTCE OF PLANT ENGINES/GENERATORS 25,000 20,000 16,224
540.5541 MTCE OF PLANT/LAND IMPROVEMENT 30,000 30,000 15,603
Total for Operating&Mtce Expense: 291,500 282,000 220,258
Landfill Gas
550.505 LANDFILL GAS PLANT PURCHASED GAS 151,794 182,000 177,007 Per contract
550.5051 LANDFILL GAS PLANT OPERATIONS&MTCE 415,187 518,725 526,092
550.5052 LANDFILL GAS PLANT ADMINISTATION 25,550 57,000 19,982 Cty bonus,utilities and atty fees
550.5053 LANDFILL GAS PLANT INSURANCE 19,950 20,000 18,797
550.5054 LANDFILL GAS PLANT MTCE 650 5,000 1,721
Total for Landfill Gas: 613,131 782,725 743,601
80
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER,MINNESOTA
2022 ELECTRIC BUDGET
2022 Annual 2021 Annual 2020 Annual
Electric Budget Budget Actual
Transmission Expense
560.562 TRANSMISSION MTCE AND EXPENSE 66,700 74,000 46,610
Total for Transmission Expense: 66,700 74,000 46,611
Distribution Expense
580.5801 REMOVE EXISTING SERVICE&METERS 2,500 2,000 2,143
580.5821 SCADA EXPENSE 44,000 42,800 42,057
580.5831 TRANSFORMER EXPENSE OH&URD 13,000 16,000 13,069
580.5851 MICE OF SIGNAL SYSTEMS 2,000 2,000 1,928
580.5861 METER EXPENSE-REMOVE&RESET 1,000 1,000 996
580.5871 TEMP SERVICE-INSTALL&REMOVE 2,000 2,000 3,049
580.5881 MISC DISTRIBUTION EXPENSE 280,000 275,000 217,068
580.589 INTERCONNECTION CARRYING CHARGE 2,416 2,416 2,416
Total for DistrIbution Expense: 346,916 343,216 282,730
Maintenance Expense
590.5911 MTCE OF STRUCTURES 30,000 27,500 25,672
590.5921 MTCE OF SUBSTATIONS 26,000 28,000 20,420
590.5922 MTCE OF SUBSTATION EQUIPMENT 69,000 57,000 17,044
590.5931 MTCE OF OH LINES/TREE TRIM 225,000 150,000 123,979 $140k contractors
590.5932 MTCE OF OH LINES/STANDBY 36,000 32,000 31,013
590.5933 MICE OF OH PRIMARY 170,000 160,000 169,229
590.5941 MTCE OF URD PRIMARY 165,000 155,000 136,565
590.5943 LOCATE ELECTRIC LINES 105,100 97,000 89,734
590.5944 LOCATE FIBER LINES 1,000 1,000 1,053
590.5951 MTCE OF LINE TRANSFORMERS 60,000 45,000 29,844
590.5961 MICE OF STREET LIGHTING 45,000 45,000 43,064
590.5962 MTCE OF SECURITY LIGHTING 10,000 10,000 10,951
590.5971 MTCE OF METERS 80,000 85,000 69,319
590.5972 VOLTAGE COMPLAINTS 10,000 10,000 7,385
590.5981 SALARIES TRANSMISSION&DISTRIBUTION 30,000 43,000 33,966
590.5985 ELECTRIC MAPPING 90,000 100,000 84,282
590.5991 MICE OF OH SECONDARY 25,000 20,000 19,657
590.5992 MICE OF URD SECONDARY 50,000 41,000 49,083
590.5995 TRANSPORTATION EXPENSE 240,000 225,000 184,805
Total for Maintenance Expense: 1,467,100 1,331,500 1,147,075
Depreciation&Amortization
595.8031 DEPRECIATION 2,436,698 2,437,374 2,228,703
595.8032 AMORTIZATION 668,135 668,135 668,135
Total for Depredation&Amortization: 3,104,833 3,105,509 2,896,839
Interest Expense
596.8071 INTEREST EXPENSE-BONDS 906,275 622,859 657,782 2021B Bonds
596.8075 INTEREST EXPENSE-DEFEASED BONDS - (3,317) (3,316)
597.8281 AMORTIZATION OF DEBT DISCOUNT (60,766) (48,152) (48,151)2021B Bonds
Total for Interest Expense: 845,509 571,390 606,314
Other Operating Expense
597.8165 EV CHARGING EXPENSE 4,240 4,650 4,310
597.8213 LOSS ON DISPOSITION OF PROP(CAPITAL) 12,500 12,500 55
597.8263 OTHER DONATIONS 3,000 3,000 1,261
597.8265 MUTUAL AID - -
597.8302 PENSION EXPENSE 45,000 82,000 (71,847)
597.8303 OPEB EXPENSE - 45,000 33,324
597.8341 INTEREST EXPENSE-METER DEPOSITS 2,000 13,000 12,852
597.84 RENTAL PROPERTY EXPENSE - - 5,705
Total for Other Operating Expense: 66,740 160,150 (14,339)
Customer Accounts Expense
900.9021 METER READING EXPENSE 42,100 34,000 38,938
900.903 DISCONNECT/RECONNECT EXPENSE 16,100 15,000 8,738
900.9051 MISC CUSTOMER ACCOUNTS EXPENSE UTILITY 272,000 275,000 276,766 added 4.8k for survey
900.9061 BAD DEBT EXPENSE&RECOVERY 20,000 20,000 21,645
Total for Customer Accounts Expense: 350,200 344,000 346,089
Administrative Expense
920.9201 SALARIES OFFICE&COMMISSION 860,000 762,000 729,964 GM
920.9202 SALARIES COVID-19 - - 160,583
920.9205 TEMPORARY STAFFING 4,000 4,000
920.9211 OFFICE SUPPLIES 107,000 165,000 102,156
920.9212 ELECTRIC&WATER CONSUMPTION-OFFICE 29,000 31,000 25,940
920.9213 BANK FEES 2,500 2,640 2,396
920.9221 LEGAL FEES 32,000 32,000 34,975
920.9231 AUDITING FEES 18,040 18,000 16,560
920.9241 INSURANCE 182,884 175,000 172,405
920.926 UTILITY SHARE-DEFERRED COMP 123,500 117,500 90,531 Inv Assist,GM
920.9261 UTILITY SHARE-MEDICAL/DENTAL/DISABIL 847,000 807,166 745,160 Inv Assist,GM
920.9262 UTILITY SHARE-PERA 280,000 269,940 251,913 Inv Assist,GM
920.9263 UTILITY SHARE-FICA 265,000 252,650 236,291 Inv Assist,GM
920.9264 EMPLOYEE SICK PAY 133,025 127,000 123,663
920.9265 EMPLOYEE HOLIDAY PAY 146,991 138,500 135,152
920.9266 EMPLOYEE VACATION&PTO PAY 231,961 230,000 226,668
920.9267 UPMIC DISTRIBUTION 60,000 62,000 48,212
920.9291 CONSULTING FEES 55,000 72,200 53,763 GM Search,AMI Consultant
920.9301 TELEPHONE 31,300 31,000 29,364
920.9302 ADVERTISING 13,000 15,000 10,932
920.9303 DUES&SUBSCRIPTIONS-FEES 130,365 220,093 112,401
81
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER,MINNESOTA
2022 ELECTRIC BUDGET
2022 Annual 2021 Annual 2020 Annual
Electric Budget Budget Actual
920.9305 SCHOOLS&MEETINGS 224,212 198,811 106,195
920.9321 MICE OF GENERAL PLANT&OFFICE HEATING 7,500 9,000 5,210
Total for Administrative Expense: 3,784,279 3,740,501 3,420,443
General Expense
920.9269 CIP REBATES-RESIDENTIAL 57,907 67,050 37,703
920.927 CIP REBATES-COMMERCIAL 232,200 222,200 146,859
920.9271 CIP-ADMINISTRATION 85,301 81,668 4,377
920.9272 CIP-MARKETING 47,000 46,000 17,326
920.9273 CIP-LABOR 100,512 100,083 142,996
920.9274 CIP REBATES-LOW INCOME 18,500 15,500 12,000
920.9275 CIP-LOW INCOME LABOR 9,750 15,500 8,874
920.9281 ENVIRONMENTAL COMPLIANCE 34,000 32,200 30,134
920.9306 MISC GENERAL EXPENSE 2,500 2,500 )47)
Total for General Expense: 587,670 582,701 400,225
Total Expenses(before Operating Transfers) 39,901,529 36,864,172 34,336,285
Operating Transfer
Operating Transfer/Other Funds
597.8262 TRANSFER TO CITY ELK RIVER REVENUE 1,488,692 1,374,768 1,340,218
Total for Operating Transfer/Other Funds: 1,488,692 1,374,768 134,218
Utilities&Labor Donated
597.8261 UTILITIES&LABOR DONATED TO CITY 230,000 230,000 229,085
Total for Utilities&Labor Donated: 230,000 230,000 229,086
Total Operating Transfer
Total for Total Operating Transfer: 1,718,692 1,604,768 1,569,304
Net Income Profit(Loss) 1,566,384 1,351,548 2,896,266
82
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER,MINNESOTA
2022 WATER BUDGET
2022 Annual 2021 Annual 2020 Annual
Water Budget Budget Actual
Revenue
Operating Revenue
Water Sales
610.6101 Water Sales Residential 1,359,866 1,256,746 1,506,673
610.6102 Water Sales Commercial 842,025 800,700 830,369
610.6103 Water Sales Irrigation 243,025 242,304 276,768
Total for Water Sales: 2,444,916 2,299,751 2,613,812
Total Operating Revenue
2,444,916 2,299,751 2,613,812
Total for Total Operating Revenue: 2,444,916 2,299,751 2,613,812
Other Operating Revenue
Interest/Dividend Income
460.4691 Interest&Dividend Income 35,000 38,000 33,456
460.4692 Other Interest/Misc Revenue 1,000 1,000 1,104
Total for Interest/Dividend Income: 36,000 39,000 34,561
Customer Penalties
620.6301 Customer Penalties 18,000 - 3,801
Total for Customer Penalties: 18,000 - 3,801
Connection Fees
620.6401 Water/Access/Connections Fees 430,000 110,000 595,482
620.6402 Customer Connection Fees 35,000 30,000 31,329
620.6407 Bulk Water Sales/Hydrant Rental 15,000 14,000 25,601
Total for Connection Fees: 480,000 154,000 652,414
Misc Revenue
470.4722 Misc Non-Utility - - 55
470.4739 Pera Pension Revenue - - 1,197
470.475 Rental Property Income - - 1,837
620.626 Transfer In From City - - -
620.6403 Miscellaneous Revenue - - 24
620.6323 Gain On Disposition Of Property - - 3,525
620.6404 Hydrant Maintenance Program 13,000 11,500 14,461
620.6405 Contributions from Developers 65,000 - 477,194
620.6406 Water Tower Lease 286,153 274,480 243,631
Total for Misc Revenue: 364,153 285,980 741,926
Total Other Revenue
898,153 478,980 1,432,701
Total for Total Other Revenue: 898,153 478,980 1,432,702
Total Revenue 3,343,069 2,778,731 4,046,513
Expenses
Production Expense
700.7021 MTCE OF STRUCTURES 75,000 61,200 52,040
Total for Production Expense: 75,000 61,200 52,041
Pumping Expense
710.7101 SUPERVISION 66,000 63,000 52,580 New GM
710.7181 ELECTRIC&GAS UTILITIES 270,000 240,000 250,804
710.7182 SAMPLING 15,000 15,000 10,959
710.7183 CHEMICAL FEED 36,000 28,000 22,817
710.722 MTCE OF WELLS 160,000 175,000 111,078
710.723 SCADA-PUMPING 16,000 10,000 2,464
Total for Pumping Expense: 563,000 531,000 450,706
Distribution Expense
730.7301 MTCE OF WATER MAINS 120,000 85,000 113,488
730.7309 LOCATE WATER LINES 17,000 16,000 11,136
730.7312 WATER METER SERVICE 55,000 45,000 34,367
730.7315 INSTALL&MTCE IRRIGATION METERS - 31
730.7316 BACKFLOW DEVICE INSPECTION 15,000 15,000 4,747 labor and software expense
730.7321 MTCE OF CUSTOMERS SERVICE 30,500 25,000 24,341
730.7325 WATER MAPPING 12,500 12,000 8,353
730.7331 MTCE OF WATER HYDRANTS-PUBLIC 18,000 20,000 9,398
730.7332 MTCE OF WATER HYDRANTS-PRIVATE 5,000 7,000 4,594
730.7341 WATER CLOTHING/PPE 7,000 10,000 9,845
730.7391 WAGES WATER 9,500 7,500 4,716
730.7395 TRANSPORTATION EXPENSE 15,000 15,000 11,768
730.7399 WATER PERMIT 18,600 15,000 12,396
Total for Distribution Expense: 323,100 272,500 249,186
83
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER,MINNESOTA
2022 WATER BUDGET
2022 Annual 2021 Annual 2020 Annual
Water Budget Budget Actual
Depreciation&Amortization
595.8031 DEPRECIATION 1,199,124 1,182,605 1,133,179
Total for Depreciation&Amortization: 1,199,124 1,182,605 1,133,179
Interest Expense
596.8071 INTEREST EXPENSE-BONDS 46,371 14,288 24,344
596.8075 INTEREST EXPENSE-DEFEASED BONDS - (829) (829)
597.8281 AMORTIZATION OF DEBT DISCOUNT/PREMIUM (6,651) - -
Total for Interest Expense: 39,720 13,459 23,515
Other Operating Expense
597.8213 LOSS ON DISPOSITION OF PROP(CAPITAL) - - 18
597.8264 DAM MAINTENANCE EXPENSE 1,750 1,000 1,663
597.8302 PENSION EXPENSE - 20,500 (39,408)
597.8303 OPEB EXPENSE - 20,000 1,704
597.8341 INTEREST EXPENSE-METER DEPOSITS 100 500 408
597.84 RENTAL PROPERTY EXPENSE - - 1,426
Total for Other Operatin Expense: 1,850 42,000 (34,187)
Customer Accounts Expense
900.9021 METER READING EXPENSE 2,500 2,500 2,321
900.9051 MISC CUSTOMER ACCOUNTS EXPENSE UTILITY 71,200 65,000 64,188 added 1.2k for survey
900.9061 BAD DEBT EXPENSE&RECOVERY 500 1,000 -
Total for Customer Accounts Expense: 74,200 68,500 66,509
Administrative Expense
920.9201 SALARIES OFFICE&COMMISSION 235,000 211,000 204,641 GM
920.9202 SALARIES COVID-19 - - 30,762
920.9205 TEMPORARY STAFFING 1,000 1,000 -
920.9211 OFFICE SUPPLIES 23,700 41,250 24,766
920.9212 ELECTRIC&WATER CONSUMPTION-OFFICE 8,000 8,000 6,485
920.9213 BANK FEES 700 700 615
920.9221 LEGAL FEES 8,000 8,000 7,841
920.9231 AUDITING FEES 4,510 4,500 4,140
920.9241 INSURANCE 27,000 26,000 24,458
920.926 UTILITY SHARE-DEFERRED COMP 28,000 20,000 12,487 GM
920.9261 UTILITY SHARE-MEDICAL/DENTAL/DISABIL 217,000 208,500 159,305 GM
920.9262 UTILITY SHARE-PERA 51,000 46,000 40,304 GM
920.9263 UTILITY SHARE-FICA 49,000 45,000 38,423 GM
920.9264 EMPLOYEE SICK PAY 30,000 30,000 19,527
920.9265 EMPLOYEE HOLIDAY PAY 28,000 28,000 21,872
920.9266 EMPLOYEE VACATION&PTO PAY 41,000 40,000 36,154
920.9267 UPMIC DISTRIBUTION 11,000 10,500 7,886
920.9268 WELLHEAD PROTECTION 20,000 20,000 - Wellhead protection plan amendment
920.9291 CONSULTING FEES 20,000 13,500 13,254 GM Search,AMI Consultant
920.9301 TELEPHONE 6,800 6,000 5,653
920.9302 ADVERTISING 5,000 7,000 5,481
920.9303 DUES&SUBSCRIPTIONS-FEES 73,616 80,328 67,117
920.9305 SCHOOLS&MEETINGS 55,026 49,312 12,151
920.9321 MTCE OF GENERAL PLANT&OFFICE HEATING 1,900 2,700 1,299
Total for Administrative Expense: 945,252 907,290 744,631
General Expense
920.9269 CIP REBATES-RESIDENTIAL 4,500 4,500 3,830
920.927 CIP REBATES-COMMERCIAL 500 500 1,000
920.9272 CIP-MARKETING 500 500 40
920.9273 CIP-LABOR 4,700 4,700 4,345
920.9281 ENVIRONMENTAL COMPLIANCE 2,200 2,200 1,936
920.9306 MISC GENERAL EXPENSE 250 1,250 21
Total for General Expense: 12,650 13,650 11,174
Total Expenses(before Operating Transfers)
3,233,895 3,092,204 2,696,755
Operating Transfer
Utilities&Labor Donated
597.8261 WATER&LABOR DONATED TO CITY 1,500 1,500 463
Total Operating Transfer
Total for Total Operating Transfer: 1,500 1,500 463
Net Income Profit(Loss) 107,674 (314,972) 1,349,294
84
Elk River Municipal Utilities Business Plan/Budget
2022 Electric Department Capital Budget
Capital Construction Projects
Cost Description
$ 500,000 Highway 169 redefine Reserve
$ 100,000 Rebuild:Ogden,196th,Lander
$ 100,000 199th rebuild
$ 100,000 Waco Business Center Dr Recon
$ 150,000 Cty Rd 33
$ 100,000 Rebuild Sandpiper Estates
$ 75,000 Otsego Street Lights
Subtotal $ 1,125,000 *Projects listed in order of priority
Capital Construction Substations
Cost Description
$ 1,000,000 Highway 10 Design&Construction Reserve
$ 15,000 Station 14-3 Recloser Tank Replacement
$ 30,000 West Bank#1 Relay Panel Replacement
$ 30,000 West Bank#2 Relay Panel Replacement
Subtotal $ 1,075,000
Capital Construction Feeders
Cost Description
$ 100,000 County Rd 35 Feeder to Waco
$ 250,000 Rebuild Feeder 46 Substation to Hwy 10
$ 250,000 New Feeder to tie Sub14-4 to Otsego Sub
Subtotal $ 600,000
Capital Construction System
Cost Description
$ 543,000 Transformers and Meters ***Increased due to pricing
$ 500,000 AMI Reserve
$ 350,000 New Development Distribution Installation
$ 50,000 Street Lighting
$ 50,000 Ongoing OH Equip Replacement(Poles,Switches,Cut-Outs)
$ 100,000 Ongoing URD Equip Replacement(Switches,1-Boxes,Fuse Pads)
$ 42,600 Fault Indicators Replacements
Subtotal $ 1,635,600
Capital Equipment Needs
Cost Description
$ 250,000 Replace Bucket Truck Vehicle#4
$ 75,000 Replace Dump Truck Vehicle#7
$ 30,000 Forklift
$ 25,000 Sweeper
$ 80,000 Bobcat ***Added$15k due to increased quote
$ 10,000 Snowblower ***New
$ 97,600 Electric share of Administration
$ 185,920 Electric Share of Technical Services
Subtotal $ 753,520
Capital Facilities&Misc Needs
Cost Description
$ 50,000 Covered Material Bins West Sub
$ 30,000 Vactron clean out west sub
$ 884,185 Territory Acquisition-Loss of Revenue Pmt(2015 Contract-Area 1&2,3&4,5&6,7&8) Reserve
Subtotal $ 964,185
Total Capital $ 6,153,305
Electric Noteworthy Non-Recurring Expenses
Cost Description
$ 6,000 Computers,iPads,Software,Accessories
$ 10,000 Tools
$ 2,500 Station 14-3 Transformer Arrestor Replacement
$ 15,000 Station 14-4 Contractor Testing and Inspections
$ 10,000 West Bank#2 Transformer Arrestor Replacement and Current Transformers
$ 11,600 Electric share of Administration
$ 18,075 Electric share of Technical Services
Total $ 73,175
85
Elk River Municipal Utilities Business Plan/Budget
2022 Administration and Technical Services Departments Capital Budgets
Administration Capital Equipment Needs
Cost Description
$ 10,000 Office Furniture
$ 7,500 Hallway Display and Branding
$ 5,000 Network Switches/Misc(ERMU)
$ 7,500 Security Camera System Replacement
$ 5,000 Voice Server Replacement
$ 45,000 Vehicles #1
$ 42,000 Carpet
Subtotal $ 122,000
Administration Noteworthy Non-Recurring Expenses
Cost Description
$ 14,500 Computers,iPads,Software,Accessories,Scanners,Printers-Upgrades
Subtotal $ 14,500
Total Administration $ 136,500
Technical Services Capital Equipment Needs
Cost Description
Currently designated as emergency
$ - Diesel Engines Emission Retrofit $ 350,000 standby,retrofit on hold until further notice
$ - Diesel Plant to run on Natural gas. $ 20,000 Deferred until future date
$ 25,000 Upgrade tanks per inspection issues
$ 18,000 Repair Exhaust-Engine#3
$ 35,000 Fiber Extension-169 to Sub
$ 25,000 Field Meter Testing Equipment
$ 20,000 Shop Meter Tester
$ 12,000 Thermal Imager Camera
$ 8,600 Locator
$ 45,000 Trucks #2(95/5)
Subtotal $ 188,600
Technical Services Noteworthy Non-Recurring Expenses
Cost Description
$ 8,500 Computers,iPads,Software,Accessories-Upgrades
$ 10,000 General Engine Inspections/Maint.
Subtotal $ 18,500
Total Technical Services $ 207,100
Total Capital Items $ 310,600
Total Non-Recuring Expenses $ 33,000
86
Elk River Municipal Utilities Business Plan/Budget
2022 Water Department Capital Budget
Water Capital Construction Needs
Cost Description
$ 25,000 Well#2 Rehab
$ 35,000 Well#3 Roof Replacement
$ 85,000 Well#4 Media
$ 12,000 Chlorine Analyzers
$ 100,000 Facility Repair
$ 20,000 Freeport Booster Station
$ 15,000 Placeholder for undetermined projects
$ 60,000 SCADA upgrades *increased$20k for fiber for well 3 scada
$ 100,000 AMI
$ 1,201,575 Highway 169 Redefine *increased from$1M Reserves
Subtotal $ 1,653,575
Capital Equipment Needs
Cost Description
$ 45,000 Trucks #32
$ 24,400 Water share of Administration
$ 2,680 Water Share of Technical Services
Subtotal $ 72,080
Total Capital $ 1,725,655
Water Noteworthy Non-Recurring Expenses
Cost Description
$ 1,100 Computers, iPads
$ 10,000 Meters/ERT
$ 2,900 Water share of Administration
$ 425 Water share of Technical Services
Total $ 14,425
87
Ell(RIVER MUNCIPAL UTIL0IES
TRAVEL 6 TRAINING BUDGET FOR 2022
BWget Budget Budget
Attending 2022 2021 MO Comments
26.6
MMUA Overhead hot Une School staff 2,140 2,110 2,110
MMUA Underground School staff 2,140 2,110 2,110
MMUA Transformer School staff 2,370 2,110 2,110
MMUA Substation Workshop staff 2,140 2,110 2,110
10 Line Supenv.n staff - 1,AO 1,700
MMUA Stepping Into leadership staff 2,200 -18 month program
Advanced Staking Wokshop staff 1,900 1,900 lyW
Apprenticeship staff 3,125 IAA 1,100
MMUA Meter School staff 1,960 1,940 1,940
MMUA Laata Workshop staff 720 720 T20
Regional Workshop stiff 920 920 1,130
Competent Person training staff 950 950 930
APPA linemen Rodeo team staff 4,500 5,000 3,4011 team-Austin,TX
Cross Training School/Diesel Workshop staff 1,96O 1,910 1,910
PCB Training staff 1,213 1,233 1,428
Member Information Conh(N0C) staff 2,363 2,135 2,133 linen pry Fore0ersan attending
MMUAT6OConfenence staff 460 230 850 Inventory rompers.and Assistant attending partial
Tree Trimming/Chains.Wokshop staff 2,060 2,060 4,120
Everyday Leadership Training 6staff 6,957 7,273 2,000 Identified reed in Survey
Additional Training 2,000 2,000 2,000
45, 42,098 40,376 35,7.
Water Certification Continuing Eduralon 4 staff 2,668 2,003 2,000
Wastewater w Certification Continuing Edtion 4staff 2,000 1,300 1,300
Unlicensed Electrician Continuing Education 1 staff 60 -
BacYgowTesterCertiRcationOass 2 staff 2,400 3,600 per recent years S.,/ son
Professional Operator and Development staff 750 750 J50
lst line Supervision ]staff - 1,A0 -
MMUA Stepping Into Leadership I staff 2,200 - -18 month program
Everyday Leadership Training 4staff 1,739 1,364 500 Identified need in Survey
Additional Training 2,500 2,500 2,503
656 14,317 13,504 7,250
14gtanl Services
MMUA Locator Workshop
AdvancedStakinBWokshop ]stall - 1,903
MM W Diesel Wokshop 1 staff 850 830 750
MMUA Generation School
Engineering seminar 1smff - 2,000
Engineer.MPS,CON - - 873
UMMA Meter Workshop ]staff 700 70) 903
CAD Workshopa/OPS - • -
BPILIsmConference - .
Substation School stiff 890 890 890
Power quality training stiff 1,003 1,000 1,000
Infrared Camera training staff 2000 1,000 1,003
MAMA wintermtg staff 435 400 800
UMMA summer mg staff 475 400 400
1st Line Supervision staff - 1,790 -
EkclriwlUcaning staff - - 365 Remove•moved to dues
Cross Training School stall - 890
Apprentice Meter Program Ill - -
409,50
EverydayLeadershipTraining staff 2,374 1,818 6000 Identified need In Suvq
Additional Training 1,500 1,003 1,000
2% 10,024 9,848 13,773
AdrriNN4dpn
staff 1,700 1,700 1,700 Water Certification Continuing Educal5on
MRWA staff 500 50D 500 Water Certification Continuing Fducation
Wasdwater Certifrauan Continuing Eduotion staff SW 500 500
MV-RS Mend/Software training stall .
WWA National COn6nence staff 2}00 2,100 2,103
Water Ugity Management Institute stall
EngineeringMPSYCON staff 3,300 1,750 875
UMMA Meter Workshop staff 435 Apr
UMMA wintering staff 475 400 •
MMUA Annual Summer Meeting staff/Scomm 7,406 7,406 7,406
MMUA Legislative Round staff/1 canon I,. 1,305 1,305
dv APPAIeeislae Pound-up
staff/1 comm 6,473 6,475 6,475
MMUA T60 Conference staff 3,325 2,400 2,400
Advanced Training staff 1803 1,900 1,903
.gineering seminar staff 2,000 2,000 Clad,Conference staff 800 800 8.
MMUA Leadership Academy staff 4,310 6,310 3,110
APPA E&OCanbence staff 6,185 6,185 6,185
APPA Wdwal Conference staff/0 canon 3,030 3,050 3,050
1st Line Supevsion staff - 3,530 3,400
Memrvr Information Conf dn.) staff 4,726 4,270 6,405
APPA Training(Mgmt,CS.Fin,Fog ClP,etc) staff 2,500 2,500 1,529
Training lMBmt CS,fin,Fmg ClP,etc) staff - - 1,116
APPA Board Member and RP3 Travel staff
Ap1ACybeisesarity Summit staff -
HumanResourcesTraining/Conkrence staff - 2,000 -Mevedta Office
Emergency Prepar.ness 6 Restoration staff - - 1,085
CPA CPI staff 1,500 1,500 Management Training 20,000 - -Includes Strategic Planning
Everyday leadership Training Ostaff 4,348 5,003 -
AdditiorelTraining 3,000 1,003 1,000
3016 82,040 63,331 55,340
Member Inbrmation Cnnh,690/ 2staf 4,726 4,270 4,270
Customer Service 3,IX3 3,000 5,250 Identified need in Survey
Adobe Publishing&Design 5offware training ]staff 1,000 600 1,000 Cnmmunkatiom position attending
MN Munitipal Oeks Institute Sstaff 1,000 Bop -Cnmmunia0wls position attending
Clerk's Confenence Istaff 800 - -Communications position attending
Chamber Leadership Program 1 staff 473 403 400
Financial/Accounting(AWL,MSC M64) 1,650 1,650 3,123 API Continuing Ed,Misc PR,Excel,Accounting Misc
Everyday leadership Training 11 staff 4,733 4,545 16O3 Identified need in Survey
Additional Training 1,000 1,000 1,003
PA Emgoyment law Update 1 staff 250 -
SHRMConference 1staff 3,000 - -MR Training
APPA Summit 1 stall 1,550 500 1, -New II-Training
ITSCCP Online Edvation 1 stall .0
NR4Misc 0-Training ]start 1,000 1,000 -New IT Training
2856 24,684 19,265 16845
60ety Trai5K
Sale Driver Training ]staff 2,1C0 2,f00 2,100
AEditiouai Training 1,000 1800 1,000
acing Test 700 700 7C0
MMUA Monthly Satiety Meetings - - 30000 Moved.Dues&Subrniptima-fees
Labor ,275 93,030
4% 103,075 98,800 33B03
Edu atbn
3,003 3,000 3,000
3,003 3,000 3,000
T.I 279,218 248,124 163,432
Total Change 13% 50%
88
ELK RIVER MUNCIPAL UTILITIES
DUES&SUBSCRIPTIONS-FEES BUDGET FOR 2022
Budget Budget Actual
Description 2022 2021 2020
MMUA Membership Dues 33,839 32,500 32,413 iodated from$32,500
MMTG Dues 6,550 6,600 6,549
APPA Dues 17,630 17,630 16,899
APPA DEED Program Dues 3,600 3,400 3,380
APPA Customer Survey Benchmarking - - 1,500
MMUA Monthly Safety Meetings 30,500 30,150 30,038 ipdated from$30,150
Rotary 300 300 -
Drug and Alcohol Random Testing 1,500 800 50
Bond Administrative&Management Fees 5,400 4,000 4,000 US Bank,City(Bond Disclosure Fees),Moody's
Quarterly MN Dept of Health Water Connection Fee 54,500 52,000 51,970 Updated from$54k
MRWA Annual Fee 300 300 300
AWWA Annual Fee Dues 2,120 2,904 2,855 Removed Updates$850 Updated from$2910
MPCA Permit Fee-WTP 350 345 -
MPCA Permit Fee-Engines 360 240 235
Homeland Security(Hazardous Chemical Fee) 700 700 700
SUSA Membership 125 125 -
Elk River Chamber Membership 620 600 560 Updated from$770
Economic Development Association 350 350 - mn deed,eda of mn
GASB Subscription 287 260 -
ESRI Small Govt Enterprise agreement 27,000 27,000 20,980
mPower Maintenance 6,000 - -
AutoCAD Maintenance Support - 2,400 1,538
Adobe Creative Cloud software 800 900 849
Adobe Pro software 800 900 585
SIEM Solution 2,380 New 2022-Billed from city
Resource Training&Solutions membership - 210 -
Munici-pals Membership 25 25 -
Survey Monkey 390 390 384
AWWA Partnership Safe Water Treatment/Distribution 100 100 100
accessiBe 490 subscription added for new website
HR professional membership(s) 1,400 500 94 SHRM and MRA
Miscellaneous 5,565 4,792 3,541 Detail below
Bond Underwriter's Discount - 85,000 - 2021 Bonding Expense
Bond Service Professional Fee - 25,000 - 2021 Bonding for Field Services Building
Total 203,981 300,421 179,519
Budget Change -32% 67%
Budget Change without Bonding Expenses 7% 6%
Miscellaneous 5,565 4,792 3,541 Total
APA-Northstar Chapter Membership Fee 50 50 50
Supervisors Legal Update Renewal 530 530 525
Class A Electrical License 130 130 128
Journey worker A Electrician License Fee 43 - 43
Unlicensed Electrican Fee 19 - -
CPA License Renewal 102 102 102
MN Society of CPA Membership 630 630 630 2 memberships
Zoom 170 170 162
MCFOA Membership 90 90 45 2 memberships
AWWA Membership Renewal 316 316 158 4 memberships
MPCA Wastewater Certification Renewal 92 92 23 4 renewals
Engineer License Renewal 125 - 123 Even year renewal
IEEE Membership Renewal 241 241 -
SHRM Membership Renewal - 219 219 PR Specialist
Notary Renewal Fee - - - renews 12/2025
APA Membership Renewal 260 260 258
Misc Bonds/Permits 1,000 1,750 569
Water Operator License 92 92 32 4 renewals
ISC2 Certification(IT) 125 120 125
RP3 Application Fee 1,200 - - Every 3 years
BPMS Software - - -
Sprinkler Inspection 350 - 350
CPP Certification Renew - - - Every 5 years(renewed in 2021)
Backflow Tester Certification Recert - - - 1st in 2024
89
2022 CIP Operating Budget
Required Spending and Savings Goals
Total Spending Requirement 1.5% of GOR $ 548,026
Low Income .2%of Residential GOR $ 27,126
Minimum Conservation Spending Requirement $ 274,013
Maximum Load Management Spending Requirement $ 274,013
Energy Savings Goal (kWh) Line Loss 5.9%Subtracted 4,618,309
Possible Distributed Renewable Generation Funds $ 27,401
Possible Research and Development Funds $ 54,803
Total CIP Budget 2022
Direct Labor $ 78,637
General &Administration $ 31,625
Advertising $ 48,500
Equipment $ 11,600
Contract(Includes $32,000 MN PUC Assessment) $ 75,701
Total $ 246,063
ERMU Rebates $ 305,107
Total all Expenses and Rebates $ 551,170
Total Estimated kWh Savings 4,849,134
Total Operating CIP Budget No Rebates Only Direct Costs
Direct Labor $ 78,637
Advertising $ 48,500
Equipment $ 11,600
Contract(Includes $31,000 MN PUC Assessment) $ 75,701
Total ERMU Operating Expenses $ 214,438
Total Rebate Budget
ERMU Self Funded $ 305,107
Total Requested Budget
Direct Labor $ 78,637
Advertising $ 48,500
Equipment $ 11,600
Contract (Includes$31,000 MN PUC Assessment) $ 75,701
ERMU Self Funded Rebates $ 305,107
Total Requested 2022 Budget* $ 519,545
*No General and Administrative Included
90
1..,
Elk River -- -
Municipal Utilities
2022 Schedule of Rates & Fees
91
Elk River ---
Municipal Utilities
RESIDENTIAL ALL ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To single-family residences and individually metered apartments for all domestic purposes
with electric energy as a sole source of heating, and when all service is supplied through a single meter,
provided ratings of individual single-phase motors do not exceed five (5) horsepower.
Character of Service:AC, 60 cycles, 120/240 volt,three wire, single-phase.
Special Conditions: Residential service to a multiple dwelling or apartment house through a single meter
is allowed for existing services only. Service under this rate schedule shall not be sub-metered and
resold to the individual tenants on the basis of usage and the cost of electric service to the tenant must
be furnished without specific charge or price which varies with the quantity of energy used.
Any apartment or dwelling unit which has separate permanent kitchen facilities shall be considered as
one single family private residence.
Meter equipment must-to be accessible to our service department at any time.
Residential All Electric Service Rate:
Basic Monthly Electric Charge:$14.2513.50 per month
Summer Winter
I $0.1334 0/kWh/month $0.12184448/kWh/ month
Summer Rate: Applicable during the five monthly billing periods of June—October.
Winter Rate:Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: The Basic Monthly Electric Charge.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Page 1 of 2
92
Residential All Electric Service Rate
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission,distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20223
Page 2 of 2
93
Elk River
Municipal Utilities
RESIDENTIAL ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To single-family residences and individually metered apartments for all domestic purposes
when all service is supplied through a single meter, provided ratings of individual single-phase motors
do not exceed five (5) horsepower.
Character of Service:AC, 60 cycles, 120/240 volt,three wire, single-phase.
Special Conditions: Residential service to a multiple dwelling or apartment house through a single meter
is allowed for existing services only. Service under this rate schedule shall not be sub-metered and
resold to the individual tenants on the basis of usage and the cost of electric service to the tenant must
be furnished without specific charge or price which varies with the quantity of energy used.
Any apartment or dwelling unit which has separate permanent kitchen facilities shall be considered as
one single family private residence.
Meter equipment mustte be accessible to our service department at any time.
Residential Electric Service Rate:
I Basic Monthly Electric Charge:$14.251-3.50 per month
Summer Winter
I $0.133442-70/kWh/month $0.121811g0/kWh/month
Summer Rate:Applicable during the five monthly billing periods of June—October.
Winter Rate:Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: Basic Monthly Electric Charge.
Billing and Terms of Payment:See ERMU Service Policies Policy(Billing Due Dates,and Penalties and
Delinquent Notices.)
Page 1 of 2
94
Residential Electric Service Rate
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
95
Elk River ----
Municipal Utilities
RESIDENTIAL CLEAN ENERGY CHOICE PROGRAM RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To ERMU customers receiving service under another residential electric rate.
This Program is available to residential customers choosing to purchase renewable energy. Customers'
will have the option to purchase 50, 75 or 100 percent of the monthly energy consumption from
renewable energy sources.
ERMU customers receiving service under the electric vehicle charging rate will be automatically enrolled
in the Residential Clean Energy Choice Program Rate at the 100 percent participation level at no
additional monthly charge.
The customer shall agree to:
1. Complete an application -through the online registration process, or by returning a printed copy
to ERMU.
2. Clearly indicate the participation level and the additional monthly charge applicable to the 50,
75 or 100 percent subscription level desired.
3. Provide notice to ERMU to cancel participation.
ERMU shall provide:
1. Monthly billing statement with the Clean Energy Choice participation level clearly identified.
2. The applicable incremental cost per participation level will be identified and added to the billing
statement.
Participation Level % Monthly Charge
50 $1
75 $2
100 $3
Federal, state and local taxes may apply.
Adopted December 148, 20210
Effective January 1, 20221
Page 1 of 1
96
Elk River
Municipal Utilities
NON-DEMAND ALL ELECTRIC SERVICE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:Available for non-residential customer accounts. Existing or new Customer accounts with
electric energy as a sole source of heating, and with actual or projected demands of less than 50 kW for
the previous 12 consecutive months if applicable. When the Customer achieves an actual maximum
demand of 50 kW or greater,the Customer will be placed on the Demand Electric Service rate in the
next billing cycle. The Customer accounts shall be in compliance with all policies, procedures, and safety
requirements, and shall be taken through one meter. Rating of individual single-phase motors and other
single-phase power and heating units served under this schedule shall not exceed ten (10) horsepower
(or 7.355 kW) except by special permission. (Not applicable to resale, standby or auxiliary service.)
Character Of Service:AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts,three-phase. Four wire, 240 volts three phase will only be applicable to existing customers now
being served by this voltage. A Customer requiring voltages other than that already established by
ERMU shall be required to provide suitable space and location for ERMU's'transformers, metering and
associated equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business,they shall be interconnected by the customer to obtain one meter. If
additional meters and services are requested by the customer, each shall be treated as a separate
customer and billed individually.
Meter equipment must be accessible to our service department at any time.
Installation of Demand Meter:At the option of ERMU, a demand meter may be installed on any
customer whose monthly usage exceeds 15,000 kWh.
Non-Demand All Electric Service Rate:
Basic Monthly Electric Charge:$35.00 A0 per month
Summer Winter
$0.12911230/ kWh/ month $0.108114-O/kWh/month
Summer Rate: Applicable during the five monthly billing periods of June—October.
Winter Rate:Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment (PCA).
Page 1 of 2
97
Non-Demand All Electric Service Rate
Federal,state, and local taxes may apply.
Minimum Bill:The Basic Monthly Electric Charge plus $1.00 per kW per month of excess transformer
capacity requested by customer.
In case of equipment having abnormally low annual utilization factors or unusual operating
characteristics, special minimum charges may be prescribed by ERMU.
Power Factor Adjustment: The rates set forth in this schedule are based on the maintenance by the
Customer of a power factor of not less than 9895%at all times. If the power factor, as measured by the
electric department, is lower than 9895%,the monthly demand charge may be multiplied by the ratio
9895%divided by the measured power factor, or at ERMU's option, the power factor may be corrected
at the Customer's expense.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of
isolating the load from the balance of ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will
be allowed to be across-the-line started without notification and written authorization from ERMU. In
addition, Customers who fail to provide adequate corrective equipment shall be required to own and
maintain their own transformers.
Billing and Terms of Payment: See ERMU Service Policies Policy(Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate
or changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rate set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221.
Page 2 of 2
98
Elk River .—
Municipal Utilities
NON-DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demands of less than 50 kW for the previous 12 consecutive months if applicable.
When the Customer achieves an actual maximum demand of 50 kW or greater,the Customer will be
placed on the Demand Electric Service rate in the next billing cycle. The Customer accounts shall be in
compliance with all policies, procedures, and safety requirements, and shall be taken through one
meter. Rating of individual single-phase motors and other single-phase power and heating units served
under this schedule shall not exceed ten (10) horsepower(or 7.355 kW) except by special permission.
(Not applicable to resale, standby or auxiliary service.)
Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts,three-phase. Four wire, 240 volts three phase will only be applicable to existing customers now
being served by this voltage. A Customer requiring voltages other than that already established by
ERMU shall be required to provide suitable space and location for ERMU's transformers, metering and
associated equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter. If
additional meters and services are requested by the customer, each shall be treated as a separate
customer and billed individually.
Meter equipment must be accessible to our service department at any time.
Installation of Demand Meter: At the option of ERMU, a demand meter may be installed on any
customer whose monthly usage exceeds 15,000 kWh.
Non-Demand Service Rate:
Basic Monthly Electric Charge:$35.0030.op per month
Summer Winter
I $0.12911230/kWh/ month $0.10811030/kWh/month
Summer Rate:Applicable during the five monthly billing periods of June—October.
Winter Rate:Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment (PCA).
Page 1 of 2
99
Non-Demand Electric Service Rate
Federal, state, and local taxes may apply.
Minimum Bill:The Basic Monthly Electric Charge plus $1.00 per kW per month of excess transformer
capacity requested by customer.
In the case of equipment having abnormally low annual utilization factors or unusual operating
characteristics,special minimum charges may be prescribed by ERMU.
Power Factor Adjustment:The rates set forth in this schedule are based on the maintenance by the
Customer of a power factor of not less than 9895%at all times. If the power factor, as measured by the
electric department, is lower than 9895%,the monthly demand charge may be multiplied by the ratio
9895% divided by the measured power factor, or at ERMU's option, the power factor may be corrected
at the Customer's expense.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of
isolating the load from the balance of ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will
be allowed to be across-the-line started without notification and written authorization from ERMU. In
addition, Customers who fail to provide adequate corrective equipment shall be required to own and
maintain their own transformers.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rate set forth herein may be modified by the amount of any governmental changes imposed
and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
100
Elk River ---
Municipal Utilities
DEMAND ALL ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:Available for non-residential customer accounts. Existing or new Customer accounts with
electric energy as a sole source of heating, and with actual or projected demand greater than or equal to
50 kW. A Customer account with a billing demand of less than 50 kW for 12 consecutive months will be
given the option of switching to the Non-Demand rate. The Customer accounts shall be in compliance
with all policies, procedures, and safety requirements, and shall be taken through one meter. (Not
applicable to resale,standby or auxiliary service.)A Customer on this rate may qualify for integrity
testing.
Character Of Service:AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts,three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now
being served by this voltage. A customer requiring voltages other than that already established shall be
required to provide suitable space and location for ERMU's transformers, metering and associated
equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business,they shall be interconnected by the customer to obtain one meter,
unless an exception is approved by management. If additional meters and services are requested by the
customer, each shall be treated as a separate customer and billed individually.
Meter equipment mustto be accessible to our service department at any time.
Demand Service Rate:
Basic Monthly Electric Charge:$85.0075.00 per month.
Summer Winter
Demand Charge: $16.004-5.50 $12.0011.50 in kW/month
Energy Charge: $0.068406 4 $0.06840654 in kWh/month
Summer Rate: Applicable during the five monthly billing periods of June—October.
Winter Rate: Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment(PCA).
Federal, state and local taxes may apply.
Page 1 of 2
101
Demand All Electric Service Rate
Minimum Bill: Maximum billing demand during previous twelve months times 3.0%of the demand
charge, or the actual demand multiplied by the demand charge,whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Determination of Billing Demand:The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
But in no month shall the billing demand be greater than the value in kW determined by dividing the
kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the
customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m.
Fluctuating Loads:Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of
isolating the load from the balance of ERMU's system so that the load will not unduly interfere with
service on ERMU's lines. In addition, Customers who fail to provide adequate corrective equipment shall
be required to own and maintain their own transformers. No motor larger than ten (10) HP (or 7.355
kW) will be allowed to be across-the-line started without notification and written authorization from
ERMU.
Power Factor Adjustment: For loads of 50 kW or more, or at the option of ERMU for loads of less than
50 kW, power factor adjustments may be made in the billing demand,when the power factor, as
determined by test, at the time of the Customer's maximum use is less than 9895%. If the power factor,
as measured by ERMU's electric department, is lower than 9895%, the monthly demand charge may be
multiplied by the ratio 9895% divided by the measured power factor, or at ERMU's option,the power
factor may be corrected at the Customer's expense.
Billing and Terms of Payment:See ERMU Service Policies Policy(Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
102
Elk River
Municipal Utilities
DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demand greater than or equal to 50 kW. A Customer account with a billing demand
of less than 50 kW for 12 consecutive months will be given the option of switching to the Non-Demand
rate. The Customer accounts shall be in compliance with all policies, procedures, and safety
requirements, and shall be taken through one meter. (Not applicable to resale, standby or auxiliary
service.)A Customer on this rate may qualify for integrity testing.
Character Of Service:AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts, three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now
being served by this voltage. A customer requiring voltages other than that already established shall be
required to provide suitable space and location for ERMU's transformers, metering and associated
equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter,
unless an exception is approved by management. If additional meters and services are requested by the
customer, each shall be treated as a separate customer and billed individually.
Meter equipment mustte be accessible to our service department at any time.
Demand Service Rate:
Basic Monthly Electric Charge:$85.0075.00 per month.
Summer Winter
Demand Charge: $16.0015.50 $12.0011.50 in kW/ month
Energy Charge: $0.06840651 $0.06840651 in kWh/ month
Summer Rate: Applicable during the five monthly billing periods of June—October.
Winter Rate: Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state and local taxes may apply.
Page 1 of 2
103
Demand Electric Service Rate
Minimum Bill: Maximum billing demand during previous twelve months times 3.0%of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Determination of Billing Demand:The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
But in no month shall the billing demand be greater than the value in kW determined by dividing the
kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the
customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of
isolating the load from the balance of Elk River Municipal Utilities'system so that the load will not
unduly interfere with service on Elk River Municipal Utilities' lines. In addition, Customers who fail to
provide adequate corrective equipment shall be required to own and maintain their own transformers.
No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across-the-line started without
notification and written authorization from ERMU.
Power Factor Adjustment: For loads of 50 kW or more, or at the option of ERMU for loads of less than
50 kW, power factor adjustments may be made in the billing demand, when the power factor, as
determined by test, at the time of the Customer's maximum use is less than 9895%. If the power factor,
as measured by ERMU's electric department, is lower than 9895%,the monthly demand charge may be
multiplied by the ratio 9895%divided by the measured power factor, or at ERMU's option, the power
factor may be corrected at the Customer's expense.
Billing and Terms of Payment:See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
104
Elk River
Municipal Utilities
LARGE INDUSTRIAL DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demand greater than or equal to 1 MW. A Customer account with a billing demand
of less than 1 MW for 12 consecutive months may be switched to the Demand Electric Service Rate. The
Customer accounts shall be in compliance with all policies, procedures, safety requirements, and shall
be taken through one or more meters. Not applicable to resale, standby or auxiliary service.
Character Of Service: 3-Phase Primary, 7,200/12,470 volt,AC, 60 cycles.
Special Conditions: Customer must provide a location suitable for the installation of a utility metering
cabinet(s). Customer will be responsible for providing suitable wire and connection in the utility owned
metering cabinet(s). The primary meter(s) and cabinet(s) shall be installed to service one class of
business. If additional buildings are required for a given business,they shall be interconnected by the
customer to the existing meter(s), unless an exception is approved by management. If additional
meters and services are requested by the customer, each shall be treated as a separate customer and
billed individually. A customer on the rate may qualify for integrity testing.
ERMU equipment and metering must be accessible to ERMU 24 hours per day.
Demand Service Rate:
Basic Monthly Electric Charge: $120.00100,00 per month.
Summer Winter
Demand Charge: $15.50 58 $11.504-1:o8 in kW/month
Energy Charge: $0.06770644 $0.06778644 in kWh/ month
Summer Rate:Applicable during the five monthly billing periods of June—October.
Winter Rate: Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: Maximum billing demand during previous twelve months times 3.0%of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Page 1 of 2
105
Large Industrial Demand Electric Service Rate
Determination of Billing Demand:The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of
isolating the load from the balance of ERMU's system so that the load will not unduly interfere with
service on ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across-
the-line started without notification and written authorization from ERMU.
Power Factor Adjustment: Power factor adjustments may be made in the billing demand, when the
power factor, as determined by test, at the time of the Customer's maximum use is less than 9895%. If
the power factor, as measured by ERMU's electric department, is lower than 9895%,the monthly
demand charge may be multiplied by the ratio 98-94 divided by the measured power factor, or at
ERMU's option, the power factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy(Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission,distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
106
Elk River -�---
Municipal Utilities
TRANSMISSION TRANSFORMED SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:Available for new non-residential Customer accounts with projected demand greater than or
equal to 10 MW. The Customer must maintain an annual load factor greater than or equal to 75%. A
Customer account with a monthly billing demand of less than 10 MW for 12 consecutive months or an
annual load factor less than 75% may be switched to another electric rate schedule (additional charges
may apply to recover stranded costs). The Customer owned equipment must be in compliance with all
policies, procedures, safety requirements, and applicable electrical codes.
Character of Service: 3-Phase Transmission Transformed 7,200/12,470-volt, AC, 60 cycles.
Special Conditions:The Customer must execute a contract with the utility that commits to a minimum
term of service, identifies the annual peak demand and load factor, agrees to the requirements for
registering generation with Midcontinent Independent System Operator(MISO) if applicable, and
accepts the certain risks that include fluctuating market-based rates and prices established by MISO.
The Customer must connect directly to the Utility's distribution substation(s) and provide the location
suitable for the installation of the utility owned transformer(s) and metering equipment on the
Customer's property. Customer will be responsible for providing suitable wire and connection in the
utility owned metering equipment. The metering equipment shall be installed to service one class of
business. If additional buildings are required for a given business, they shall be interconnected by the
customer to maintain one metered account, unless an exception is approved by management. If
additional meters and services are requested by the customer, each shall be treated as a separate
customer and billed individually.
ERMU equipment and metering must be accessible to ERMU 24 hours per day.
Transmission Demand Charge:
Transmission Demand charges are determined by monthly maximum metered 15-minute Customer
demand, adjusted for applicable MISO zone transmission losses. All applicable MISO transmission
charges, including but not limited to the below, shall apply to all transmission demand quantities:
A. Schedule 1
B. Schedule 2
C. Schedule 9
D. Schedule 26
Page 1 of 3
107
Transmission Transformed Service Rate
Capacity Charge:
Capacity charges are determined by Customer selection of one of the options below:
A. If customer has its own generation,then the capacity billing determinant shall be the maximum
metered 15-minute demand in excess of Customer's registered generation in a given month. To
qualify for this billing determinant, Customer's generation must be registered with MISO and
comply with all MISO requirements for capacity resources.
B. If Customer does not have its own generation, or if Customer fails to register its generation with
MISO or fails to comply with all MISO requirements for capacity resources,then the capacity
billing determinant shall be monthly maximum metered 15-minute Customer demand.
The following charges shall apply to all capacity quantities.The above-defined billing determinant
multiplied by:
A. $11.0040,60 per kW-month for all capacity quantities during the months of June through
September.
B. $3.753.50 per kW-month for all capacity quantities during the months of October through May.
Energy Charge:
Energy billing is determined by actual hourly usage. The following charges shall apply to all energy (kWh)
quantities:
A. MISO Real-Time Locational Marginal Price at the applicable MISO Node.
B. All applicable MISO Ancillary Services Charges.
C. MISO Multi-Value Project Charges.
D. A charge of$0.0021 per kWh for the cost of compliance with the State of Minnesota's
Renewable Energy Standard.
E. A charge of$0.01 per kWh to cover all dispatch, billing, and administrative costs.This charge
shall be inclusive of all regulatory charges collected by Utility on all customers.
City fees, such as franchise and storm water, will apply.
Federal, state, and local taxes may apply.
Failure to Generate: If Customer has registered generation that does not perform as registered when
requested by utility, utility's wholesale supplier, or MISO, Customer shall be responsible for:
A. Any financial or other penalties imposed by MISO related to the generation's failure to perform.
B. All costs of utility or utility's wholesale supplier to acquire replacement capacity to replace
registered generation that did not perform.
Transformation Charge: Customer shall pay a monthly transformation charge based on the cost of
providing transmission transformed service to Customer, including recovery of costs for any new
substation or related facilities.
Page 2 of 3
108
Transmission Transformed Service Rate
Minimum Bill: Charges for failure to meet minimum peak demand and load factor requirements shall be
outlined in the contract between Customer and Utility.
Power Factor Adjustment: Power factor adjustments may be made in the billing demand, when the
power factor, as determined by test, at the time of the Customer's maximum use is less than 9895%. If
the power factor, as measured by ERMU's electric department, is lower than 9895%,the monthly
demand charge may be multiplied by the ratio 9895%divided by the measured power factor, or at
ERMU's option, the power factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy(Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Service shall comply with all applicable ERMU Policies and rules.
2. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
3. Customer is responsible for any new charges or fees imposed by MISO or any new regulatory or
legislative action that results in increased costs to provide power supply to Customer.
4. All rates in this electric rate schedule are subject to change with commission approval.
5. Exceptions by management approval only.
Adopted December 14,2021April 13, 2021
Revised May 11,2021
Effective January 1, 2022May 11, 2021
Page 3 of 3
109
Elk River ---1
Municipal Utilities
COMMERCIAL CLEAN ENERGY CHOICE PROGRAM RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To ERMU customers receiving service under another commercial electric rate.
This Program is available to commercial customers choosing to purchase renewable energy. Customers'
will be required to participate for one calendar year and the applicable Clean Energy Choice incremental
charge will apply to all energy sold in the calendar year.
The customer shall agree to:
1. Contact ERMU staff to discuss program participation.
2. Sign a contractual agreement for one calendar year prior to December 1 for participation in the
upcoming year.
3. Continue to participate in the program annually until customer provides written notice of
cancelation to ERMU.
4. Provide written notice of cancelation in the program to ERMU prior to December 1 of a given
year for the upcoming year.
ERMU shall provide:
1. Estimate of annual incremental charge for participating in program.
2. Clean Energy Choice incremental charge per kWh is $0.002001.
3. The incremental charge applies to all kWh purchases in excess of the Wholesale Renewable
Energy Standard.
4. The incremental charge will be calculated based on actual kWh consumed in the billing period.
5. The incremental charge will be calculated as follows:
[kWh consumed X (100%-Wholesale Renewable Energy Standard) X$0.002081]
6. Monthly billing statement with the Clean Energy Choice incremental charge identified.
7. Program price changes by November 1 for the coming year.
Federal, state and local taxes may apply.
Adopted December 148, 20210
Effective January 1, 20221
Page 1 of 1
110
Elk River ----
Municipal Utilities
OFF-PEAK DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demand greater than or equal to 50 kW. A Customer account with a billing demand
of less than 50 kW for 12 consecutive months will be given the option of switching to the Non-Demand
rate.The Customer accounts shall be in compliance with all policies, procedures, and safety
requirements, and shall be taken through one meter. (Not applicable to resale, standby or auxiliary
service.)
Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts,three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now
being served by this voltage. A customer requiring voltages other than that already established shall be
required to provide suitable space location of ERMU's transformers, metering and associated
equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter,
unless an exception is approved by management. If additional meters and services are requested by the
customer, each shall be treated as a separate customer.
Meter equipment must-to be accessible to our service department at any time.
Off Peak Demand Service Rate:
Basic Monthly Electric Charge:$85.00410 per month.
Summer Winter
Demand Charge:
On-Peak $16.0015.50 $12.0011.58 in kW/ month
Off-Peak $6.306.25 $6.30€.. 5 in kW/month
Energy Charge: $0.07110680 $0.07140680 in kWh/month
On-Peak Demand: Actual demand during On-Peak Periods
On-Peak Period: 3:00 PM -10:00 PM weekdays
Off-Peak Demand: Actual demand during Off-Peak Periods less On-Peak Demand
Off-Peak Period: All non On-Peak Periods
Summer Rate:Applicable during the five monthly billing periods of June—October.
Winter Rate:Applicable during the seven monthly billing periods of November—May.
Rates are subject to application of Power Cost Adjustment (PCA).
Page 1 of 2
111
Off-Peak Demand Electric Service Rate
Federal,state, and local taxes may apply.
Minimum Bill: Maximum billing demand during previous twelve months times 3.0%of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus$1.00 per kW
per month of excess transformer capacity requested by customer.
Determination of Billing Demand:The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
But in no month shall the billing demand be greater than the value in kW determined by dividing the
kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the
customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of
isolating the load from the balance of ERMU's system so that the load will not unduly interfere with
service on ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across-
the-line started without notification and written authorization from ERMU.
In addition, Customers who fail to provide adequate corrective equipment shall be required to own and
maintain their own transformers.
Power Factor Adjustment: For loads of 50 kW or more, or at the option of ERMU for loads of less than
50 kW, power factor adjustments will be made in the billing demand,when the power factor,as
determined by test, at the time of the Customer's maximum use is less than 9895%. If the power factor,
as measured by ERMU's electric department, is lower than 9895%,the monthly demand charge may be
multiplied by the ratio 9895%divided by the measured power factor, or at ERMU's option,the power
factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
S. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
112
Elk River --
Municipal Utilities
COMMERCIAL ALL ELECTRIC WITH GROUND SOURCE HEAT PUMP SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To commercial customers having a single meter that includes a ground source heat pump
(GSHP) in excess of 50 kW but no more than 150 kW in aggregated name plate capacity of the GSHP
equipment (condensers and pumps).
Character of Service:AC, 60 cycles, 120/240 volts,three wire,and three-phase.
Special Conditions:This Program is available to commercial customers. A GSHP will be the only central
heating and/or cooling system for the commercial workspaces. Commercial structures that are
classified as Utility and Miscellaneous Group U by the International Code Council are not eligible for this
rate. GSHPs that qualify for this program will not be interrupted. A GSHP paired with another heating
source such as natural gas, fuel oil, or propane may qualify for the Dual Fuel Program.
To qualify for the special rate,the customer shall provide:
1. The GSHP is the only heat source. Only closed loop GSHPs are eligible for this rate beginning
September 1, 2016.
2. ERMU and the customer will agree on a meter location prior to the meter socket installation.
3. Commercial customers may have a separate meter to determine the energy and demand of the
GSHP. Electric usage for the non-heating/cooling energy use of the building may be metered and
priced using the appropriate rate (demand, or non-demand)schedule.
4. Accommodations for a meter and associated wiring installed according to the applicable
electrical codes and will be installed by a qualified electrician.
5. Inspection by a State certified inspector and representative of ERMU.
6. Customers on this rate will not be eligible for the Dual Fuel Program.
Meter equipment mustte be accessible to our service department at any time.
Ground Source Heat Pump Service Rate:
Basic Monthly Electric Charge:$35.0030.80 per month
Energy Charge: $0.09540 09/kWh
Rates are subject to application of Power Cost Adjustment (PCA).
Federal,state, and local taxes may apply.
Minimum Bill: Basic Monthly Electric Charge.
Page 1 of 2
113
Commercial All Electric with Ground Source Heat Pump Service Rate
Billing and Terms of Payment:See ERMU Service Policies Policy(Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate, or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
114
4
Elk River -�-,
Municipal Utilities
GROUND SOURCE HEAT PUMP PROGRAM RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To single family residences, non-demand and demand customers receiving service under
another rate, who add a second meter for any of the following controlled loads:
Ground Source Heat Pump Rate: This Program is available to residential and commercial customers. A
ground source heat pump (GSHP) is a central heating and/or cooling system for residential living spaces
or commercial work spaces. Residential living spaces will meet all the applicable Minnesota state
building codes. Commercial structures that are classified as Utility and Miscellaneous Group U by the
International Code Council are not eligible for this rate. This program is available to residential or
commercial customers with a GSHP as their sole heat source. GSHPs that qualify for this program will
not be interrupted. A GSHP paired with another heating source such as natural gas,fuel oil, or propane
may qualify for the Dual Fuel program.
To qualify for the special rate,the customer shall provide:
1. The GSHP is the only heat source. Only closed loop GSHPs are eligible for this rate beginning
January 1, 2016.
2. ERMU and the customer will agree on a meter location prior to the meter socket installation.
3. Commercial customers may have a separate meter to determine the load of the heat pumps.
Electric usage for the remainder of the building will be metered and priced using the
appropriate rate (Demand or Non-Demand).
4. Accommodations for a meter and associated wiring installed according to the applicable
electrical codes and will be installed by a qualified electrician.
5. Inspection by a State certified electrical inspector and a representative of ERMU.
ERMU shall provide:
1. All electric energy consumed by the primary electric heating system at $0.095401409 per kWh.
2. A meter socket to accommodate the meter in a mutually agreed to location.
3. A meter to measure electricity consumed by the electric heating system.
Rates are subject to application of Power Cost Adjustment(PCA).
Federal,state, and local taxes may apply.
Adopted December 148, 20210
Effective January 1, 20221
Page 1 of 1
115
Elk River ----
Municipal Utilities
ELECTRIC VEHICLE CHARGING RATES
Residential and Commercial Electric Vehicle Charging Rate
Available:Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To single family residences, non-demand and demand customers receiving service under
another rate.
Electric Vehicle Charging Rate:This Program is available to all customers of ERMU that own an
electrically powered vehicle used for on road transportation. Charging of the vehicle can occur any time
but will be subject to on-peak and off-peak energy charges per hour daily. On-peak hours are Monday
through Friday between 10 AM and 10 PM. Off-peak hours are Monday through Friday between 10 PM
and 10 AM, Saturdays,Sundays, and the following holidays ( New Year's Day, Memorial Day,
Independence Day, Labor Day,Thanksgiving Day, and Christmas Day).
To qualify for the special rate,the customer shall provide:
1. Electric vehicle charging station that is used for the sole purpose of charging electric vehicles.
This charging station must be 240 volt.
2. Customer is responsible for installation of the additional meter socket in a mutually agreed upon
location.
3. Inspection by a State Certified electrical inspector of all metering equipment and provide an
affidavit to ERMU when completed.
ERMU shall provide:
1. All on-peak electric energy consumed by the electric vehicle charging equipment will be at the
summer rate of$0.13341270/kWh for the five monthly billing periods of June—October, and
the winter rate of$0.121844-69/kWh for the seven monthly billing periods of November—May.
2. All off-peak electric energy consumed by electric vehicle charging equipment will be at the rate
of$0.06329692/kWh.
3. This equipment will be available for charging at applicable rates 24 hours per day and is not
subject to any load control strategies.
4. All electric energy provided to an account that participates in this rate will be automatically
enrolled in the Clean Energy Choice Program at the 100 percent participation level at no
additional monthly charge.
5. All electric energy provided for the electric vehicle charging equipment will be 100 percent
renewable.
6. Electric meter.
7. Final inspection prior to meter activation to ensure only qualified loads are being supplied
through the electric vehicle charging equipment.
Page 1 of 2
116
Electric Vehicle Charging Rates
Rates are subject to application of Power Cost Adjustment (PCA).
Federal,state, and local taxes may apply.
Public Electric Vehicle Charging Rate:This rate is available to anyone charging an electric vehicle or
plugin electric vehicle at a public electric vehicle charging station owned and operated by ERMU within
the ERMU service territory. All persons must have an active ChargePoint account or have the capability
to create a ChargePoint account prior to utilizing the charging equipment for an electric vehicle or plug-
in hybrid electric vehicle.
To charge at the public charging stations customers shall:
1. Utilize their existing ChargePoint account or create a new account using a credit or debit card
prior to charging the electric vehicle or plug-in hybrid.
ERMU shall provide:
1. Access to public electric vehicle charging stations located in the ERMU service territory.
2. The chargers will be either level two (240 volt) or DC Fast Charging(480 volt) charging
equipment.
3. Electric energy consumed at the level two charging stations will be at a rate of$0.1500 per kWh
at all times.
4. Electric energy consumed at the DC Fast Charging station will be at a rate of$0.2000 per kWh at
all times.
5. Electric energy provided at the public electric vehicle charging stations will be 100 percent
renewable.
Federal, state, and local taxes may apply.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
117
Elk River ----
Municipal Utilities
MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS
ENERGY MANAGEMENT PROGRAM RATES
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable:To single family residences, non-demand and demand customers receiving service under
another rate, who add a second meter for any of the following controlled loads:
Dual Fuel Space Heating Rate: This Program is available to residential customers only. A dual fuel space
heating system consists of an electric heating system and a secondary non-electric space heating system
both capable of heating the living space at design conditions. Interruptions of the electric heating
system will usually occur for up to 12 hours daily on peak winter days and a maximum of 400 hours per
heating season.
To qualify for the special rate, the customer shall provide:
1. An electric space heating system which can be interrupted by a single 5 amp rated relay.
2. A secondary non-electric space heating system capable of automatic start-up and continuous
operation upon interruption of the electric heating system.
3. Obtain a load control device furnished by ERMU.
4. Accommodations for a meter and load control device and associated wiring installed according
to the applicable electrical codes, and installed by a qualified electrician.
5. Inspection by a State certified electrical inspector and a representative of ERMU.
6. Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage.
7. Dual Fuel is not allowed in garages, pole sheds, or any structure that does not confirm to the
residential building code.
8. Exceptions by management approval only.
ERMU shall provide:
1. All electric energy consumed by the primary electric heating system at $0.06320602 per kWh. I
2. During peak load conditions, ERMU will turn customer controlled electrical heat off for extended
periods of time as stated above.
3. A meter to measure electricity consumed by the electric heating system.
4. A load control device and meter socket to accommodate the meter.
Rate is subject to application of Power Cost Adjustment (PCA).
Federal, state and local taxes may apply.
Page 1 of 3
118
MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE Ff1 i nWtiril\ir LOAD CONTROL PROGRAMS
Energy Management Program Rates
Electric Thermal Storage (ETS)Space Heating Rate: This Program is available to all ERMU customers.
An ETS space heating system is designed to store heat produced by electricity generated during eight
off-peak hours for use in heating during the remaining on-peak hours daily. Off-peak hours typically
occur between 11 PM and 7 AM. Qualifying ETS configurations may be central storage furnaces, room
storage heaters or slab (deep heat) systems including combinations of same.
To qualify for the special rate,the customer shall provide:
1. An ETS space heating system listed by UL or some other nationally recognized testing agency
which can be interrupted by a single 5 amp rated relay.
2. Obtain a load control device from ERMU.
3. Accommodations for a meter and load control device and associated wiring installed according
to the applicable electrical codes, and installed by a qualified electrician.
4. Inspection by a State certified electrical inspector and a representative of ERMU.
ERMU shall provide:
1. All electric energy consumed by this ETS system at$0.0486046-3 per kWh.
2. This equipment will be energized only for 8 off peak hours daily. Additional on-time is provided
on weekend days and holidays.
3. A meter to measure electricity consumed by the ETS space heating system.
4. A load control device which will automatically control ETS space heating system during on-peak
hours.
Rate is subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Electric Thermal Storage(ETS)Water Heating Rate:This Program is available to all ERMU customers.
An ETS water heater is designed with extra storage capacity to provide total domestic hot water needs
from electricity consumed only during eight off-peak hours daily. Off-peak hours typically occur between
11 PM and 7 AM. Qualifying ETS configurations may be a large single tank, dual tanks plumbed in series,
or an electric and non-electric tank plumbed in series with the electric placed on the cold water side.
Electric water heater must have an energy factor of.91 or more and a minimum of 80 gallons of storage
capacity.
To qualify for the special rate,the customer shall provide:
1. An ETS water heating system which can be interrupted directly by a single 30 amp rated relay.
2. Obtain a load control device from ERMU.
3. Accommodations for a meter and load control device and associated wiring installed according
to the applicable electrical codes, and installed by a qualified electrician.
4. Inspection by a State certified electrical inspector and a representative of ERMU.
5. This rate is not available for hot water use in any production process for Commercial and
Industrial users.
Page 2 of 3
119
MORATORIUM EFFECTIVE FEBRUARY 14 7017 ON THE FOLLOWING LOAD CONTROL PROGRAMS
Energy Management Program Rates
ERMU shall provide:
1. All electric energy consumed by the ETS water heater at$0.048604€3 per kWh.
2. This equipment will be energized only for 8 off-peak hours daily.
3. A meter to measure electricity consumed by the ETS water heater.
4. A load control device and meter socket to accommodate the off-peak meter.
Rate is subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Adopted December 148,20210
Effective January 1, 20221
Page 3 of 3
120
4*-
Elk River
Municipal Utilities
STREET/SECURITY LIGHT SERVICE RATE
Available:To any customer meeting Elk River Municipal Utilities (ERMU) criteria for service under this
schedule, and whose lighting needs are not being furnished under any other schedule. Installation costs
will be determined by ERMU per the Utilities Fee Schedule or on a time and materials basis.
Applicable:As determined by ERMU, but generally to non-metered roadway and area lighting.
Character Of Service: 120/240 volts, AC, as available.
Street/Security Light Service
Federal, state, and local taxes may apply.
Type Monthly Rate Per
Fixture
Standard Low Output (<249 Watt HPS, <74 Watt LED) $10.00
Standard Medium Output (250-399 Watt HPS, 75-124 Watt LED) $16.00
Standard High Output (400 Watt or larger HPS, 125 Watt or larger LED) $21.00
Standard Low Output with Decorative Pole (<74 Watt LED) $18.00
Decorative Medium Output with Decorative Pole (75-124 Watt LED) $26.0024.00
Ownership of Equipment: ERMU will install, own, and operate the lights, including fixtures and control
equipment, unless otherwise agreed upon by ERMU and the Customer.
Lamp Replacements: Lamp replacements will be made by ERMU.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
General Terms and Conditions Applicable To Non-Metered Lighting Service:
1. Area lighting installed on ERMU poles shall not be of the type that interferes with climbing
room, work space, or wire clearance as defined by the National Electrical Safety Code and is to
be installed below the secondary line and service drops, all per ERMU's specification.
2. All area lights installed under this schedule shall be equipped with a photo-electric control which
will limit the hours of illumination from dusk to dawn (approximately 4,400 hours per year).
3. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
Page 1 of 2
121
Street/Security Light Service Rate
4. Exceptions by management approval only.
Adopted December 148, 20210
Effective January 1, 20221
Page 2 of 2
122
Elk River
Municipal Utilities
WATER SERVICE RATES
Available: To all customers who have municipal water service available at their property, lying within
the corporate limits of the City of Elk River.
Special Conditions: Each customer served by one meter. Multiple living entities, such as apartments,
may be served by a combined meter upon approval of the Elk River Municipal Utilities (ERMU) and
acceptance of applicable charges.
Special Charges:A basic monthly water charge shall be applied to each meter based on the meter size
according to the schedule below, and is separate from any water use. Included in the basic monthly
water charge is $0.81 that is collected on a monthly basis from each service connection (excluding
irrigation only accounts)to recover the total annual cost of$9.72 for the State of Minnesota Safe Water
Testing Program (Minnesota Statutes 144.3831).
Water Rates:
BASIC MONTHLY 1st TIER 2nd TIER 3rd TIER
METER TYPE CHARGE Cost per 1000 Cost per 1000 Cost per
gallons gallons 1000 gallons
Residential $9.649:40 $1.94149 $3.50 $4.00
Commercial % $11.5611.28 $1.94 89 $3.50 $4.00
Commercial 1 $12.8612.55 $1.941.89 $3.50 $4.00
Commercial 1% $14.1613.81 $1.94449 $3.50 $4.00
Commercial 1 Y2 $15.441 $1.941.89 $3.50 $4.00
Commercial 2 $20.5720.07 $1.941.89 $3.50 $4.00
Commercial 3 $44.9943.89 $1.9411.89 $3.50 $4.00
Commercial 4 $61.71€0-28 $1.941.89 $3.50 $4.00
Commercial 6 $89.988 9 $1.944-89 $3.50 $4.00
Commercial 8 $1.944:59 $3.50 $4.00
$122.13119.15
Commercial Irrigation
Seasonally or $20.5720.07 $3.50 $4.00
Permanently Installed
Federal,state, and local taxes may apply.
Page 1 of 2
123
Water Service Rates
Residential Rate Tier Definition:
First Tier Rate =0—9,000 gallons per month.
Second Tier Rate= Between 9,000 and 15,000 gallons per month.
Third Tier Rate=Above 15,000 gallons per month.
Commercial Rate Tier Definition:
First Tier Rate=0—1.1 X previous year's winter measurement period average monthly consumption.
Second Tier Rate= Between 1.1 X previous year's winter measurement period average monthly
consumption to 1.1 X previous year's winter measurement period average monthly consumption +
40,000 gallons.
Third Tier Rate=Above 1.1 X previous year's winter measurement period average monthly
consumption +40,000 gallons.
Winter Measurement Period Definition: December—April billing cycles.
For new customers, if a minimum of 3 winter months previous year's history is not available to establish
the Tier amount,the First Tier rate shall be utilized until a minimum of 3 months history is established.
Commercial irrigation is not eligible for First Tier Rate as there is no winter use.
Minimum Bill: Basic monthly water charge plus any charges applicable to multiple living entities.
Billing and Terms of Payment:See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Adopted December 148, 20210
Effective January 1, 20212
Page 2 of 2
124
Elk River
Municipal Utilities 2022 Utilities Fee Schedule
ELECTRIC
New Residential Electric Connection - Developer- Lot with ERMU water service $475.00
New Residential Electric Connection -Developer-Lot without ERMU water service $575.00
New Electric Connection -Builder $875.00
New Wire Footages over 200'(per foot) $4.00
New Service Frost Trenching(per foot) $5.00
New Commercial&Industrial Electric Connection 50%
Service Upgrades or Additions for Existing Customers 100%
Minimum Temporary Electric Service Fee-Existing Transformer $220.00
Minimum Temporary Electric Service Fee-Without Existing Transformer $850.00
Street Light-30' Decorative Pole with 6'Arm and Cobra Fixture $2,700.00
Street Light-23' Decorative Pole with Cobra Fixture $1,800.00
Street Light-14' Decorative Pole with Cobra Fixture $4,100.00
Street Light-14' Decorative Pole with Acorn Fixture $5,300.00
Security Light-Wood Pole with Fixture $975.00
Security Light-Existing PoLe $125.00
Pole Attachment Fee(per pole) $6.50
Manual Meter Reading Fee(per month) $10.00
Meter Installation Fee(per individually metered apartment unit) $20.00
WATER
Water Access Charge= Water Connection Charge+Water Availability Charge $3,990.00
Water Connection Charge(Per Plumbing Unit)-Builder $3,600.00
Water Availability Charge(Per Plumbing Unit)-Developer $390.00
Abandoned Water Service $2,500.00
Backflow Preventer Device Non-Compliance(per month) $100.00
Deposit for 5/8'Hydrant Meter $150.00
Deposit for 2 1/2'Hydrant Meter $1,000.00
Hydrant Water Sales-Rental(per week) $50.00
Hydrant Water Sales-Units(per 1000 gallons) $4.00
Hydrant Wrench $40.00
Manual Meter Reading Fee(per month) $10.00
Private Hydrant Maintenance Program Monthly Fee $5.00
ADMINISTRATIVE
Administrative Fee for Continued Submission of Checks After No-Check Notice Given $20.00
Billable Cost of Materials Markup 15%
Billable Labor Markup 55%
Billable Vehicle/Equipment(per employee per hour) $30.00
Commerical Application Fee $20.00
Electric Service Disconnect/Trip Fee- Meter Technician $50.00
Electric Service Disconnect/Trip Fee-Line Crew $150.00
Water Service Disconnect/Trip Fee-Water Operator $100.00
Meter Tampering Fee $250.00
Meter Testing Fee $50.00
NSF Fee $20.00
Penalty Amount 10%
Photocopies(per page) $0.25
Red Tag Handling Fee $20.00
Adopted by the Utilities Commission on November 9, 2021, under authority per Minnesota Statute 412.361
125