Loading...
6.2 SR 12-20-2021 Request for Action To Item Number Mayor and City Council 6.2 Agenda Section Meeting Date Prepared by Presentations, Awards, December 20, 2021 Amanda Erickson, Environmental Coordinator and Recognition Item Description Reviewed by Great River Energy Elk River Station Cal Portner, City Administrator Demolition and Restoration Update Reviewed by Action Requested Receive information. Background/Discussion Great River Energy (GRE) completed demolition and restoration of the Elk River Station over the last two years. GRE was able to reuse or recycle a significant amount of material in this process and has completed the restoration of the hillside. Tim Steinbeck, Director of Resource Recovery & Development, and Cassie Johnston, Environmental Administrator for the project, will provide an update to Council. Financial Impact N/A Mission/Policy/Goal N/A Attachments  None The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: August 2020 Great River Energy Tim Steinbeck, GRE DirectorCassie Johnston, GRE Environment Administrator Dec. 20, 2021–Elk River City Council decommissioning and restorationElk River Station Elk River Station Project Timeline)MnDNR(MnDOT & Permitting River Intake DEC. 2020-JULYfoundation abandonment –permitting Specific Beneficial Use -Case2020-JULY 2019 202120202019 structural demolitionAboveground DEC.-MAY Plugged river intake pipesRelocated falcon nesting box;Decom. Activities; Environmental Surveys;Companies (TX)Awarded contract to GSD DEC.–SEPT. river intake structureRemoval & restoration of water pipelines;Filling of river intake Plant site restoration;Rachel Contracting (MN)OCT.-JULY DEMO COMPLETEconcrete foundations;Partial removal of JUNE-JAN Asset recoveryactivities; Cont. decom. April-FEB. & demo.Prep for decom. ERS;No offers to buy AUG.-MAY ceasedBoiler operations equipment laid up;Facility cleaned & MAR.–JAN. generated& MWh Last RDF burned JANUARY May 2020 Demolition begins– June 6, 2020 Ash barn & stack demo underwaySubstation equipment removed July 7, 2020 Loader shed removedAsh barn & stack removed July 20, 2020 structure (AQCS) felledAir quality control August 19, 2020 removed; Baghouse felledLime silo & elevator building Overhead Conveyor Removed September 4, 2020 Superheater bldg. removed September 22, 2020 Turbine bldg. demo underway Turbine bldg. & Boiler house October 6, 2020 demo underway Boiler felling November 3, 2020 November 19, 2020 site cleanup underwayConcrete slab removal & December 9, 2020 removal continuesCleanup & partial concrete Partial concrete removal continues April 5, 2021 Warehouse structure removed; July 9, 2021 DEMOLITION COMPLETE Hillside filling & grading; August 18, 2021 intakeRiver structure & pipeline fillingremoval of river intake RESTORATION COMPLETE storage yardacre material -~2 October 12, 2021 Restored hillside October 12, 2021 native prairieplanted with - River Intake Structure MnDNRapprovals from MnDOT & Restored per direction & AfterBefore (tons)Structural Waste Materials 1,397Landfilled 6,927RecycledScrap Metal RecyledConcrete Project Statistics Site total now >12 acres■ planted ~3.4 acres native prairie River shoreline restored~100 ft of Mississippi placed for hillside~43,000 CY fill material recycled93% structural materials Elk River Campus located here~130 employees still Storage yards■ Substations■ Offices■ maintenance garageWarehouse & ■ Peaking station■ Activities & staff remain: