Item Description
Park Dedication Funds for County Road 33 Trail
Reviewed by
Cal Portner, City Administrator
Reviewed by
Action Requested
Discuss using Park Dedication Fund for County Road 33.
Recommend or reject, by motion, CR33 trail for local cost share.
Background/Discussion
At the December 8 meeting, the Commission discussed County Roads 33 and 44 trails. CR 44 trail was
recommended using park dedication funds. CR 33 was also discussed, and the Commission consensus was a
request for additional information before making a recommendation.
As requested by the Commission, the information attached was sent out early for Commissioner’s review. As
with any trail cost share project with the county, the city will be responsible for maintaining the two-mile CR 33
trail. The county will not participate in the maintenance of trails.
David Roedel from Sherburne County will attend the Commission meeting to answer questions.
Financial Impact
An updated estimate for the cost of CR 33 trail from Hwy. 169 to Twin Lakes Road is $1.74 M. This
updated city cost share is based on a more detailed design that has gone into the layout since the first
concept level estimate.
Attachments
CR 33 Sherburne County Information
CR 33 Cost Share Estimate
Park Dedication projects spreadsheet
Memorandum
www.srfconsulting.com
3701 Wayzata Boulevard, Suite 100 | Minneapolis, MN 55416-3791 | 763.475.0010
Equal Employment Opportunity / Affirmative Action Employer
SRF No. 13725
To: Justin Femrite, PE
City of Elk River
From: Nate Will, PE
Date: December 13, 2021
Subject: City Trail Addition along CSAH 33 from TH 169 to CSAH 13, Sherburne County
Copied: David Roedel, PE
Sherburne County
In response to our discussions related to the addition of a City Trail, the following information
documents our understanding of the location and design criteria that relates to the City Trail.
Included with this memo is an exhibit of the roadway that shows how the City Trail would likely fit
along the south side of CSAH 33 and shows a comparison of the approximate additional preliminary
construction limit impacts for both the rural ditch option (current 30% design) and with the addition
of the 10-foot trail. Also included are the conceptual cross sections and a copy of the preliminary
construction estimate.
Criteria used to add City Trail along CSAH 33:
1. Add concrete curb and gutter paralleling the south shoulder edge of CASH 33.
a. High speed road use 4-inch curb height.
b. Use B424 concrete curb and gutter.
c. Maintain 8-foot shoulder width measured from travel lane to face of curb.
2. Maintain a 10-foot boulevard measured from face of curb to north edge of trail.
a. Exceptions to this will be along right turn lanes upon approaching an intersection.
i. The Bikeway Manual offers guidance to reduce the boulevard to 6-foot minimum for
roadways with design speeds of 50 and 55 mph at side street intersections. In extreme
situations, further reduction of the boulevard to 2.67 feet (2 feet from back of curb to
trail) is allowed. Additional evaluation and coordination with both the County and City
is needed to finalize the design at the side street intersections to maximize safety while
minimizing impacts to adjacent properties.
· The attached layout currently shows a 6-foot boulevard along the right turn lanes.
Justin Femrite, PE December 14, 2021
City of Elk River Page 2
· Potential street signs along the right turn lanes would need to be evaluated for
clearzone requirements. Street signs that impact the clearzone would be installed
outside the trail to meet clearzone requirements.
b. Space within the boulevard is needed for mailboxes while providing minimum clearzone for
trail. Most street signs would be allowed within the boulevard area assuming adequate width
is provided on either side of sign to meet the 2-foot clearzone requirement to the trail and a
10-foot clear area measured from the travel lane.
c. Residential driveway impacts may increase to accommodate trail cross slope (max. 1.5%)
constructed through driveways.
3. 10-foot-wide City Trail with a design section per Elk River Std Plate 2012 (2.5-inches
bituminous and 6-inches aggregate base class 5).
4. A minimum 2-foot clearzone is required along either side of the trail.
a. In areas of environmental concern or potentially large fill impacts to adjacent property,
consider steepening the inslope to 1V:2H along the south side of the trail.
i. This requires the clearzone to be increased from 2 feet to 5 feet, along with the
consideration of adding a safety rail or fencing.
ii. These areas include the Trott Brook crossing and existing wetland areas along the
south side of CSAH 33 west of Quincy Road (Refer to cross sections attached with
this memo).
b. In several key locations, the conceptual grading impacts are relatively large and may severely
impact existing wetlands. Additional design will be needed to review the potential for using
retaining walls or potentially a 1V:1H reinforced soil slope (RSS) system.
i. Additional soil borings would be necessary for this option.
5. Construct intersection lighting at the side street intersections (Auburn St, Yale St, Vance St,
Smith St, Ulysess St, Qunicy Rd, and Brook St) to improve pedestrian safety.
Construction Cost Summary
Table 1 below summarizes the estimate construction costs for the CSAH 33 project and the
additional costs for the City Trail. These estimated costs do not include additional costs for
preliminary/final design or construction staking/administration, and costs for additional right-of-
way or easements (temporary or permanent) as needed for the City Trail. A detailed copy of the
estimated construction costs is attached with this memo.
Table 1. Estimated Construction Cost Summary
Description Estimated Cost
CSAH 33 without trail $6,958,000
City Trail $1,370,000
Estimated Total Project: $8,328,000
Justin Femrite, PE December 14, 2021
City of Elk River Page 3
Additional Design / Project Costs
Prior to adding the proposed City Trail, the County completed a topographical survey, developed a
preliminary layout, held a virtual public engagement process, compiled a 30% Plan, completed the
Wetland TEP and MnDOT CRU approval process, and confirmed the overall drainage guidance to
be followed through final design. These items were established before adding the City Trail.
Additional professional services will be needed to incorporate the City Trail into the County’s CSAH
33 project. We anticipate the following professional services will be needed, but are not limited to:
· Revision to the overall Project Schedule
· Topo surveys – south of CSAH 33 / west of Auburn St and potentially driveways (as needed)
· Wetland Delineation / LGU / TEP amend previous delineation report
· MnDOT CRU – coordinate / clear additional trail areas
· Environmental Documentation
o Coordinate with MnDOT Federal Aid Staff to add City Trail to CATEX
o Review and update Noise Wall Analysis for trail
· Update Preliminary design and layout to add City Trail
o Confirm typical section rural to urban (south side)
Wider grading limits in key areas
Additional tree impacts / damages on private property
o Review potential profile changes on CSAH 33 to reduce impacts south side of trail
· Coordinate additional soil borings for widened trail embankments and/or walls
· Identify need for retaining walls
· Review driveway grading / tie-ins for trail cross slope
· Review overall stormwater approach / redesign drainage system completely
o Replace driveway culverts with storm system
o Daylight storm sewer outside trail - impacts to properties
o Identify new stormwater treatment areas / methods
· Prepare materials for Public Engagement to highlight City Trail addition.
· Update 30% Construction Plan and Estimate to reflect City Trail improvements
· Review and coordinate need for additional Permanent and Temporary Easements
· Final Design – incorporate additional trail / ped ramp items
· Coordinate with MnDOT D3 on involvement needed for trail connection at TH 169 exit ramp.
Justin Femrite, PE December 14, 2021
City of Elk River Page 4
SRF is working to identify the additional design costs that will be needed to incorporate the City Trail
improvements into the CSAH 33 project. These costs will be coordinated with the County and City prior to
initiating any additional work beyond what, as of this date, has been previously completed and that is related
to the City Trail attachments included with this memo. We anticipate a formal amendment would be
approved by the County with a formal agreement from the City of Elk River.
H:\Projects\13000\13725\_Sent\Other\ElkRiver\211116_Trail Criteria and Layout\13725_TrailMemo_R1.docx
SRF Comm No 13725.00
H:\Projects\13000\13725\Design\Cost Estimates\13725_Trail Estimate_R1.xlsx
PRINTED: 12/30/2021 12:32 PM
SHERBURNE CO. CSAH 33 - CONCEPTUAL TRAIL COST
Concept Cost Estimate (based upon 2020 bid price information)
Prepared By: SRF Consulting Group, Inc., Revised December 30, 2021
UNIT EST. EST.COST COST
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT SPLIT SPLIT
PAVING AND GRADING COSTS
GrP 2a 2106 Common Embankment (CV)cu. yd.$6.00 25,500 $153,000 $153,000
GrP 4b Bituminous Walk / Trail (1)sq. yd.$25.00 10,340 $258,500 $258,500
GrP 4c ADA Pedestrian Curb Ramp each $1800.00 8 $14,400 $14,400
GrP 5 Concrete Curb and Gutter lin. ft.$28.00 9,085 $254,380 $254,380
Additional Tree Clearing/Grubbing (to construct trail)acre $10000.00 1.3 $13,000 $13,000
SUBTOTAL PAVING AND GRADING COSTS:$693,280 $693,280
DRAINAGE, UTILITIES AND EROSION CONTROL
Dr 5 Drainage - urban 30%$208,000 $104,000 $104,000
SUBTOTAL DRAINAGE, UTILITIES AND EROSION CONTROL $208,000 $104,000 $104,000
RETAINING WALLS & OTHER MINOR STRUCTURAL COSTS
RW 1 Box Culvert - (2)lin. ft.$3,050 20 $61,000 $61,000
RW 2 Cattle Pass lin. ft.$300 20 $6,000 $6,000
RW 3 Reinforced Soil Slope (RSS) & Mod. Block Retaining Walls (3)sq. yd.$160 950 $152,000 $30,400 $121,600
RW 28 Large Block Gravity Wall (3)sq. ft.$48 1,000 $48,000 $48,000
SUBTOTAL RETAINING WALLS & OTHER MINOR STRUCTURAL COSTS:$338,250 $30,400 $307,850
LIGHTING COSTS
SGL 3 At Grade Intersection Lighting (permanent - non signalized)(4)each $18,000 7 $126,000 $126,000
SGL 4 Modify Lighting Unit at TH 169 Exit Ramp each $10,000 1.00 $10,000 $10,000
SUBTOTAL LIGHTING COSTS:$136,000 $10,000 $126,000
SUBTOTAL CONSTRUCTION COSTS:$1,375,530 $144,400 $1,231,130
MISCELLANEOUS COSTS
M 2 Non Quantified Minor Items 5%$70,000 $8,000 $62,000
SUBTOTAL MISCELLANEOUS COSTS:$70,000 $8,000 $62,000
ESTIMATED TOTAL CONSTRUCTION COSTS without Contingency:$1,445,530 $152,400 $1,293,130
1 Contingency or "risk"15%$217,000 $23,000 $194,000
ESTIMATED TOTAL CONSTRUCTION COSTS PLUS CONTINGENCY:$1,662,530 $175,400 $1,487,130
OTHER PROJECT COSTS:
R/W ACQUISITIONS (ADD. TEMP EASEMENT FOR TRAIL)sq. ft. $1.00 70000 $70,000 $70,000
DESIGN ENGINEERING Lump Sum $180,000 1 $180,000 $180,000
SUBTOTAL OTHER PROJECT COSTS $250,000 $250,000
TOTAL PROJECT COST $1,912,530 $175,400 $1,737,130
NOTE:
(1)2.5" Bituminous and 6" aggregate base class 5 per Elk River Std Plt 2012
(2)Does not include excavation.
(3)
(4)Intersection / Ped lighting, 7 "T" intersections, 2 light units per intersection, separate service cabinets and equipment.
Estimate does NOT include any costs for Construction Administration.
City of Elk RiverCSAH 33 Trail Sherburne County
Additional cost for Reinforced Soil Slopes and/or smaller large block retaining walls are anticipated in key locations to reduce impacts to
wetlands and private properties.
City of Elk River
Park Dedication Fund
2022 2023 2024 2025 2026
Estimate Estimate Estimate Estimate Estimate
Cash Balance - Beginning $932,450 $853,030 ($690,320) ($761,540) ($582,760)
Revenues:
Park dedication 300,000 150,000 150,000 150,000 150,000
Sale of property - Pinewood CD 28,780 28,780 28,780 28,780 28,780
Interest 16,300 15,000 - - -
Total Revenues 345,080 193,780 178,780 178,780 178,780
Expenditures:
Lions Park - Ninja/Fitcore system 285,000 - - - -
YAC - playground safety netting 50,000 - - - -
Orono Pk - sec. cameras/pickleball access. 89,500 - - - -
CR 33 Trail - Local cost share - 1,737,130 - - -
CR 44 Trail - Local cost share - - 250,000 - -
Total Expenditures 424,500 1,737,130 250,000 - -
Revenues over/(under) Expenditures (79,420) (1,543,350) (71,220) 178,780 178,780