5.1ze ERMUSR 01-11-2022 2022 Utilities Fee Schedule
ELECTRIC
New Residential Electric Connection - Developer - Lot with ERMU water service$475.00
New Residential Electric Connection - Developer - Lot without ERMU water service$575.00
New Electric Connection - Builder$875.00
New Wire Footages over 200' (per foot)$4.00
New Service Frost Trenching (per foot)$5.00
New Commercial & Industrial Electric Connection 50%
Service Upgrades or Additions for Existing Customers 100%
Minimum Temporary Electric Service Fee - Existing Transformer$220.00
Minimum Temporary Electric Service Fee - Without Existing Transformer$850.00
Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture$2,700.00
Street Light - 23' Decorative Pole with Cobra Fixture$1,800.00
Street Light - 14' Decorative Pole with Cobra Fixture$4,100.00
Street Light - 14' Decorative Pole with Acorn Fixture$5,300.00
Security Light - Wood Pole with Fixture$975.00
Security Light - Existing Pole$125.00
Pole Attachment Fee (per pole)$6.50
Manual Meter Reading Fee (per month)$10.00
Meter Installation Fee (per individually metered apartment unit)$20.00
WATER
Water Access Charge = Water Connection Charge + Water Availability Charge$3,990.00
Water Connection Charge (Per Plumbing Unit) - Builder$3,600.00
Water Availability Charge (Per Plumbing Unit) - Developer$390.00
Abandoned Water Service$2,500.00
Backflow Preventer Device Non-Compliance (per month)$100.00
Deposit for 5/8" Hydrant Meter$150.00
Deposit for 2 1/2" Hydrant Meter$1,000.00
Hydrant Water Sales - Rental (per week)$50.00
Hydrant Water Sales - Units (per 1000 gallons)$4.00
Hydrant Wrench$40.00
Manual Meter Reading Fee (per month)$10.00
Private Hydrant Maintenance Program Monthly Fee$5.00
ADMINISTRATIVE
Administrative Fee for Continued Submission of Checks After No-Check Notice Given$20.00
Billable Cost of Materials Markup 15%
Billable Labor Markup 55%
Billable Vehicle / Equipment (per employee per hour)$30.00
Commerical Application Fee$20.00
Electric Service Disconnect/Trip Fee - Meter Technician $50.00
Electric Service Disconnect/Trip Fee - Line Crew$150.00
Water Service Disconnect/Trip Fee - Water Operator$100.00
Meter Tampering Fee$250.00
Meter Testing Fee$50.00
NSF Fee$20.00
Penalty Amount 10%
Photocopies (per page)$0.25
Red Tag Handling Fee$20.00
Adopted by the Utilities Commission on November 9, 2021, under authority per Minnesota Statute 412.361
110