Loading...
5.1ze ERMUSR 01-11-2022 2022 Utilities Fee Schedule ELECTRIC New Residential Electric Connection - Developer - Lot with ERMU water service$475.00 New Residential Electric Connection - Developer - Lot without ERMU water service$575.00 New Electric Connection - Builder$875.00 New Wire Footages over 200' (per foot)$4.00 New Service Frost Trenching (per foot)$5.00 New Commercial & Industrial Electric Connection 50% Service Upgrades or Additions for Existing Customers 100% Minimum Temporary Electric Service Fee - Existing Transformer$220.00 Minimum Temporary Electric Service Fee - Without Existing Transformer$850.00 Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture$2,700.00 Street Light - 23' Decorative Pole with Cobra Fixture$1,800.00 Street Light - 14' Decorative Pole with Cobra Fixture$4,100.00 Street Light - 14' Decorative Pole with Acorn Fixture$5,300.00 Security Light - Wood Pole with Fixture$975.00 Security Light - Existing Pole$125.00 Pole Attachment Fee (per pole)$6.50 Manual Meter Reading Fee (per month)$10.00 Meter Installation Fee (per individually metered apartment unit)$20.00 WATER Water Access Charge = Water Connection Charge + Water Availability Charge$3,990.00 Water Connection Charge (Per Plumbing Unit) - Builder$3,600.00 Water Availability Charge (Per Plumbing Unit) - Developer$390.00 Abandoned Water Service$2,500.00 Backflow Preventer Device Non-Compliance (per month)$100.00 Deposit for 5/8" Hydrant Meter$150.00 Deposit for 2 1/2" Hydrant Meter$1,000.00 Hydrant Water Sales - Rental (per week)$50.00 Hydrant Water Sales - Units (per 1000 gallons)$4.00 Hydrant Wrench$40.00 Manual Meter Reading Fee (per month)$10.00 Private Hydrant Maintenance Program Monthly Fee$5.00 ADMINISTRATIVE Administrative Fee for Continued Submission of Checks After No-Check Notice Given$20.00 Billable Cost of Materials Markup 15% Billable Labor Markup 55% Billable Vehicle / Equipment (per employee per hour)$30.00 Commerical Application Fee$20.00 Electric Service Disconnect/Trip Fee - Meter Technician $50.00 Electric Service Disconnect/Trip Fee - Line Crew$150.00 Water Service Disconnect/Trip Fee - Water Operator$100.00 Meter Tampering Fee$250.00 Meter Testing Fee$50.00 NSF Fee$20.00 Penalty Amount 10% Photocopies (per page)$0.25 Red Tag Handling Fee$20.00 Adopted by the Utilities Commission on November 9, 2021, under authority per Minnesota Statute 412.361 110