4.7 SR 02-07-2022it ci Elk* River Mequest for Action To Item Number Mayor and Ci Council 4.7 Agenda Section Meeting Date Prepared by Consent February 7, 2022 Ryan Sandhoefner, Engineer 1 Item Description Reviewed by Pay Estimate Correction Justin Femrite P.E., Public Works Director Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the pay estimate detailed below. Background/Discussion The following pay estimate has been reviewed and found to be accurate and in accordance with approved contracts. The pay estimate on the January 18, 2022, agenda included this pay request, but the amount was incorrect and was not paid. This number has been updated and will be the final payment for this contract. Financial Impact PROJECT Pay Est. # Contractor 2021 Street Improvements 7 — Final North Valley, Inc Mission/Policy/Goal Opportunity to live, work, and play. Attachments ■ Pay Estimate 7 — North Valley, Inc. Amount $84,272.58 The Elk River Vision P O I E R E U s Y A welcoming community with revolutionary and spirited resourcefulness, exceptional [NATURE] service, and community engagement that encourages and inspires prosperity. Updated. August 2020 Contractor's Application for Final Payment Owner: City of Elk River Owner's Project No.: R13.121582 Engineer: Jason W. Cook, P.E. Engineer's Project No.: R13.121582 Contractor: North Valley Inc. Other Project No.: Project: 2021 Street Improvements Contract: Application No.: 7 - Final Application Date: 11/30/2021 Application Period: From 10/13/2021 to 11/30/2021 1. Original Contract Price $ 4,764,032.23 2. Net change by Change Orders $ 588,309.33 3. Current Contract Price (Line 1 + Line 2) $ 5,352,341.56 4. Total Work completed and materials stored to date (Sum of Column G Lump Sum Total and Column 1 Unit Price Total) $ 5,080,283.29 5. Retainage a. 0% X $ 5,080,283.29 Work Completed $ - b. X $ - Stored Materials $ c. Total Retainage (Line 5.a + Line 5.b) $ 6. Amount eligible to date (Line 4 - Line 5.c) $ 5,080,283.29 7. Less previous payments (Line 6 from prior application) $ 4,996,010.71 8. Amount due this application $ 84,272.58 Contractor's Certification The undersigned Contractor certifies, to the best of its knowledge, the following: (1) All previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by prior Applications for Payment; (2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens, security interest, or encumbrances); and (3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective; and (4) The provisions of M. S. 290.92 have been complied with and that all claims against me by reason of the Contract have been paid or satisfactorily secured. Contractor: North Valley, In Signature: Date: 1 /25/2022 Name: Leslie A. Bloom Title: President Recommended by Engineer Approved by Owner By: Imo^^ �✓l— By: Name: Jason W. Cook, PE Name: Title: Project Manager, Bolton & Menk Inc Title: Chief Engineer Date: 1/26/2022 Date: _ _1- 2 8 - 2 2 CODE: 401-4-8080-4530 EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. Contractor's Application for Final Payment Owner: City of Elk River Owner's Project No.: R13.121582 Engineer: Jason W. Cook, P.E. Engineer's Project No.: R13.121582 Contractor: North Valley Inc. Contractor's Project No.: Project: 2021 Street Improvements Contract: Application No.: 7 - Final Application Period: From 10/30/21 to 11/30/21 Application Date: 11/30/21 A B C D E F G H I J K L Bid Item No. Description Contract Information Work Completed Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + 1) ($) %of Value of Item (J / F) (%) Difference from Bid (F -J) ($) Item quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Estimated quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) Original Contract 1 MOBILIZATION 1.00 LUMP SUM 177,588.57 177,588.57 1.00 177,588.57 177,588.57 100% 2 CLEARING 8.00 TREE 374.51 2,996.08 17.00 6,366.67 6,366.67 213% (3,370.59) 3 GRUBBING 8.00 TREE 535.01 4,280.08 17.00 9,095.17 9,095.17 213% (4,815.09) 4 REMOVE MANHOLE 2.00 EACH 948.78 1,897.56 2.00 1,897.56 1,897.56 100% 5 ABANDON MANHOLE 4.00 EACH 457.25 1,829.00 4.00 1,829.00 1,829.00 100% 6 REMOVE CURB & GUTTER 4,498.00 LIN FT 7.05 31,710.90 5,128.00 36,152.40 36,152.40 114% (4,441.50) 7 REMOVE BITUMINOUS CURB 3,103.00 LIN FT 2.50 7,757.50 3,614.00 9,035.00 9,035.00 116% (1,277.50) 8 REMOVE PIPE SEWERS 60.00 LIN FT 25.72 1,543.20 60.00 1,543.20 1,543.20 100% 9 REMOVE BITUMINOUS PAVEMENT 63,055.00 SO YD 1.58 99,626.90 63,402.00 100,175.16 100,175.16 101% (548.26) 10 REMOVE CONCRETE PAVEMENT 31,147.00 SO FT 1.05 32,704.35 22,131.00 23,237.55 23,237.55 71% 9,466.80 11 RELOCATE SPRINKLER SYSTEM (PER HEAD) 71.00 EACH 53.50 3,798.50 117.00 6,259.50 6,259.50 165% (2,461.00) 12 COMMON EXCAVATION (P) 5,455.00 CU YD 15.41 84,061.55 5,495.00 84,677.95 84,677.95 101% (616.40) 13 SUBGRADE EXCAVATION (EV) 800.00 CU YD 23.29 18,632.00 1,862.03 43,366.68 43,366.68 233% (24,734.68) 14 SELECT GRANULAR BORROW (CV) 800.00 CU YD 25.94 20,752.00 1,646.00 42,697.24 42,697.24 206% (21,945.24) 15 SALVAGED AGGREGATE FROM STOCKPILE (CV) 864.00 CU YD 19.35 16,718.40 1,112.00 21,517.20 21,517.20 129% (4,798.80) 16 AGGREGATE SURFACING (CV) CLASS 2 131.00 CU YD 74.96 9,819.76 164.27 12,313.68 12,313.68 125% (2,493.92) 17 FULL DEPTH RECLAMATION (9.5") 4,917.00 SO YD 1.67 8,211.39 4,985.00 8,324.95 8,324.95 101% (113.56) 18 FULL DEPTH RECLAMATION (12") 33,844.00 SO YD 1.70 57,534.80 32,000.00 54,400.00 54,400.00 95% 3,134.80 19 BITUMINOUS PATCH SPECIAL (DRIVEWAY/TRAIL) 1,299.00 SO YD 38.58 50,115.42 1,552.00 59,876.16 59,876.16 119% (9,760.74) 20 BITUMINOUS PATCH SPECIAL (STREET) 5,091.00 SO YD 32.81 167,035.71 3,914.19 128,424.57 128,424.57 77% 38,611.14 21 MILL BITUMINOUS SURFACE (TAPER 1.25" -0") 81,135.00 LIN FT 0.77 62,473.95 76,737.00 59,087.49 59,087.49 95% 3,386.46 22 MILL BITUMINOUS SURFACE (1.5") 5,237.00 SO YD 1.25 6,546.25 28,764.00 35,955.00 35,955.00 549% (29,408.75) 23 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) 16,784.00 TON 58.58 983,206.72 14,891.51 872,344.66 872,344.66 89% 110,862.06 24 TYPE SP 9.5 WEARING COURSE MIXTURE (4,F) 16,423.00 TON 65.43 1,074,556.89 14,166.46 926,911.48 926,911.48 86% 147,645.41 25 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) 4,684.00 TON 56.47 264,505.48 4,521.37 255,321.76 255,321.76 97% 9,183.72 26 TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,C) 9,401.00 TON 58.83 553,060.83 8,715.73 512,746.40 512,746.40 93% 40,314.43 27 CONCRETE FLUME 3.00 EACH 642.01 1,926.03 3.00 1,926.03 1,926.03 100% 28 18" RC PIPE SEWER CLASS V 60.00 LIN FT 97.16 5,829.60 60.00 5,829.60 5,829.60 100% 29 CONNECTTO EXISTING STORM SEWER 2.00 EACH 897.35 1,794.70 2.00 1,794.70 1,794.70 100% 30 CONNECTTO EXISTING SANITARY SEWER 4.00 EACH 1,286.00 5,144.00 4.00 5,144.00 5,144.00 100% 31 FILL&ABANDON PIPE 1,055.00 LIN FT 10.86 11,457.30 1,055.00 11,457.30 11,457.30 100% 32 8" PIPE SEWER -DIRECTIONAL DRILLED 731.00 LIN FT 91.45 66,849.95 691.00 63,191.95 63,191.95 95% 3,658.00 33 ADJUSTVALVE BOX 76.00 EACH 124.74 9,480.24 71.00 8,856.54 8,856.54 93% 623.70 34 ADJUST FRAME & RING CASTING 196.00 EACH 500.62 98,121.52 197.00 98,622.14 98,622.14 101% (500.62) 35 CASTING ASSEMBLY 20.00 EACH 588.51 11,770.20 23.00 13,535.73 13,535.73 115% (1,765.53) 36 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4007 47.40 LIN FT 554.41 26,279.03 47.40 26,279.03 26,279.03 100% 37 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 4.001 LIN FT 645.86 2,583.44 4.00 2,583.44 2,583.44 100% 38 CONSTRUCT8" OUTSIDE DROP 3.70 LIN FT 988.79 3,658.52 3.70 3,658.52 3,658.52 100% 39 4" CONCRETE WALK 8,796.00 SO FT 5.89 51,808.44 8,440.00 49,711.60 49,711.60 96% 2,096.84 40 7" CONCRETE WALK 14,712.00 SO FT 7.49 110,192.88 10,242.00 76,712.58 76,712.58 70% 33,480.30 41 7" CONCRETE DRIVEWAY PAVEMENT 4,913.00 SO FT 7.49 36,798.37 4,080.76 30,564.89 30,564.89 83% 6,233.48 42 CONCRETE CURB & GUTTER DESIGN B412 1,945.00 LIN FT 16.05 31,217.25 1,853.00 29,740.65 29,740.65 95% 1,476.60 43 CONCRETE CURB & GUTTER DESIGN B618 3,804.00 LIN FT 27.82 105,827.28 3,589.00 99,845.98 99,845.98 94% 5,981.30 44 CONCRETE CURB & GUTTER DESIGN SPECIAL 744.00 LIN FT 27.82 20,698.08 420.00 11,684.40 11,684.40 56% 9,013.68 45 7" CONCRETE VALLEY GUTTER 2,726.00 SO FT 7.49 20,417.74 524.00 3,924.76 3,924.761 19%1 16,492.98 46 TRUNCATED DOMES 1,722.00 SO FT 107.00 184,254.00 1,101.00 117,807.00 117,807.00 64% 66,447.00 47 BITUMINOUS CURB 3,103.00 LIN FT 3.75 11,636.25 3,614.00 13,552.50 13,552.50 .6% (1,916.25) 48 RELOCATE MAILBOX 14.00 EACH 133.75 1,872.50 12.001 1,605.00 1 1,605.00 86%1 267.50 49 LOOP DETECTOR DESIGN NMC 34.00 EACH 1,063.73 36,166.82 34.901 37,124.18 1 37,124.18 103% (957.36) EJCDC C-620 Contractor's Application for Payment Unit Price (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 1 of 4 Contractor's Application for Final Payment Owner: City of Elk River Owner's Project No.: R13.121582 Engineer: Jason W. Cook, P.E. Engineer's Project No.: R13.121582 Contractor: North Valley Inc. Contractor's Project No.: Project: 2021 Street Improvements Contract: Application No.: 7 - Final Application Period: From 10/30/21 to 11/30/21 Application Date: 11/30/21 A B C D E F G H I J K L Bid Item No. Description Contract Information Work Completed Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + 1) ($) %of Value of Item (J / F) (%) Difference from Bid (F -J) ($) Item quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Estimated quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) 50 ITRAFFIC CONTROL 1.00 LUMP SUM 15,515.34 15,515.34 1.00 15,515.34 15,515.34 100% 51 SIGN PANELS TYPE C 30.00 SO FT 53.50 1,605.00 34.00 1,819.00 1,819.00 113% (214.00) 52 RELOCATE SIGN 2.00 EACH 160.50 321.00 9.00 1,444.50 1,444.50 450% (1,123.50) 53 STABILIZED CONSTRUCTION EXIT 8.00 LUMP SUM 535.01 4,280.08 5.00 2,675.05 2,675.05 63% 1,605.03 54 STORM DRAIN INLET PROTECTION 85.00 EACH 101.65 8,640.25 189.00 19,211.85 19,211.85 222% (10,571.60) 55 SILT FENCE, TYPE MS 780.00 LIN FT 3.74 2,917.20 808.00 3,021.92 3,021.92 104% (104.72) 56 COMMON TOPSOIL BORROW (LV) 1,273.00 CU YD 37.45 47,673.85 1,568.00 58,721.60 58,721.60 123% (11,047.75) 57 FERTILIZER TYPE 3 1,095.00 POUND 1.00 1,095.00 1,000.00 1,000.00 1,000.00 91% 95.00 58 SEEDING 3.20 ACRE 871.88 2,790.02 4.90 4,272.21 4,272.21 153% (1,482.19) 59 SEED MIXTURE 25-151 566.00 POUND 7.72 4,369.52 1,019.501 7,870.54 7,870.54 180% (3,501.02) 60 HYDRAULIC BONDED FIBER MATRIX 10,920.00 POUND 1.67 18,236.40 12,097.00 20,201.99 20,201.99 111% (1,965.59) 61 LANDSCAPE ROCK 39.00 CU YD 80.25 3,129.75 29.00 2,327.25 2,327.25 74% 802.50 62 4"SOLID LINE MULTI-COMPONENT(WHITE) 17,825.00 LIN FT 0.27 4,812.75 17,962.00 4,849.74 4,849.74 101% (36.99) 63 4" SOLID LINE MULTI -COMPONENT (YELLOW) 6,105.00 LIN FT 0.27 1,648.35 6,561.00 1,771.47 1,771.47 107% (123.12) 64 24"SOLID LINE MULTI-COMPONENT(WHITE) 678.00 LIN FT 7.56 5,125.68 733.50 5,545.26 5,545.26 108% (419.58) 65 4" BROKEN LINE MULTI -COMPONENT (WHITE) 5,470.00 LIN FT 0.27 1,476.90 5,600.00 1,512.00 1,512.00 102% (35.10) 66 4" BROKEN LINE MULTI -COMPONENT (YELLOW) 2,279.00 1 LIN FT 0.27 615.33 2,691.00 726.57 726.57 118% (111.24) 67 4" DOUBLE SOLID LINE MULTI -COMPONENT (YELLOW) 11,457.00 LIN FT 0.54 6,186.78 10,548.00 5,695.92 5,695.92 92% 490.86 68 CROSS WALK MULTI-COMPON ENT (WHITE) 5,434.00 SQ FT 4.65 25,268.10 4,422.00 20,562.30 20,562.30 81% 4,705.80 69 IPAVEMENT MESSAGE MULTI -COMPONENT 1,525.00 SO FT 6.28 9,577.00 1,493.001 9,376.04 9,376.04 98% 200.96 Original Contract Totalsl $ 4,764,032.23 1 1 $ 4,394,418.07 $ $ 4,394,418.07 92% $ 369,614.16 Change Orders CO-1.1.1 MOBILIZATION 1.00 LUMP SUM 19,000.00 19,000.00 1.00 19,000.00 19,000.00 100% CO-1.1.2 REMOVE GATE VALVE & BOX 1.00 EACH 3,465.00 3,465.00 1.00 3,465.00 3,465.00 100% CO-1.1.3 10" PIPE PLUG 1.00 EACH 550.00 550.00 1.00 550.00 550.00 100% CO-1.1.4 REMOVE AND REPLACE VALVE BOX 21.00 EACH 2,134.00 44,814.00 24.00 51,216.00 51,216.00 114% (6,402.00) CO-1.1.5 ADJUSTVALVE BOX (22.00) EACH 124.74 (2,744.28) (2,744.28) CO-1.1.6 SEAL DRAINAGE STRUCTURE (CATCH BASIN CHIMNEY SEAL) 14.00 EACH 400.00 5,600.00 23.00 9,200.00 9,200.00 164% (3,600.00) CO-1.1.7 SEALDRAINAGE STRUCTURE (MANHOLE CHIMNEY SEAL) 9.00 EACH 400.00 3,600.00 71.00 28,400.00 28,400.00 789% (24,800.00) CO-11.8 EXTERIOR PIPE GROUT REPAIR 1 1.001 EACH 850.00 850.00 4.00 3,400.00 3,400.00 400% (2,550.00) CO-1.2.1 MOBILIZATION 1.00 LUMP SUM 18,963.00 18,963.00 1.00 18,963.00 18,963.00 100% - CO-1.2.2 CLEARING 0.10 ACRE 10,000.00 1,000.00 0.10 1,000.00 1,000.00 100% CO-1.2.3 GRUBBING 0.10 ACRE 10,000.00 1,000.00 0.10 1,000.00 1,000.00 100% CO-1.2.4 REMOVE CURB AND GUTTER 35.00 LIN FT 7.05 246.75 205.00 1,445.25 1,445.25 586% (1,198.50) CO-1.2.5 COMMON EXCAVATION (P) 400.00 CU YD 15.41 6,164.00 400.00 6,164.00 6,164.00 100% CO-1.2.6 SUBGRADE EXCAVATION (EV) 75.00 CU YD 23.29 1,746.75 134.40 3,130.18 3,130.18 179% (1,383.43) CO-1.2.7 SELECT GRANULAR BORROW (CV) 75.00 CU YD 25.94 1,945.50 1,945.50 CO-1.2.8 SALVAGED AGGREGATE FROM STOCKPILE (CV) 305.00 CU YD 19.35 5,901.75 622.00 12,035.70 12,035.70 204% (6,133.95) CO-1.2.9 AGGREGATE SURFACING CLASS 2 15.00 CU YD 74.96 1,124.40 1,124.40 CO-1.2.10 BITUMINOUS PATCH SPECIAL (DRIVEWAY/TRAIL) 15.00 SO YD 38.58 578.70 101.00 3,896.58 3,896.58 673% (3,317.88) CO-1.2.11 BITUMINOUS PATCH SPECIAL (STREET) 132.00 SO YD 32.81 4,330.92 176.00 5,774.56 5,774.56 133% (1,443.64) CO-1.2.12 M I LL BITU M I NOU S SU RFACE(1.5") 3,150.00 SO YD 1.25 3,937.50 3,120.00 3,900.00 3,900.00 99% 37.50 CO-1.2.13 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) 763.00 TON 75.85 57,873.55 833.50 63,220.98 63,220.98 109% (5,347.43) CO-1.2.14 7" CONCRETE WALK 100.00 SO FT 7.49 749.00 78.00 584.22 584.22 78% 164.78 CO-1.2.15 CONCRETE CURB & GUTTER DESIGN B612 35.00 LIN FT 27.50 962.50 205.00 5,637.50 5,637.50 586% (4,675.00) CO-1.2.16 TRAFFIC CONTROL 1.00 LUMP MP SUM 825.00 825.00 1.00 825.00 825.00 100% - CO-1.2.17 SIGN PANELS TYPE C 2.70 1 SO FT 53.50 144.45 144.45 CO-1.2.18 RELOCATE SIGN 5.001 EACH 1 160.50 1 802.50 1 - i - i i - i 1 802.50 EJCDC C-620 Contractor's Application for Payment Unit Price (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 2 of 4 Contractor's Application for Final Payment Owner: City of Elk River Owner's Project No.: R13.121582 Engineer: Jason W. Cook, P.E. Engineer's Project No.: R13.121582 Contractor: North Valley Inc. Contractor's Project No.: Project: 2021 Street Improvements Contract: Application No.: 7 - Final Application Period: From 10/30/21 to 11/30/21 Application Date: 11/30/21 A B C D E F G H I J K L Bid Item No. Description _ Contract Information Work Completed Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + 1) ($) %of Value of Item (J / F) (%) Difference from Bid (F -J) ($) Item Quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Estimated Quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) CO-1.2.19 ISTORM DRAIN INLET PROTECTION 1.00 EACH 101.65 101.65 - - - 101.65 CO-1.2.20 SILT FENCE, TYPE MS 300.00 LIN FT 3.74 1,122.00 1,122.00 CO-1.2.21 COMMON TOPSOIL BORROW (LV) 365.00 CU YD 37.45 13,669.25 567.00 21,234.15 21,234.15 155% (7,564.90) CO-1.2.22 FERTILIZER TYPE 3 240.00 POUND 1.00 240.00 76.00 76.00 76.00 32% 164.00 CO-1.2.23 SEEDING 0.80 ACRE 871.88 697.50 0.48 418.50 418.50 60% 279.00 CO-1.2.24 SEED MIXTURE 25-151 144.00 POUND 7.72 1,111.68 178.00 1,374.16 1,374.16 124% (262.48) CO-1.2.25 HYDRAULIC BONDED FIBER MATRIX 2,800.00 POUND 1.67 4,676.00 2,955.00 4,934.85 4,934.85 106% (258.85) CO-1.2.26 4"SOLID LINE MULTI-COMPONENT(WHITE) 1,900.00 LIN FT 0.27 513.00 1,525.00 411.75 411.75 801 101.25 CO-1.2.27 PAVEMENT MESSAGE MULTI -COMPONENT 14.00 SO FT 6.28 87.92 14.00 87.92 87.92 100% CO-1.3.1 REMOVE SIGN 1.00 EACH 82.50 82.50 1.00 82.50 82.50 100% - CO-1.3.2 SALVAGE CASTING 6.00 EACH 285.00 1,710.00 4.00 1,140.00 1,140.00 67% 570.00 CO-1.3.3 REMOVE CURB & GUTTER 675.00 LIN FT 7.05 4,758.75 1,577.00 11,117.85 11,117.85 234% (6,359.10) CO-1.3.4 REMOVE CONCRETE PAVEMENT 410.00 SO FT 1.05 430.50 2,597.00 2,726.85 2,726.85 633% (2,296.35) CO-1.3.5 REMOVE CONCRETE NOSE 200.00 SO FT 8.50 1,700.00 90.00 765.00 765.00 45% 935.00 CO-1.3.6 TYPE SP 9.5 WEARING COURSE MIXTURE (4,F) (203.00) TON 65.43 (13,282.29) (13,282.29) CO-1.3.7 TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,C) (127.00) TON 58.83 (7,471.41) (7,471.41) CO-1.3.8 CONNECTTO EXISTING STORM SEWER 3.00 EACH 897.35 2,692.05 3.00 2,692.05 2,692.05 100% CO-1.3.9 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 11.40 LIN FT 1,072.50 12,226.50 11.00 11,797.50 11,797.50 96% 429.00 CO-1.3.10 CASTING ASSEMBLY (STORM MANHOLE) 3.00 EACH 951.50 2,854.50 3.00 2,854.50 2,854.50 100% CO-1.3.11 CASTING ASSEMBLY(SALVAGED STORM MANHOLE) 1.00 EACH 835.00 835.00 1.00 835.00 835.00 100% CO-1.3.12 CASTING ASSEMBLY(SALVAGED CATCH BASIN) 4.00 EACH 745.00 2,980.00 4.00 2,980.00 2,980.00 100% CO-1.3.13 4" CONCRETE WALK 3,035.00 SO FT 5.89 17,876.15 4,053.00 23,872.17 23,872.17 134% (5,996.02) CO-1.3.14 CONCRETE CURB & GUTTER DESIGN B618 870.00 LIN FT 27.87 24,246.90 657.00 18,310.59 18,310.59 76% 5,936.31 CO-1.3.15 CONCRETE MEDIAN NOSE -SPECIAL 125.00 SO FT 15.00 1,875.00 60.00 900.00 900.00 48% 975.00 CO-1.3.16 COMMON TOPSOIL BORROW (LV) 160.00 CU YD 37.45 5,992.00 32.001 1,198.40 1,198.40 20% 4,793.60 CO-1.3.17 FERTILIZER TYPE 3 45.00 POUND 1.00 45.00 30.00 30.00 30.00 67% 15.00 CO-1.3.18 SEEDING 0.15 ACRE 871.88 130.78 0.15 130.78 130.78 100% CO-1.3.19 SEED MIXTURE 25-151 27.00 POUND 7.72 208.44 27.00 208.44 208.44 100% CO-1.3.20 HYDRAULIC BONDED FIBER MATRIX 525.00 POUND 1.67 876.75 876.75 CO-1.3.21 4"SOLID LINE MULTI-COMPONENT(WHITE) (290.00) LIN FT 0.27 (78.30) (78.30) CO-1.3.22 PAVEMENT MESSAGE MULTI -COMPONENT (30.00) SO FT 6.28 (188.40) (188.40) CO-2.1.1 MOBILIZATION 1.00 LUMP SUM 57,098.70 57,098.70 1.00 57,098.70 57,098.70 100% CO-2.1.2 GEOTEXTILE FABRIC TYPE S 2,835.00 SQYD 3.95 11,198.25 3,457.00 13,655.15 13,655.15 122% (2,456.90) CO-2.1.3 COMMON EXCAVATION (P) (EV) 630.00 CU YD 15.41 9,708.30 998.00 15,379.18 15,379.18 158% (5,670.88) CO-2.1.4 SALVAGED AGGREGATE FROM STOCKPILE (CV) 630.00 CU YD 19.35 12,190.50 714.00 13,815.90 13,815.90 113% (1,625.40) CO-2.1.5 FULL DEPTH RECLAMATION (8") 5,000.00 SQYD 4.21 21,050.00 4,917.00 20,700.57 20,700.57 98% 349.43 CO-2.1.6 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) 735.00 TON 58.58 43,056.30 787.97 46,159.28 46,159.28 107% (3,102.98) CO-2.1.7 TRAFFIC CONTROL 1.00 LUMP SUM 974.52 974.52 1.00 974.52 974.52 100% CO-2.1.8 STORM DRAIN INLET PROTECTION 6.00 EACH 101.65 609.90 - - - 609.90 CO-2.1.9 SILT FENCE, TYPE MS 2,675.00 LIN FT 3.74 10,004.50 1,935.56 7,238.99 7,238.99 72% 2,765.51 CO-2.1.10 COMMON TOPSOIL BORROW (LV) 160.00 CU YD 53.25 8,520.00 240.00 12,780.00 12,780.00 150% (4,260.00) CO-2.1.11 FERTILIZER TYPE 3 120.00 POUND 1.00 120.00 240.00 240.00 240.00 200% (120.00) CO-2.1.12 SEEDING 0.40 ACRE 871.88 348.75 0.96 837.00 837.00 240% (488.25) CO-2.1.13 SEED MIXTURE 25-151 48.00 POUND 7.72 370.56 125.00 965.00 965.00 260% (594.44) CO-2.1.14 HYDRALUIC BONDED FIBER MATRIX 1,600.00 POUND 1.67 2,672.00 3,360.00 5,611.20 5,611.20 210% (2,939.20) CO-2.2.1 MOBILIZATION 1.00 LUMP SUM 33,154.00 33,154.00 1.00 33,154.00 33,154.00 100% - CO-2.2.2 REMOVE CURB & GUTTER 670.00 LIN FT 7.05 4,723.50 550.00 3,877.50 3,877.50 82% 846.00 CO-2.2.3 REMOVE CONCRETE PAVEMENT 2,000.00 SQ FT 1.05 2,100.00 1,516.00 1,591.80 1,591.80 7691. 508.20 CO-2.2.4 IRELOCATE SPRINKLER SYSTEM (PER HEAD) 1 5.001 EACH 1 53.50 1 267.50 1 7.001 374.50 1 1 374.50 140% (107.00) EJCDC C-620 Contractor's Application for Payment Unit Price (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 3 of 4 Contractor's Application for Final Payment Owner: City of Elk River Owner's Project No.: R13.121582 Engineer: Jason W. Cook, P.E. Engineer's Project No.: R13.121582 Contractor: North Valley Inc. Contractor's Project No.: Project: 2021 Street Improvements Contract: Application No.: 7 - Final Application Period: From 10/30/21 to 11/30/21 Application Date: 11/30/21 A B C D E F G H I J K L Bid Item No. Description Contract Information Work Completed Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + 1) ($) %of Value of Item (J / F) N Difference from Bid (F -J) ($) Item Quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Estimated Quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) CO-2.2.5 BITUMINOUS PATCH SPECIAL (STREET) 35.00 SQYD 32.81 1,148.35 307.00 10,072.67 1 10,072.67 877% (8,924.32) CO-2.2.6 MILL BITUMINOUS SURFACE (1.5") 7,680.00 SQYD 1.25 9,600.00 7,840.00 9,800.00 9,800.00 102% (200.00) CO-2.2.7 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) 680.00 TON 58.58 39,834.40 676.91 39,653.39 39,653.39 100% 181.01 CO-2.2.8 4" CONCRETE WALK 1,530.00 SO FT 5.89 9,011.70 1,445.00 8,511.05 8,511.05 94% 500.65 CO-2.2.9 7" CONCRETE WALK 480.00 SO FT 7.49 3,595.20 343.00 2,569.07 2,569.07 71% 1,026.13 CO-2.2.10 CONCRETE CURB & GUTTER DESIGN B618 670.00 LIN FT 27.82 18,639.40 550.00 15,301.00 15,301.00 82% 3,338.40 CO-2.2.11 7" CONCRETE VALLEYGUTTER 300.00 SO FT 7.49 2,247.00 100.00 749.00 749.00 33% 1,498.00 CO-2.2.12 TRUNCATED DOMES 70.00 SO FT 107.00 7,490.00 47.39 5,070.73 5,070.73 68% 2,419.27 CO-2.2.13 TRAFFIC CONTROL 1.00 LUMP SUM 1,515.91 1,515.91 1.001 1,515.91 1,515.91 100% CO-2.2.14 COMMON TOPSOIL BORROW (LV) 200.00 CU YD 37.45 7,490.00 61.00 2,284.45 2,284.45 31% 5,205.55 CO-2.2.15 FERTILIZER TYPE 3 75.00 POUND 1.00 75.00 45.00 45.00 45.00 60% 30.00 CO-2.2.16 SEEDING 0.20 ACRE 871.88 174.38 0.10 87.19 87.19 50% 87.19 CO-2.2.17 SEED MIXTURE 25-151 15.00 POUND 7.72 115.80 15.00 115.80 115.80 100% CO-2.2.18 HYDRALUIC BONDED FIBER MATRIX 400.00 POUND 1.67 668.00 115.00 192.05 192.05 29% 475.95 CO-2.2.19 4" SOLID LINE MULTI-COMPONENET(WHITE) 2,210.00 LIN FT 0.27 596.70 2,353.00 635.31 635.31 106% (38.61) CO-2.2.20 4" SOLID LINE MULTI-COMPONENET(YELLOW) 2,090.00 LIN FT 0.27 564.30 2,136.00 576.72 576.72 102% (12.42) CO-2.2.21 4" BROKEN LINE MULTI -COMPONENT (YELLOW) 450.00 LIN FT 0.27 121.50 420.00 113.40 113.40 93% 8.10 CO-2.2.22 4" DOUBLE SOLID LINE MULTI -COMPONENT (YELLOW) 300.00 LIN FT 0.54 162.00 300.00 162.00 162.00 100% CO-2.2.23 PAVEMENT MESSAGE MULTI -COMPONENT 150.00 SO FT 6.28 942.00 154.50 970.26 970.26 103% (28.26) Change Order Totalsl $ 588,309.33 1 $ 685,865.22 $ $ 685,865.22 117% $ (97,555.89) Original Contract and Change Orders Project Totals $ 5,352,341.56 1 $ 5,080,283.29 $ $ 5,080,283.29 1 95% $ 272,058.27 EJCDC C-620 Contractor's Application for Payment Unit Price (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 4 of 4