Loading...
4.9 SR 02-07-2022it ci Elk* River Request for Action To Item Number Mayor and Ci Council 4.9 Agenda Section Meeting Date Prepared by Consent February 7, 2022 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Change Orders for Youth Athletic Complex Cal Portner, City Administrator and Orono Park Reviewed by Action Requested Adopt, by motion, the change orders for the Youth Athletic Association (YAC) and Orono Park projects. Background/Discussion The change order for the Orono Park project is $3,500 to increase the thickness of the restroom building exterior concrete from four to six inches. The change order for YAC of $1,333 is to install a 1.5-inch pressure reducing valve for the restroom building. The irrigation system needs to be at 80 psi and the restroom building, by code, needs to be less than 80 psi. Financial Impact The total contingency approved by City Council for both the YAC and Orono Park projects is $240,128. The total costs for change orders City Council recently approved through December 2021 is $158,553.58. The change orders for 2022 YTD is $4,833. Mission/Policy/Goal Opportunity to live work and play. Attachments ■ Change Order Descriptions for Orono Park and YAC The Elk River Vision A n elcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. P I I E I 1 0 IY NATURE Updated. August 2020 Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Minnesota 55422 Ph. 800-622-5425 763-546-7787 Fax 763-546-5050 tim@mnWplay.com 10/24/2021 Quote #101903-01-04 City of Elk River- Orono Park Shelter- Change Order- Add'I Concrete City of Elk River Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhecker@elkrivermn.gov Add'I Other - Increase thickness of exterior concrete from 4"t to 6"t for our original scope of work to Concrete match/comply with the site design for the entire Orono Park Site Improvemmts Comments Ship to Zip 55330 $3,600.00 $3,500.00 Sub Total $3,500.00 Increase thickness of exterior concrete from 4"t to 6"t for our original scope of work to match/comply with the site design for the entire Orono Park Site Improvemmts. This quotation is subject to current MinnesotaAArisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wsconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Owner's Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; acceptance of equipment and off-loading; storage of goods prior to installation; equipment assembly and installation; safety surfacing; borders and drainage provisions. Page 1 of 2 Nd)w Minnesota / Wisconsin Playground 01/24/2022 5101 Highway 55, Suite 6000 Quote #102073-01-02 Golden Valley, Minnesota 55422 Ph.800-622-5425763-546-7787 Fax 763-546-5050 tim@mnwiplay.com CONSULTANT. TIM NEWGARD YAP, City of Elk River- Change Order-1.5 inch pressure reducing valve City of Elk River Ship to Zip 55330 Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone: 763-635-1150 mhecker@elkrivermn.gov Quantity 1 1.5 inch pressure reducing valve Other - Supply the 1.5 inch pressure reducing valve $728.00 $728.00 1 Fittings Other - Supply fittings for the pressure valve $130.00 $130.00 Sub Total $858.00 _ This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Owner's Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Pricing: f.o.b. factory, firm for 15 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at time of order entry. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Freight charges: Prepaid & added Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing obstructions/equipment; acceptance of product and off-loading; storage of goods prior to installation; product assembly and installation; concrete work of any type and drainage provisions. Page 1 of 2 fu Minnesota / Wisconsin Playground 01/24/2022 5101 Highway 55, Suite 6000 Quote #102073-01-03 Golden Valley, Minnesota 55422 Ph. 800-622-5425 763-546-7787 Fax 763-546-5050 tim@mnwiplay.com CONSULTANT. TIM NEWGARD YAC, City of Elk River- Change Order-1.5 inch pressure reducing valve - Installation City of Elk River Ship to Zip 55330 Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 Phone:763-635-1150 mhecker@elkdvermn.gov INSTALL Other - Installation of 1.5 inch pressure reducing valve $475.00 $475.00 Sub Total $475.00 Total $475.00, This quotation is subject to current Minnesota/Wsconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to MinnesotalWsconsin Playground. Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions of this quotation shall be as outlined herein with no other requirements applicable. Indemnification; Owner/Owner's Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owners Representative's negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance with any of its commitments under this document. Pricing: f.o.b. factory, firm for 15 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at time of order entry. Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote, credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Freight charges: Prepaid & added Page 1 of 3 Minnesota / Wisconsin Playground 5101 Highway 55, Suite 6000 Golden Valley, Minnesota 55422 Ph. 800-622-5425 763-546-7787 Fax 763-546-5050 tim@mnwiplay.com CONSULTANT. TIM NEWGARD 01 /24/2022 Quote #102073-01-03 City of Elk River- Change Order-1.5 inch pressure reducing valve - Installation the type of play event that is being played on. Activities with movement have a more dynamic play which can lead to more maintenance due to the nature of the motion but also because these types of play events tend to be more popular. Static features may require less attention during the short term and ongoing maintenance as inspections will determine frequency of maintenance needed for these events. There may be a need for scheduled lower and higher frequency inspections. - Ongoing maintenance, check manufacturer's owner's manual recommendations for maintenance and always follow these written instructions. After short term maintenance period is done and data is collected for that time period, an ongoing schedule should be implemented. The ongoing maintenance can change with age and greater use. There may be a need for scheduled lower and higher frequency inspections. Should weekend work be necessary or non-standard hours be worked, please provide a site contact and the best telephone number to reach this person in case an urgent matter arises requiring immediate attention. (Name) (Cell) (Other Telephone Number) Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing obstructions/equipment; acceptance of product and off-loading; storage of goods prior to installation; product assembly and installation; concrete work of any type and drainage provisions. Order Bill To: VOV(* Ship To: ypa, AnL-A /t�6 aor&y Company: I K4 N 7 ti AWt 11CA%7G61L4'v►. Project Name: Attn: Attn: Address: 3 lf/ D CW Address: / 97 0 City, State, Zip: K.- 1 U I(tA ' ' 54530 City, State, zip: / r►! i ' `� " ��33a Contact: I" [ I CK Yt -7'1,e dUA Contact:-70-06— 14Bl Tel: 7& 51 _05-- 1I 10t Tel: Fax: Fax: Acceptance of t i „„ j Accepted By (printed): 1 P.O. No: own Signature: __ __ I,, - Date: Title: POW-, �, i' ezi;6t/ ` Phone: v/ J Facsimile: Purchase Amount: $475.00 Page 3 of 3 ru