Loading...
6.1h ERMUSR 02-08-2022UTILITIES COMMISSION MEETING TO:FROM: ERMU Commission Mike Tietz –Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: February 8, 2022 6.1i SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In January, the locators processed 107 locate tickets. These consisted of 4 emergency tickets, 70 normal tickets, 2 non-excavation tickets, 26 updated tickets, 1 cancellation, 1 boundary survey and 3 locate meets. This resulted in a 40.6% decrease intickets from the previous month and an 21.9% decrease fromthe prior January. The locators continue to GPS and validate data for our electric GIS maps during the winter months. • Electrical technicians completed 192 service order tasks, updated the power bill, attended to customer meter issues and off-peak concerns. • On January 20, staff ran generators #1, #2, #3 & #4. Engine #3 produced considerable smoke within the power plant so I have decided to suspend its operation until further notice. It may still be used if an emergency requires it. • Mapping department experienced a setback after an unsuccessful integration with the third-party vendor software we purchased in 2021. Staff will continue to utilize our base ESRI products to provide mapping solutions for the field staff as we look for better ways to tie our databases together. • The substation apparatus technician has been getting quotes on the replacement relay panel for the West substation and investigating communication equipment for the substation. • We received a quote from a vendor to replace the damaged interior in Truck #17 for less than our insurance deductible. I am confident that this local vendor can repair the truck in a timely fashion. ______________________________________________________________________________ Page 1 of 1 108