08-23-1994 PC MIN
~~N@WE~
.
MEETING OF THE ELK RIVER PLANNING COMMISSION
HELD AT ELK RIVER CITY HALL
TUESDAY, AUGUST 23,1994
Members Present:
Chairman Tveite, Commissioners Eberley, Kreger, Kuester, and
Minton
Members Absent:
Commissioner Tacheny
Staff Present:
Steven B. Ach, City Planner, Stephen Rohlf, Building & Zoning
Administrator, Terry Maurer, City Engineer, Peter Beck, City
Attorney, Gary Schmitz, Planning Assistant, Troy Langer. Planning
Intern, Catherine Schmidt, Recording Secretary.
Pursuant to due call and notice thereof, the meeting of the Elk River Planning
Commission was called to order at 7 p.m. by Chairman Tveite.
.
COMMISSIONER MINTON MOVED TO APPROVE THE 8/23/94 PLANNING
COMMISSION AGENDA. COMMISSIONER EBERLEY SECONDED THE MOTION. THE
MOTION CARRIED 5-0.
Commissioner Minton noted that Item 3, paragraph 2 should state: Commissioner
Kreger "moved to approve" the 6/28/94 Planning Commission minutes.
COMMISSIONER MINTON MOVED TO APPROVE THE AMENDED 7/26/94 PLANNING
COMMISSION MINUTES. COMMISSIONER KUESTER SECONDED THE MOTION. THE
MOTION CARRIED 5-0.
...............................................................----------..---......................"'."."""""."...",...........................",.......,...-...........................
4.... .....................PI6hhlhd..@6ffiffiissI6H..Rebresehf6ttve16AffehdCiW..cOUH6ilMeeHh6r........
It was indicated Commissioner Kreger would attend the 9/19/94 City Council
meeting to be held at Elk River City Hall.
.
Staff report presented by Steve Rohlf. Shiely Company requested a conditional
use permit for mineral excavation and processing on approximately 200 acres.
The subject site is 1/4 mile west of Proctor Avenue, on the south side of County
Road No. 33. Mr. Rohlf stated that staff is requesting the hours of operation
remain as per City code and not be extended as Shiely Company is proposing.
.
Planning Commission Minutes ~~e 2
August 23, 1994
------------ ~ V"f!JfllfffO)
Bob Bieraugel, represenflng Shlely Company, addressed the Planning Commission U;/!;
and the public regarding the proposal, reviewed various maps of the proposed
mining area, and responded to concerns previously presented at meetings with
area residents.
Chairman Tveite opened the public hearing.
Jim Lundquist, 21244 Vernon Street, expressed concern regarding an increase in
noise from the proposal and asked staff the elevation of the railroad hiking trail.
Further, Mr. Lundquist questioned staff regarding the length of the conditional use
permit, if approved. Mr. Bieraugel responded regarding the railroad hiking trail,
Chairman Tveite responded regarding the conditional use permit.
Laura Ulman, 21498 Vernon Street, questioned staff if the proposed site would be
for sale as a landfill after the mineral excavation. Chairman Tveite and Steve
Rohlf responded. Ms. Ulman also questioned who would be maintaining County
Road No. 33 in the winter. Mr. Rohlf responded.
Jim Brandt, 12181 Ridgewood Drive, questioned the noise level on the south end
of the proposed project. Mr. Bieraugel responded.
.
Brian Hauge, 21205 Vernon Street, commented on the poor condition of County
Road No. 33 and questioned staff about future and continued upgrades if this
proposal is approved. Steve Rohlf responded. Mr. Hauge also questioned if other
trucks hauling to and from the proposed site would be regulated regarding noise
levels. Peter Beck responded regarding trucks on public roads. Mr. Hauge
iterated concerns regarding traffic safety.
Maureen Griffiths, 20760 York Street, asked staff if Barton's Sand and Gravel had a
current conditional use permit. Ms. Griffiths commented on the bad appearance
of Barton's and stated that she hoped Shiely's would not look the same. Mr.
Bieraugel responded and reviewed the proposed landscaping plan. Steve Rohlf
also responded to the perceived "bad" appearance of Barton's. Ms. Griffiths
also asked staff the possibility of this site being rezoned after the excavation is
completed. Chairman Tveite responded.
Jerry -' 426 Main Street, asked staff about water run-off away from Pintail
Pond. Terry Maurer responded.
Darrell Thompson, 20680 Watson Street, inquired about the necessary approvals
from the Sherburne County Engineer regarding County Road No. 33. Mr.
Thompson stated that before hauling is authorized, a plan to upgrade County
Road No. 33 and a recommendation should be received. Steve Rohlf responded
and referred to the letter from Sherburne County Highway Department dated
August 23, 1994. Mr. Thompson also stated that the beginning hour of operation,
7 am, is very early. Regarding the issue of hauling the stockpiled sand this year,
Mr. Thompson is very concerned about the safety of residents on County Road
No. 33. Mr. Thompson is opposed to this request.
.
Mr. Bieraugel also responded and suggested a flag person be posted along
County Road No. 33 and to help direct traffic during hours of operation.
.
Planning Commission Minutes Page 3
August 23. t994 ih
----~~~=~-n.--:::::12th Avenue. inquired about the conditional u~~1JJftJf!lJJ
process, Le., if conditions are not met who can the residents contact, what l!!J
actions are taken after notification/complaints, what is the time frame for the
"complaint" process, can this permit be revoked, etc. Steve Rohlf responded.
Mr. Whalen stated he is opposed to this proposal.
Vicki Radloff, 12781 Watson Street, asked staff to clarify the conditional use permit
process and further group meetings with Shiely Company. Commissioner Kreger
responded. Peter Beck responded regarding a conditional use permit, a license,
and revocation procedures.
Charles Blood, 12263 Ridgewood Drive, questioned who would be monitoring
wells during the excavation and asked about the tree line on the south of Shiely's
property. Mr. Bieraugel responded. Mr. Rohlf commented that approximately
fifty (50) acres of land is proposed to be donated by Shiely Company to the City.
Mr. Blood also questioned staff that if a well problem did occur, who is responsible
for costs incurred? Mr. Rohlf responded and referred to staff's report.
John Kuester, 19234 York Street, thanked Shiely Company and staff for all the
information received and knowledge gained from the neighborhood meetings.
Mr. Kuester stated that he felt confident enough checks and balances were in
place to ensure safety and consideration of area residents.
.
Rosalind Hoglund, 12846-206th Avenue, stated that she was also involved in the
neighborhood meetings with Shiely Company and iterated Mr. Kuester's
comments.
Jim Lundquist, 21244 Vernon Street, asked Shiely Company if this would be a block
plant or a cement plant, and if one was any quieter than the other. Mr. Bieraugel
responded. Mr. Lundquist also wanted to know the estimated tax revenue for the
City. Chairman Tveite responded stating the City Council hearing would be
where information regarding the economics of this issue would be discussed.
Mark Bay, 20779 York Street, asked staff if traffic associated with this proposal
could be regulated/restricted. Mr. Rohlf responded. Mr. Bay also asked about
future plans for the property north of County Road No. 33. Mr. Bieraugel
responded.
Steve Griffiths, 20760 York Street, asked the Commission about taxes generated
from this use. Chairman Tveite responded.
Jenny Dahmen, 12662 Ranch Road, questioned staff if County Road No. 33 could
be widened. Mr. Rohlf responded.
Tim Bykowski, 12767-210th Circle, iterated traffic and safety concerns on County
Road No. 33. Mr. Bykowski also mentioned upgrading the railroad bed for trail
purposes. Dave Anderson responded stating the Park & Recreation Board has
applied for a grant to do so.
.
Planning Commission Minutes Page 4
August 23, 1994
. -----=:--~~= discussion included: traffic and safetv concer~'/J@Wf~
operation; tree preservation; how much gravel is currently stockpiled and
approximately how many trucks will hauling involve; monitoring noise levels of the
operation and independent trucks; well monitoring; upcoming Steering
Committee meetings and their purpose; letter of credit; Condition # 11 (i) - add
remedial actions must be taken within 30 days; Condition # 11 (g) - change B.A.
Leisch & Associates to read City Consultant; Condition #23 (a) - add all
appropriate documents copied to the City within one week; Condition #4 -
change supervision to suspension; Condition # 1 0 - reclamation plans include
plans for future screening at future mine sites; Condition # 18 (a) - note west and
south property line regarding the noise level; current condition and future
upgrading of County Road No. 33.
Commissioner Eberley commended staff, Shiely Company, and all involved in this
process for their efforts involving this proposal.
Mr. Bieraugel commented about complaints and urged area residents to call him
immediately if any problems occur.
There being no further comments from the public, Chairman Tveite closed the
public hearing.
.
COMMISSIONER EBERLEY MOVED TO RECOMMEND APPROVAL OF THE
CONDITIONAL USE PERMIT REQUEST BY SHIEL Y COMPANY FOR MINERAL
EXCAVATION AND PROCESSING, CASE NO. CU 94-31, CITING STAFF'S REPORT AND
EXTENSIVE RESEARCH AND INFORMATION RECEIVED AT THE NEIGHBORHOOD
MEETINGS AND THE PUBLIC HEARING AS FINDING OF FACT. A PUBLIC HEARING
WAS HELD WITH SOME OPPOSITION. APPROVAL IS RECOMMENDED WITH THE
FOLLOWING CONDITIONS:
1. ALL MINERAL EXCAVATION AND PROCESSING OPERATIONS ON THE
PROPERTY SHALL COMPLY WITH THE CITY'S MINERAL EXCAVATION, ZONING
AND OTHER APPLICABLE ORDINANCES; WITH THE TERMS OF THIS
CONDITIONAL USE PERMIT AGREEMENT AND THE LICENSE AGREEMENT TO BE
EXECUTED BY THE CITY AND OPERATOR; WITH THE CITY OF ELK RIVER'S
ENVIRONMENTAL IMPACT STATEMENT ON MINERAL EXCAVATION; AND WITH
THE APPLICATION MATERIALS AND PLANS SUBMITTED BY THE OPERATOR,
WHICH PLANS AND MATERIALS ARE THE BASIS FOR THE CITY'S APPROVAL OF
THE CONDITIONAL USE PERMIT.
2. THE OPERATOR SHALL ORALLY NOTIFY THE CITY OF ANY VIOLATIONS OF THIS
PERMIT WITHIN 24 HOURS AND FOLLOW THIS WITH NOTIFICATION IN WRITING
WITHIN 4 WORKING DAYS OF THE VIOLATION. THE OPERATOR SHALL NOTIFY
THE CITY ANNUALLY IN WRITING OF THE TOTAL AREA AND AMOUNT OF
MATERIAL MINED AND PROJECTED ESTIMATES OF AREA AND AMOUNT OF
MATERIAL TO BE MINED IN THE FOLLOWING YEAR. THIS IS TO BE DONE AT
TIME OF LICENSE RENEWAL.
3.
THE LICENSE MUST BE RENEWED ANNUALLY AND SHALL RUN FROM JANUARY
1ST THROUGH DECEMBER 31ST. THE ANNUAL LICENSE FEE IS THAT WHICH IS
SPECIFIED BY CITY CODE AT TIME OF RENEWAL. THIS LICENSE FEE IS NOT IN
.
.
Planning Commission Minutes Page 5
August 23. t994 ~/!1,
-~~~-----=:~~::~=EL TAX COLLECTED BY THE COUNTY AND A po;,o'l(ffJflJlf/iiJ
WHICH THE CITY RECEIVES. If;1J!J
4. VIOLATIONS OF THIS CONDITIONAL USE PERMIT MAY RESULT IN SUSPENSION
OR REVOCATION.
5. THE CITY BUILDING AND ZONING ADMINISTRATOR AND/OR HIS/HER AGENTS
SHALL BE PERMITTED TO INSPECT THE OPERATION FOR COMPLIANCE WITH THE
CONDITIONS OF THIS PERMIT DURING NORMAL HOURS OF OPERATION.
6. THE CITY'S APPROVAL OF THIS CONDITIONAL USE PERMIT IS SUBJECT TO THE
APPROVAL OF APPROPRIATE PERMITS BY OTHER GOVERNMENTAL AGENCIES.
7. NO EXPLOSIVES SHALL BE ALLOWED FOR THIS OPERATION.
8. THE ENTIRE ACTIVE AREA OF THE SITE SHALL BE FENCED WITH A 4 FOOT HIGH
FENCE AND WARNING SIGNS WITH NOTICE OF THE INHERENT DANGERS OF
THE OPERATION SHALL BE ERECTED EVERY 100 FEET.
9. ALL VEGETATION ON THE SUBJECT PROPERTY, OUTSIDE OF THE FENCED
ACTIVE AREA, SHALL REMAIN IN ITS NATURAL STATE UNTIL MINING
OPERATIONS ARE CONCLUDED ON THE ENTIRE PARCEL, WITH THE EXCEPTION
OF DISEASE CONTROL. VEGETATION IN SUBSEQUENT PHASES SHALL ALSO
REMAIN UNDISTURBED UNTIL THE PRECEDING PHASE IS CONCLUDED.
.
10.
RECLAMATION
A. RECLAMATION SHALL BE IMPLEMENTED ON AN ANNUAL BASIS PURSUANT TO
THE RECLAMATION PLANS SUBMITTED BY THE OPERATOR.
B. EACH YEAR A PLAN FOR THAT YEARS RECLAMATION SHALL BE APPROVED BY
THE BUILDING AND ZONING ADMINISTRATOR PRIOR TO ISSUANCE OF THE
ANNUAL MINERAL EXCAVATION LICENSE.
C. A $5,000 LETTER OF CREDIT, BOND OR OTHER DEPOSIT APPROVED BY STAFF
SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF THE ANNUAL LICENSE TO
COVER THE FORTH COMING YEARS RECLAMATION.
D. THE ANNUAL RECLAMATION PLAN SHALL INCLUDE PLANTING AN AVERAGE
OF 50 SEEDLING TREES PER ACRE. SOME AREAS MAY HAVE NO TREES AND
STAFF MAY REQUIRE A GREATER THAN AVERAGE NUMBER ON OTHER AREAS,
IF CONDITIONS WARRANT.
E. RECLAMATION SHALL INCLUDE TOP SOIL FROM THE SITE BEING PRESERVED
AND PUT BACK INTO PLACE AFTER MINING.
F. THE VEGETATION ESTABLISHED FOR RECLAMATION MUST BE MAINTAINED
UNTIL IT IS SELF SUFFICIENT.
G.
CONTOURS, FINISHED GRADES, DETAILS OF EROSION CONTROL METHODS,
AND SETTLING PONDS, SHALL COMPLY WITH THE PLANS SUBMITTED AND THE
CITY ORDINANCE AT THE TIME OF RECLAMATION.
.
Planning Commission Minutes
August 23, 1994
Page 6
.
,,1 fffJ~{J l'lP'@J
, "rb lUlj
IT IS RECOMMENDED THAT SHIELY PLANT TREES NOW THAT WILL HE~~~fcRE/tJ,nWIl'
FUTURE EXCAVATION SITES.
H.
11. GROUND WATER PROTECTION MEASURES SHALL INCLUDE:
A. EXTRACTION AND CRUSHING OPERATIONS SHALL BE MAINTAINED AT A
MINIMUM OF 40 FEET ABOVE THE WATER TABLE. APPROVAL TO EXCAVATE
DEEPER SHALL REQUIRE AN AMENDMENT TO THIS PERMIT.
B. THE OPERATOR SHALL FILE WITH THE CITY AN EMERGENCY SPILL RESPONSE
PLAN. THE OPERATOR SHALL ADHERE TO THIS PLAN IN THE EVENT THERE IS A
SPILL.
C. THE OPERATOR SHALL PROVIDE THE FIRE DEPARTMENT WITH A COPY OF THEIR
HAZARDOUS MATERIALS LIST.
D. FUEL TANKS SHALL BE ABOVE GROUND, PROPERLY DIKED AND PERMITTED BY
MPCA, THE FIRE MARSHALL, AND THE CITY.
E. ALL INSTANCES THAT HAVE THE POTENTIAL TO ADVERSELY AFFECT GROUND
WATER, INCLUDING, BUT NOT LIMITED TO SPILLS, SHALL BE VERBALLY
REPORTED TO THE CITY WITHIN 24 HOURS. THIS VERBAL NOTIFICATION SHALL
BE FOLLOWED UP IN WRITING WITHIN 4 WORKING DAYS.
.
F.
APPROPRIATE WATER APPROPRIATION PERMIT(S) FROM THE DEPARTMENT OF
NATURAL RESOURCES MUST BE OBTAINED.
G. GROUNDWATER MONITORING WELLS SHALL BE INSTALLED IN LOCATIONS
AND DEPTHS AS RECOMMENDED BY CITY CONSULTANTS. WATER LEVEL
MONITORING AND WATER QUALITY MONITORING SHALL BE CONDUCTED AS
PER THE CONSULTANT'S RECOMMENDATIONS. A DESCRIPTION OF THE
MONITORING SYSTEM SHALL BE SUBMITTED TO THE CITY FOR APPROVAL 14
DAYS PRIOR TO CONSTRUCTION. THE MONITORING SYSTEM SHALL BE
COMPLETE PRIOR TO COMMENCING MINING ACTIVITIES.
H. WATER USAGE BY MINING ACTIVITIES SHALL NOT ADVERSELY AFFECT
ADJACENT RESIDENTIAL WELLS. MITIGATION MEASURES MAY INCLUDE BUT
ARE NOT LIMITED TO CURTAILING OF PUMPING ACTIVITIES UNTIL WATER
LEVELS RETURN.
I. IF IT IS PROVEN BY THE CITY OR THE DNR, THAT THE MINING ACTIVITIES HAVE
HAD A NEGATIVE AFFECT ON ADJACENT WELLS THAT WILL REQUIRE
REMEDIAL ACTIONS, IT IS THE RESPONSIBILITY OF THE SHIEL Y COMPANY TO
TAKE THE REMEDIAL ACTION NECESSARY TO CORRECT THE SITUATION WITHIN
30 DAYS AND PAY FOR BOTH THE REMEDIAL ACTION AND THE CITY'S COST
FOR INVESTIGATION.
J.
ROUTINE VEHICLE MAINTENANCE SHALL BE PERFORMED IN A SHOP OR ON A
CONCRETE SLAB. THE SHOP SHALL BE EQUIPPED WITH A FLAMMABLE WASTE
TRAP. ALL FLOOR DRAINS IN THE SHOP WILL BE REQUIRED TO DRAIN TO
HOLDING TANKS AND TREATED AT AN APPROPRIATE FACILITY, NOT A SEPTIC
.
Planning Commission Minutes
August 23, 1994
. ------~~~~:~-~-~:ARDOUS WASTE LICENSE THROUGH MPCA WILL BE R~ R'fjl@!IIh~rJ;"
ALL WASTE FLUIDS WILL BE CONTAINED, CLEANED UP, AND RECYCLED OrP~fjjjlJ/i ,h~!
DISPOSED OF ACCORDING TO APPROPRIATE MPCA REGULATIONS. LEAKS 1.1.
FROM EMERGENCY REPAIRS DOWN IN THE FIELD WILL BE CONSIDERED A
SPILL.
Page 7
K. SHIEL Y SHALL CONDUCT BACKGROUND WATER QUALITY TESTING PRIOR TO
THE COMMENCEMENT OF MINING OPERATIONS (AS PER JOHN THE CITY
CONSULTANT'S RECOMMENDATION).
12. WETLANDS
A. THE WETLAND PROPOSED TO BE ELIMINATED BY MINING ACTIVITIES IN PHASE
II (OR ANY WETLAND PROPOSED TO BE IMPACTED), MUST BE REVIEWED
UNDER THE CRITERIA OF THE WETLAND CONSERVATION ACT, RECEIVE
APPROVALS FROM ALL APPROPRIATE GOVERNMENTAL AGENCIES, AND BE
MITIGATED AT A RATIO OF AT LEAST 2:1, PRIOR TO THE COMMENCEMENT OF
MINING ACTIVITIES IN THAT PHASE. IF ALL APPROVALS NEEDED TO ELIMINATE
THIS WETLAND CANNOT BE OBTAINED, THE WETLAND MUST BE AVOIDED.
B. ALL STORM WATER ASSOCIATED WITH MINING ACTIVITIES MUST RECEIVE PRE-
TREATMENT (WHERE NECESSARY) PRIOR TO RELEASE TO NATURAL WETLANDS
OR OFF-SITE.
. C.
D.
13.
A.
B.
C.
D.
E.
F.
.
BEST MANAGEMENT PRACTICES WILL BE USED TO PROTECT NATURAL
WETLANDS.
MINING ACTIVITIES SHALL BE ADJUSTED AS NECESSARY TO AVOID NEGATIVE
AFFECTS ON WETLANDS, INCLUDING A DECREASE IN WATER LEVELS.
OAK WILT CONTROL
NO TREES WILL BE CUT FROM APRIL 15TH THROUGH JULY 15TH.
ALL STUMPS MUST BE REMOVED PRIOR TO APRIL 15TH THAT ARE WITHIN 100
FEET OF TREES NOT CUT.
APPROPRIATE ACTIONS MUST BE TAKEN WHEN CUTTING TREES TO AVOID
MECHANICAL DAMAGE TO TREES THAT ARE TO REMAIN.
NO ROOTS FROM TREES THAT ARE TO REMAIN SHALL BE LEFT EXPOSED.
APPROPRIATE MEASURES SHALL BE TAKEN TO AVOID BARK BEETLES FROM
OVER WINTERING IN WOOD FROM TREES THAT ARE REMOVED.
SHIEL Y'S WILL CONTROL OAK WILT ON THEIR ENTIRE SITE AS REQUIRED BY THE
CITY AND COUNTY FORESTER.
Planning Commission Minutes
August 23, 1994
Page 8
14. DUST CONTROL
.
A. A PERMIT FROM MPCA REGARDING AIR EMISSIONS SHALL BE OBTAINED AND
PARTICULATE EMISSION STANDARDS SHALL BE MET BY THE OPERATION.
B. ALL EQUIPMENT SHALL BE LOCATED AS TO REDUCE DUST TO ADJACENT
RESIDENTIAL PROPERTIES.
C. WATER, BUT NO CHEMICAL AGENTS SHALL BE USED TO CONTROL DUST AS
NECESSARY.
D. THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL MEASURES BE TAKEN
IF WARRANTED BY DUST PROBLEMS INCLUDING, BUT NOT LIMITED TO,
REDUCING STOCK PILE HEIGHTS.
E. THE FIRST 100 FEET OF THE ACCESS ROAD PRIOR TO COUNTY ROAD 33 SHALL
ALSO BE PAVED TO MINIMIZE DUST.
15. TRAFFIC
A.
ALL TRAFFIC ASSOCIATED WITH THE OPERATION SHALL ONLY USE COUNTY
ROAD 33 BACK AND FORTH TO U.S. HIGHWAY 169. EXCEPT FOR LOCALIZED
JOBS, NO TRAFFIC FROM THIS OPERATION SHALL USE PROCTOR AVENUE OR
COUNTY ROAD 33 TO THE WEST OF THE SITE. A MAP SHALL BE PREPARED BY
CITY STAFF THAT DEFINES LOCALIZED JOBS. SHIEL Y SHALL POST NOTICE OF
THESE REQUIREMENTS AT THE EXIT FROM THEIR SITE. FAILURE TO CONTROL
TRAFFIC FROM THIS OPERATION SHALL CONSTITUTE A VIOLATION OF THIS
PERMIT.
.
B. AN ACCELERATION AND BY-PASS LANE SHALL BE CONSTRUCTED AT SHIELY'S
EXPENSE AND ON RIGHT-OF-WAY THEY DEDICATE TO SHERBURNE COUNTY
AS PER THE SPECIFICATIONS OF THE SHERBURNE COUNTY ENGINEER, PRIOR
TO HAULING ACTIVITIES COMMENCING.
C. THE LOCATION OF THE ACCESS TO THE SITE SHALL BE DETERMINED BY THE
SHERBURNE COUNTY ENGINEER. AN ACCESS PERMIT FROM SHERBURNE
COUNTY MAY BE REQUIRED OF THE OPERATOR.
D. THE OPERATOR SHALL REIMBURSE SHERBURNE COUNTY FOR ABNORMAL
WEAR ON (DAMAGE CAUSED BY OTHER THAN TRAFFIC FLOW THAT THE ROAD
WAS DESIGNED TO HANDLE) HAUL ROADS THAT IS CAUSED BY THE
OPERATION.
16. THE BERM ALONG COUNTY ROAD 33 IDENTIFIED IN THE OPERATOR'S PLANS,
SHALL BE CONSTRUCTED TO ACT AS A VISUAL SCREEN OF THE OPERATION.
THIS BERM SHALL BE BUILT AND LANDSCAPED WITHIN THE FIRST YEAR OF THE
MINES OPERATION ACCORDING TO A LANDSCAPED PLAN APPROVED BY
STAFF.
.
17.
WASH WATER USED IN THE OPERATION SHALL BE RECYCLED IN A TWO POND
SYSTEM ALLOWING FOR SEDIMENTATION.
Planning Commission Minutes
August 23, 1994
Page 9
18. NOISE
A. NOISE FROM SCREENING AND CRUSHING ASSOCIATED WITH THIS
OPERATION SHALL BE CONTROLLED BY LOCATION ON THE SITE, THE
PLACEMENT OF STOCKPILES, TYPE OF EQUIPMENT AND ULTIMATELY BY
PLACING THEM IN SOUNDPROOF BUILDINGS, IF NECESSARY AS DETERMINED
BY STAFF.
.
B. MICROWAVE BACK-UP ALARMS OR EQUIVALENT ALTERNATIVE
TECHNOLOGY SHALL BE USED AS DETERMINED NECESSARY BY STAFF.
C. A TURNAROUND WILL BE PROVIDED WITHIN THE PIT SO THAT TRUCKS NOT
EQUIPPED WITH MICROWAVE BACKUP ALARMS WILL NOT NEED TO BACK UP.
D. FIFTY-FIVE (55) DECIBELS AT THE SITE'S WEST AND SOUTH PROPERTY LINES
AND STATE STANDARDS AT THE OTHER PROPERTY LINES ARE THE NOISE LEVEL
STANDARDS THAT SHALL BE ADHERED TO AT ALL TIMES BY THE OPERATOR.
19. HOURS OF OPERATION
.
ALL MINERAL EXCAVATION AND PROCESSING ACTIVITIES SHALL BE
CONDUCTED BETWEEN THE HOURS OF 7:00 A.M. AND 7:00 P.M., MONDAY
THROUGH SATURDAY. INCREASED HOURS SHALL REQUIRE AN AMENDMENT
TO THIS PERMIT AND CANNOT BE REQUESTED THE FIRST YEAR OF THIS PERMIT.
20.
LIGHTING
LIGHTING FROM THE OPERATION SHALL BE DIRECTED AWAY FROM PUBLIC
RIGHT-OF-WAY AND NEARBY OR ADJACENT RESIDENTIAL PROPERTY. GLARE,
WHETHER DIRECTED OR REFLECTED AS DIFFERENT FROM GENERAL
ILLUMINATION, SHALL NOT BE VISIBLE FROM BEYOND THE LIMITS OF THE
IMMEDIATE SITE. ALL SOURCES OF ARTIFICIAL LIGHTS SHALL BE SO FIXED,
DIRECTED, DESIGNED, OR SIZED, THAT THE MINIMUM SUBTOTAL OF THEIR
ILLUMINATION SHALL NOT INCREASE THE LEVEL OF THE ILLUMINATION ON
ANY NEARBY RESIDENTIAL PROPERTY FOR MORE THAN .1 FOOT CANDLES IN
OR WITHIN 25 FEET OF A DWELLING OR MORE THAN .5 FOOT CANDLES ON
ANY PART OF THE PROPERTY.
21. THE PILING, STORING, OR KEEPING OF OLD MACHINERY, JUNK, DEBRIS, OR
ABANDONED MOTOR VEHICLES, SHALL BE PROHIBITED ON THE SITE.
22. MINING ACTIVITIES SHALL NOT CAUSE EXCESSIVE VIBRATION OFF-SITE.
23. MECHANISM FOR RESPONDING TO COMPLAINTS
A.
REPRESENTATIVES OF THE SHIELY COMPANY SHALL MAKE THEMSELVES
AVAILABLE TO ADDRESS COMPLAINTS. A PLAN TO DEAL WITH THE
COMPLAINT SHALL BE DEVELOPED AND IMPLEMENTED. SHIEL Y WILL ALSO
FOLLOW-UP WITH THE COMPLAINANT AND ALL APPROPRIATE DOCUMENTS
COPIED TO THE CITY WITHIN ONE WEEK.
.
Planning Commission Minutes
August 23, 1994
Page 10
.
B.
'(m
U"
"
CITY STAFF WILL FACILITATE MEETINGS BETWEEN REPRESENTATIVES OF
RIDGEWOOD AND GREENHEAD NEIGHBORHOODS AND SHIEL Y TO DISCUSS
ISSUES ON 6/1/95, 8/1/95 AND 10/1/95. SHIELY WILL FACILITATE FUTURE
MEETINGS AS NECESSARY, BUT THESE MEETINGS WILL BE HELD A MINIMUM OF
TWICE A YEAR ON MARCH 1ST AND AUGUST 1ST. THE CITY WILL BE
INVOLVED IN THESE FUTURE MEETINGS ONLY IF REQUESTED BY EITHER PARTY.
24. APPROVAL OF THIS PERMIT IS SUBJECT TO THE SITE BEING REZONED TO
ME/MINERAL EXCAVATION OVERLAY DISTRICT.
COMMISSIONER MINTON SECONDED THE MOTION. Commissioner Kreger
commented that he disagreed with the condition regarding road improvements
to County Road No. 33 must be done prior to any hauling being allowed.
Commissioner Kreger stated that limiting the amount of truck traffic would be
unnecessary if the City limited the volume that could be taken out of the pit this
season.
THE MOTION CARRIED 5-0.
Commissioner Kreger stated he would abstain from discussion and voting on this
issue due to a conflict of interest and removed himself from the table.
.
staff report presented by Steve Rohlf. The City is initiating a zone change to
"Mineral Excavation Overlay District" on most parcels identified in the EIS on
mineral excavation.
Chairman Tveite opened the public hearing.
Mike Niziolek, explained naturally significant lands and the proposed land
dedication.
Rolf Anderson, representing the Park and Recreation Board, informed the
Planning Commission that the Park and Recreation Board recommended this
land be accepted in lieu of some portion of Shiely's future park dedication fees.
COMMISSIONER KREGER MOVED TO RECOMMEND THE CITY COUNCIL ACCEPT
SHIEL Y'S OFFER OF LAND DEDICATION IN LIEU OF PARK DEDICATION FEES.
COMMISSIONER EBERLEY SECONDED THE MOTION. THE MOTION CARRIED 5-0. The
Park and Recreation Board issues will be before the City Council on Monday,
September 29, 1994. The zone change request will not be before the City
Council until October 17, 1994.
Bruce Pearson, 19874 Watson, stated that he gave Steve Rohlf a copy of a land
trust document and suggested the City use this type of mechanism to acquire
additional lands for the City.
.
Planning Commission Minutes
August 23, 1994
.
Commissioner Eberley commented on implementing a mechanism to identify
and preserve areas such as those presented by Mr. Niziolek. Discussion ensued
and the decision was that this was more of a Park and Recreation Board issue.
Joel Ranallo, 11652-211 Avenue, requested clarification of the "ME" zoning
designation. Steve Rohlf responded.
Steve Griffiths, 20760 York Street, asked staff who initiated this request. Steve Rohlf
responded.
Darrell Thompson, 20608 Watson, requested clarification of the environmental
approvals. Peter Beck responded clarifying zoning, overlay zoning, procedures to
identify the mining area, the EA Wand EIS reviews.
Maureen Griffiths, 20760 York Street, asked staff what area residents should
expect regarding their property values being decreased/increased and what
affect this would have on taxes or assessments. Steve Rohlf responded and
suggested concerned residents contact Sherburne County Assessor's Office.
There being no further comments from the public, Chairman Tveite closed the
public hearing.
.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF THE ZONE
CHANGE REQUEST BY THE CITY OF ELK RIVER FOR THE MINERAL EXCAVATION
DISTRICT, PUBLIC HEARING, CASE NO. ZC 94-09, CITING STAFF'S MEMO AND
SUPPORTING EVIDENCE FROM THE ENVIRONMENTAL IMPACT STATEMENT AS FINDING
OF FACT. COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED
4-0-1, Commissioner Kreger abstained.
The Planning Commission recessed at approximately 9:53 p.m. and reconvened at 10:00
p.m.
5,3... ........Col1sideFOvariaf1eeReguest..by..RiverviewSoortsrl'uHlicHedril1a(...Case..Nd,'V.~M#8>
Staff report presented by Troy Langer. Mr. Lundquist, representing Riverview
Sports, requested a variance from the City Code sign setback and sign size
requirements. For the record, Mr. Langer noted that a smaller sign could be
constructed without the need for a variance.
.
Mr. Lundquist, Riverview Sports, explained that he originally wanted to make
improvements to his sign however, because the existing sign is a legal non-
conforming sign, he realized that the proposed sign would require a variance.
Further, due to the construction of the retaining wall along Highway 10 and the
roadway elevation, Mr. Lundquist realized that in order for sign to be seen from
Highway 10 he would have to erect a larger sign. After some discussion with staff,
Mr. Lundquist realized he could make improvements to his existing sign or go
through the variance process to construct a new sign. Mr. Lundquist feels that
because of circumstances beyond his control (the retaining wall being built along
Highway 10) and that fact that he wants to construct a safer sign (the current
footings would not safely support a larger sign however, it could be constructed
according to City Code) necessitate the need for this request. Mr. Lundquist took
Planning Commission Minutes
August 23, 1994
.
a video of the existing sign, the retaining wall under construction, etc., and asked
the Planning Commission to review this video. The video was played and Mr.
Lundquist reviewed the aforementioned points.
Chairman Tveite opened the public hearing.
Steve Steward, 18290 Ogden Street, stated that due to the particular
circumstances surrounding this request, he is in favor of the variance request.
There being no further comments from the public, Chairman Tveite closed the
public hearing.
Planning Commission discussion included: hardship due to retaining wall
construction, roadway elevation, size of proposed sign, reduce wall signage and
increase free standing wall signage.
COMMISSIONER KREGER MOVED TO RECOMMEND APPROVAL OF THE VARIANCE
REQUESTS BY RIVERVIEW SPORTS, PUBLIC HEARING, CASE NO. V 94-08, CITING
STAFF'S MEMO AND INFORMATION GAINED AT THE PUBLIC HEARING AS FINDING OF
FACT. THE ELEVATION BETWEEN HIGHWAY 10 AND THE SUBJECT SITE IS UNIQUE AND
UNUSUAL WITHIN THE CITY AND THE SERVICE ROAD ONLY AGGRAVATES THE
SITUATION. APPROVAL IS RECOMMENDED WITH THE FOLLOWING CONDITION:
1.
THE APPLICANT BE LIMITED TO TWO HUNDRED, FIFTY (250) SQUARE FEET OF
WALL SIGNAGE.
.
COMMISSIONER EBERLEY SECONDED THE MOTION. THE MOTION CARRIED 3-2.
Commissioner Minton opposed stating elevation of the retaining wall should not
be a factor when considering this proposal. Commissioner Kuester stated she
supports the sign size however, she opposed the setback and therefore, voted
against the request.
........"..............."..................... """............ .... ..
QM(j()l"lsj~~rRr~limll"lqt;l... gldf()l"l~9(2)I"1(jjti8l'l9Iqs~p~~~it~~g9~st~9'tEIkRiver.
DeveI6omeritlnC.IPl..JblidHedtlnQ'G6selNb.f194410dnOCU9:4;30>
Staff report presented by Steve Ach. Elk River Development requested
preliminary plat and a conditional use permit to develop a commercial planned
unit development. Mr. Ach presented revised plans to the Planning Commission.
Terry Maurer presented his report to the Planning Commission. It is Mr. Maurer's
opinion that an additional traffic analysis for the entire subject area be done. Mr.
Maurer feels that there is not enough information provided to come to the
conclusions stated in the traffic analysis by Benshoof and Associates, Inc.
Bruce Peterson, Shopping Center Consultant, reviewed his plans as part owner of
the proposed project.
Dan O'Brien, Architect, reviewed the revised site plans.
.
Chairman Tveite opened the public hearing.
Planning Commission Minutes
August 23, 1994
.
(if
Ed Wortman, 18857 Dodge Street, commented that this project is larger than the
original project proposed and stated that he is opposed to this request.
Steve Stewart, 18290 Ogden, asked staff who bears the cost of improvements.
Terry Maurer responded.
Kerry -' 11378-89th Avenue, questioned if area residents would be assessed
regarding future development. Chairman Tveite responded.
Arlan Fuchs, 266 Elk Hills Drive, expressed concerns regarding increased traffic
since traffic is currently overloaded in this area. Mr. Fuchs also stated that he
would like to see the proposed hours of operation of the restaurant reduced or
limited in the late evening. However, Mr. Fuchs stated he is not opposed to the
proposed project.
Rich Kreiser, 232 Elk Hills Drive, iterated concerns regarding traffic on Elk Hills Drive
and Dodge. He is not opposed to the proposed project but requested additional
information regarding a traffic study.
There being no further comments from the public, Chairman Tveite closed the
public hearing.
Planning Commission discussion included: service roads and traffic concerns,
storm drainage fee, pond, proposed hours of operation, and sign requirements.
.
COMMISSIONER KREGER MOVED TO RECOMMEND APPROVAL OF PRELIMINARY
PLAT BY ELK RIVER DEVELOPMENT, INC., CASE NO. P 94-10, CITING STAFF'S MEMO
AND INFORMATION RECEIVED AT THE PUBLIC HEARING AS FINDING OF FACT.
APPROVAL IS RECOMMENDED WITH THE FOLLOWING CONDITIONS:
1. A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED PRIOR TO FINAL
PLAT APPROVAL.
2. TERRY MAURER'S MEMO DATED AUGUST 18, 1994, BE INCORPORATED AS
PART OF THE APPROVAL FOR PRELIMINARY PLAT.
3. THE DEVELOPER PAY FAIR SHARE OF ROAD IMPROVEMENTS TO DODGE
AVENUE AND ELK HILLS DRIVE BETWEEN DODGE AND HIGHWAY 169.
4. PAYMENT OF PARK DEDICATION IN THE AMOUNT REQUIRED BY CITY
ORDINANCE AT THE TIME OF FINAL PLAT APPROVAL.
5. AS PER ADOPTED POLICY, A STORM DRAINAGE FEE IN THE AMOUNT OF $600
PER ACRE BE PAID PRIOR TO THE RELEASE OF FINAL PLAT FOR RECORDING.
6. DEVELOPER CONSTRUCT A SIX (6) FOOT WIDE CONCRETE SIDEWALK ALONG
THE WEST SIDE OF DODGE AVENUE FROM THE INTERSECTION OF ELK HILLS
DRIVE TO THE NORTHERLY LIMITS OF THE PROPOSED DEVELOPMENT.
7.
NECESSARY ROAD IMPROVEMENTS TO DODGE AND ELK HILLS DRIVE BE
COMPLETED PRIOR TO OCCUPANCY OF ANY BUILDINGS WITHIN THE
PLANNED UNIT DEVELOPMENT.
.
Planning Commission Minutes
August 23, 1994
Page 14
.
8. CROSS ACCESS/CROSS PARKING AGREEMENTS BE PREPARED AND REVIEWED
BY THE CITY PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING.
9. NECESSARY DRAINAGE AND UTILITY EASEMENTS BE INCLUDED ON THE PLAT
ALLOWING PUBLIC UTILITIES TO BE INSTALLED TO SERVE THE PROPOSED
DEVELOPMENT.
10. STREET LIGHTS BE INSTALLED AS REQUESTED BY ELK RIVER UTILITIES. THESE
LIGHTS SHALL BE PAID FOR BY THE DEVELOPERS.
11. A FURTHER TRAFFIC STUDY BE INITIATED FOR THE AREA SURROUNDING THE
PROJECT.
12. THE DESIGN FOR STREET MODIFICATIONS BE COMPLETED PRIOR TO ISSUANCE
OF BUILDING PERMITS.
COMMISSIONER MINTON SECONDED THE MOTION. THE MOTION CARRIED 5-0.
.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF A CONDITIONAL
USE PERMIT TO DEVELOP A COMMERCIAL PLANNED UNIT DEVELOPMENT BY
RIVERSIDE DEVELOPMENT, INC., PUBLIC HEARING, CASE NO. CU 94-30, CITING
STAFF'S MEMO AND INFORMATION RECEIVED DURING THE PUBLIC HEARING AS
FINDING OF FACT. APPROVAL IS RECOMMENDED WITH THE FOLLOWING
CONDITIONS:
1. A PUD (PLANNED UNIT DEVELOPMENT) AGREEMENT BE PREPARED AND
EXECUTED INCLUDING BUT NOT LIMITED TO THE FOLLOWING STANDARDS:
A. A TOTAL OF 29,680 SQUARE FEET OF BUILDING AREA BE ALLOWED.
B. ALLOWABLE USES INCLUDE THE PROPOSED USES SHOWN ON THE
PLAN AND THOSE LISTED IN THE C2 ZONING DISTRICT.
C. BUSINESS HOURS BE LIMITED TO 7 AM TO 10 PM, MONDAY THROUGH
SUNDAY, SUBJECT TO REVISION AT THE TIME OF SITE PLAN REVIEW.
D. ALL OTHER ELEMENTS SHOWN ON THE PROPOSED SITE PLAN BE
INCLUDED AND MADE PART OF FUTURE APPROVALS.
E. TERMS AND CONDITIONS FOR ADMINISTERING DEVELOPMENT OF THE
PUD.
2. ALL FUTURE SITE PLAN PROPOSALS BE REVIEWED THROUGH THE CONDITIONAL
USE PERMIT PROCESS.
3. ALL COMMENTS WITHIN THIS MEMO AND TERRY MAURER'S MEMO DATED
AUGUST 18, 1994, BE INCORPORATED INTO THE DEVELOPMENT PLAN AND
APPROVAL OF THIS CONDITIONAL USE PERMIT.
4. GUIDELINES FOR SIGNAGE FOR THE PLANNED UNIT DEVELOPMENT CONSIST
OF:
A.
ONE MONUMENT STYLE SIGN IDENTIFYING THE DEVELOPMENT WITH A
MAXIMUM HEIGHT OF TWENTY (20) FEET AND A WIDTH OF FIFTEEN
(15) FEET.
.
Planning Commission Minutes
August 23, 1994
B.
.
ONE MONUMENT STYLE SIGN IDENTIFYING THE RESTAURANT WITH A
MAXIMUM HEIGHT OF TEN (10) FEET AND AREA OF ONE HUNDRED
(100) SQUARE FEET.
WALL SIGNAGE CONSISTING OF INDIVIDUAL LETTERS WITH A
MAXIMUM LETTER HEIGHT OF THREE (3) FEET.
5. ACCESS POINTS OF THE DEVELOPMENT INCLUDE ONE AT 189TH AVENUE AND
ONE SOUTH OF THE SOUTHERLY HOME ON THE EAST SIDE OF DODGE AVENUE
AT A LOCATION APPROVED BY CITY STAFF BASED ON FINAL IMPROVEMENT
PLANS FOR DODGE AVENUE.
C.
6. ALL PARKING AREAS BE BOUNDED BY B612 CONCRETE CURB AND GUTTER.
7. EARTH BERMING BE MAXIMIZED ALONG THE EAST PORTION OF THE SITE TO
BUFFER THE COMMERCIAL FROM THE RESIDENTIAL AREA.
8. THE LANDSCAPING PLAN INCLUDE A VARIETY OF LANDSCAPE MATERIAL
WITH AN EMPHASIS OF CONIFERS ALONG THE EAST PORTION OF THE
PROPERTY WITH A VARYING SIZE OF SIX TO EIGHT (6-8) FEET. ALSO,
ADDITIONAL LANDSCAPING BE INCLUDED WITHIN THE LANDSCAPED AREA
ALONG HIGHWAY 169.
9. A LANDSCAPING THEME BE ESTABLISHED AND INCORPORATED INTO THE
DEVELOPMENT.
.
10.
THE EXISTING TREE AT THE SOUTH END OF THE SITE BE SAVED AND
INCORPORATED INTO THE DEVELOPMENT.
11. UNDERGROUND IRRIGATION BE UTILIZED THROUGHOUT THE DEVELOPMENT.
12. PROPOSED BUILDINGS ESTABLISH ARCHITECTURAL CONTINUITY AND
ENHANCED TO MEET INTENT OF THE PUD ZONING DISTRICT.
13. ALL DELIVERY AND SERVICE VEHICLES SHALL BE RESTRICTED TO USING THE
SOUTHERLY DRIVEWAY TO THE DEVELOPMENT.
COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
Commissioner Kreger stated he would abstain from discussion and voting on this
request due to a conflict of interest. and removed himself from the table.
Staff report presented by Gary Schmitz. Northern States Power (NSP) requested
an amendment to their existing conditional use permit to construct a fifty (50) foot
by eighty (80) foot metal skin building to store equipment and parts. Mr. Schmitz
also stated that staff met with the applicant prior to the Planning Commission
meeting and proposed to modify the recommendation to include a double row
of coniferous trees.
.
Planning Commission Minutes
August 23, 1994
Page 16
f''{i
.
{,,(;;, t,'~:_'~
Glen Kaas, Elk River Resource Recovery Facility, commented about the ext&Fi.Pl;!o~t.
the building and requested staff remove condition #2 in staff's memo. DiscussioN &.j
ensued.
Chairman Tveite opened the public hearing. There being no comments from the
public, Chairman Tveite closed the public hearing.
Planning Commission discussion included: variance, amendment to the existing
conditional use permit, trees along the north property line, exterior of proposed
building.
COMMISSIONER EBERLEY MOVED TO RECOMMEND APPROVAL OF THE AMENDMENT
TO THE EXISTING CONDITIONAL USE PERMIT TO CONSTRUCT A FIFTY (50) FOOT BY
EIGHTY (80) FOOT METAL SKIN BUILDING BY NORTHERN STATES POWER, PUBLIC
HEARING, CASE NO. CU 94-29, CITING STAFF'S MEMO AS FINDING OF FACT.
APPROVAL IS RECOMMENDED WITH THE FOLLOWING CONDITIONS:
1. THE EXTERIOR OF THE ACCESSORY BUILDING BE PAINTED TO MATCH THE
EXISTING FACILITY.
2. THE APPLICANT ADD A DOUBLE, STAGGERED ROW OF SIX (6) FOOT
CONIFEROUS TREES ALONG THE NORTH PROPERTY LINE.
.
COMMISSIONER MINTON SECONDED THE MOTION. THE MOTION CARRIED 4-0-1,
Commissioner Kreger abstained.
...-..------.--.--------.------.-.........-....-......................""""""""""""."....-..................................-,-.........-.---..--..-....
,S.$ConsidefdMdddhdeReouesfbVCf'ldrlieCotl1l:)s,p061iCHeannd'CdseNo.Y'94410
Staff report presented by Troy Langer. Charlie Combs requested a twenty (20)
foot variance from the City Code setback requirements for a septic system from
shore land boundary.
Mr. Combs addressed the Planning Commission and reviewed his request for a
variance.
Chairman Tveite opened the public hearing. There being no comments from the
public, Chairman Tveite closed the public hearing.
COMMISSIONER KREGER MOVED TO RECOMMEND APPROVAL OF THE VARIANCE
REQUEST BY CHARLIE COMBS, PUBLIC HEARING, CASE NO. V 94-10, CITING STAFF'S
MEMO AND INFORMATION GAINED REGARDING THE WATER PROBLEM ON THE
NORTH END OF THE LOT AS FINDING OF FACT. COMMISSIONER EBERLEY SECONDED
THE MOTION. THE MOTION CARRIED 5-0.
.
Staff report presented by Gary Schmitz. Jake Jacobson requested an ordinance
amendment exempting Lot 4, Block 4, Oak Meadows from the interim subdivision
moratorium ordinance for parcels less than ten (10) acres in size for the eastern
area of the City.
Planning Commission Minutes
August 23, 1994
Page 17
CHAIRMAN MINTON MOVED TO CONTINUE THE REGULARLY SCHEDULED MEETING OF
THE ELK RIVER PLANNING COMMISSION TO AUGUST 24, 1994. COMMISSIONER
KREGER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
.
Mrs. Jacobson addressed the Planning Commission and reviewed her request.
Chairman Tveite opened the public hearing.
Steve Stewart, 18290 Ogden Street, asked staff where the closest trunk line is
located to service this area. Steve Ach responded.
There being no further comments from the public, Chairman Tveite closed the
public hearing.
Planning Commission discussed the request and the possibility of setting a
precedent leading to other similar requests in the future. Peter Beck commented.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF THE ORDINANCE
AMENDMENT REQUEST EXEMPTING LOT 4, BLOCK 4, OAK MEADOWS FROM THE
INTERIM SUBDIVISION MORATORIUM ORDINANCE FOR THE EASTERN AREA OF THE
CITY BY JAKE JACOBSON, PUBLIC HEARING, CASE NO. OA 94-3, CITING STAFF'S
MEMO AS FINDING OF FACT. COMMISSIONER EBERLEY SECONDED THE MOTION.
THE MOTION CARRIED 5-0.
.
Staff report presented by Steve Ach. Request to rezone approximately 150 acres
from PUD (Planned Unit Development) and C2 (Office District) to BP (Business
Park) .
Chairman Tveite opened the public hearing.
Steve Steward, 18290 Ogden Street, stated he was opposed to this request.
Stewart Wilson, 17975 Troy Street, stated he was in favor of the rezoning request,
however, he asked staff to clarify why the zone designation of PUD (Planned Unit
Development) was not extended straight west from the currently zoned C2
(Office District) designation. Mr. Wilson suggested staff reconsider adjusting the
zoning designation line. Steve Ach responded. Discussion including the Planning
Commission ensued.
Steve Ach presented a letter from Carol Mills, Guardian Angels, stating that
Guardian Angels was in favor of the proposed rezoning.
There being no further comments from the public, Chairman Tveite closed the
public hearing.
.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF THE REQUEST TO
REZONE APPROXIMATELY 150 ACRES FROM PUD (PLANNED UNIT DEVELOPMENT)
Planning Commission Minutes
August 23, 1994
.
AND C2 (OFFICE DISTRICT) TO BP (BUSINESS PARK) BY THE CITY OF ELK RIVER, PUBLIC
HEARING, CASE NO. ZC 94-10, CITING STAFF'S MEMO AS FINDING OF FACT.
APPROVAL IS RECOMMENDED WITH THE FOLLOWING CONDITION:
1. THE SOUTHERLY PROPERTY LINE BE AMENDED MAKING THE AREA MORE
FEASIBLE FOR DEVELOPMENT, LEAVING THE LOWER PORTION OF THE PUD
(PLANNED UNIT DEVELOPMENT) AS R1 C (SINGLE FAMILY RESIDENTIAL).
COMMISSIONER EBERLEY SECONDED THE MOTION. THE MOTION CARRIED 5-0.
COMMISSIONER EBERLEY MOVED TO RECOMMEND THE CITY COUNCIL WAIVE THE
APPLICATION FEES FOR A LAND USE AMENDMENT AND ZONE CHANGE REQUEST FOR
THIS LOWER PORTION OF THE PUD (PLANNED UNIT DEVELOPMENT) DESIGNATION.
COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
There being no further business, COMMISSIONER KREGER MOVED TO ADJOURN THE
MEETING. COMMISSIONER EBERLEY SECONDED THE MOTION. THE MOTION CARRIED 5-0.
The meeting of the Elk River Planning Commission adjourned at approximately 12:40 a.m.
.
Respectfully submitted,
(J'I
/djIJ00_~ )/1. IJ{~m ,PJ
Catherine M. Schmidt
Recording Secretary
.