03-31-1992 PC MIN
.
.
.
MINUTES OF THE ELK RIVER PLANNING COMMISSION
SPECIAL MEETING
HELD AT THE ELK RIVER CITY HALL
MARCH 31, 1992
Members Present:
Chairman Nadeau, Commissioners spotts, Eberley, Minton,
Tveite, and VanValkenburg
Members Absent:
Commissioner Johnson
Staff Present:
Stephen Rohlf, Building and Zoning Administrator
1. Pursuant to due call and notice thereof; the special meeting of the Elk
River Planning Commission was called to order at 7:00 p.m.
2. Consider 3/31/92 Planning Commission Agenda
The items on the 3/31/92 special Planning Commission meeting are those
items that were tabled from the 3/24/92 regular Planning Commission
meeting. The agenda was approved.
3. Consider a Zone Change, Land Use Map Amendment, Variances, Preliminary
Plat, (Hillside Estates) and Conditional Use Permit by Rick Foster of
Oxbow Properties/P.H.
Chairman Nadeau opened the discussion
proposed 53 acre development by Mr.
residential and commericial uses.
on this item in regards to a
Foster containing a mix of
Mr. Rohlf indicated that, as agreed to by the developer at the March
24, 1992 meeting, revisions were made to the residential portions of
the preliminary plat. The new average single family lot size as revised
is approximately 18,000 square feet per lot. Mr. Rohlf displayed a
graphic at this time illustrating the wooded areas left after grading
in the plat.
The revisions in the residential portion of the plat left a
trees between it and the commerical portion of the plat.
was held regarding whether a berm or fence would further be
buffer the residential area from the commerical area. It
this discussion would be foregone until the conditional use
the commericial portion.
buffer of
Discussion
needed to
was decided
permit on
Commission Minton questioned Lot 10, Block 1 of the residential portion
of the plat. Due to grading for the roads, this lot would be basically
treeless.
Commissioner spotts indicated that the existing trees on this lot were
basically scrub. Mr. Foster stated that he would make minor
adjustments at time of grading to try and save individual trees on all
lots. Mr. Rohlf indicated that minor changes are one thing, but the
grading plan as approved must be adhered to or changes approved by
staff.
Planning Commission Minutes
March 31, 1992
Page 2
.
Commissioner Minton indicated that the revised plat addressed the
concerns that the Planning Commission brought up at the March 24, 1992
meeting. He indicated that the Planning Commission was left with one
question, is the approximately 18,000 square foot average lot size
adequate or not?
Commissioner Eberley was concerned with the cutting of trees and
grading on the commerical portion of the site. Her concerns centered
on what that site would look like between the time when it was first
graded and finally developed. It was the consensus of the Planning
Commission that the soils on this portion should be stabilized with
grass and that the developer should care for this grass until it was
self-sustaining or the site was developed.
The Planning Commission discussed whether the public hearing was closed
at the March 24, 1992 meeting or not. At this time, Commission Nadeau
asked for public comments, receiving none he closed the public hearing
on all the requests by Mr. Foster.
3.1
Zone Change
.
COMMISSIONER SPOTTS MOVED TO RECOMMEND TO REZONE THE ENTIRE 53 ACRES
FROM R-1E/SINGLE FAMILY TO PUD/PLANNED UNIT DEVELOPMENT: CITING THE
FINDING THAT THE FLEXIBILITY PROVIDED BY THE PUD ZONING DESIGNATION WAS
NEEDED TO DEVELOP THIS PARCEL. COMMISSIONER EBERLEY SECONDED THE
MOTION. THE MOTION PASSED 6-0.
3.2
Land Use Change
COMMISSIONER SPOTTS MOVED TO RECOMMEND CHANGE IN THE LAND USE
DESIGNATION ON THE WESTERN 13 PLUS ACRES OF THE PARCEL IN QUESTION FROM
MR/MEDIUM DENSITY RESIDENTIAL TO HB/HIGHWAY COMMERICAL CITING THE
FINDINGS IN STAFF'S MEMO DATED MARCH 19, 1992. COMMISSIONER MINTON
SECONDED THE MOTION. THE MOTION CARRIED 6-0.
3.3 Variances
Discussion took place regarding a temporary connection of Baldwin
Street from 192nd Avenue in Deerfield 3rd to 193rd Avenue in the
proposed plat to alleviate concerns with the length of Carson Circle.
Mr. Foster indicated that he could include the area adjacent to the
above mentioned roadways in the first phase. It would make the
temporary connection discussed a permanent roadway. This would
eliminate concerns with who would maintain it. It was the consensus of
the Planning Commission to accept this phasing change contingent upon
the City Engineer determining an adequate water supply was available.
.
COMMISSIONER SPOTTS MOVED TO RECOMMEND APPROVAL OF THE VARIANCES ON THE
LENGTH OF DEAD-END ROADS AS DRAWN ON THE PRELIMINARY PLAT CITING THE
FINDINGS OF FACT IN STAFF'S MARCH 19, 1992 MEMO WITH 193RD AVENUE'S
VARIANCE BEING CONTINGENT UPON BWSR'S REVIEW. COMMISSIONER MINTON
SECONDED THE MOTION. THE MOTION PASSED 6-0.
.
.
.
Planning Commission Minutes
March 31, 1992
Page 3
3.4 Preliminary Plat
The Planning Commission discussed the various possible changes to the
preliminary plat if MnDOT would not allow grading within the
right-of-way of Highway 169 for Evans street. It was the consensus of
the Planning Commission that adjustments to the right-of-way of Evans
Avenue due to MnDOT not allowing grading in their right-of-way should
not trigger the plat back to the Planning Commission. Further
discussion took place regarding the elimination of Dodge Court and the
rearrangement of the lots in that area. Also the enlarging of the
first phase of the plat to accommodate Baldwin connection from 192nd
Avenue to 193rd Avenue was discussed. It was the consensus of the
Planning Commission that both of these changes did not need to be
further reviewed by the Planning Commission.
COMMISSIONER SPOTTS MOVED TO RECOMMENDED APPROVAL OF THE PRELIMINARY
PLAT OF HILLSIDE ESTATES WITH THE FOLLOWING CONDITIONS:
1. That the preliminary plat approval is contingent upon variances
being granted for the lengths of the dead-end roads.
2.
That preliminary plat approval of Phase II is contingent upon the
approval of a conditional use permit for the commercial portion
prior to final plat approval. Also, that a PUD Agreement
reflecting the stipulations of the plat approval is established
and entered into prior to recording any phases of this plat.
3. That preliminary plat approval is contingent upon a zone change
being granted to PUD.
4. That preliminary plat approval is contingent upon MnDOT's review
and approval.
5. That preliminary plat approval of Phase II is contingent upon
BWSR's approval for filling of a wetland.
6. SEWER AND WATER
a. That preliminary plat approval of phase II of this plat is
contingent upon trunk lines being extended to this area to
provide sewer and water.
b. That the City engineer does the design for the sewer and
water laterals within this plat.
c. That the laterals in the first phase fit in with the long
range plans for sewer and water for this area.
d.
That the first phase of this development pay it share of the
assessment for the long range trunk sewer and water lines as
estimated in the Feasibility Study for this area. Further
that this assessment is paid up front or as lots sell with
some limit to the total payment.
.
.
.
Planning Commission Minutes
March 31, 1992
Page 4
e.
That the first phase be allowed to temporarily connect to
sewer and water through Deerfield 3rd Addition. Further,
that the developers is responsible for all costs for this
temporary connection and hooking up to the permanent lines in
the future. Lastly, that no credit is given against the
assessment for the long range trunk facilities for temporary
improvements that do not fit in with the long range plan.
7. DRAINAGE
a.
That the developer
calculations for the
ponds.
drainage
holding
provide the necessary storm
proper sizing of storm pipes and
b. That if outlets are needed for storm holding ponds, the
developer must secure the easements.
c. That swales needed for drainage are accomplished by the
developer during the road grading.
d. That storm drainage plans are finalized and acceptable to
City staff prior to final plat review.
8. STREETS
a.
That the driving surface of 193rd Avenue through
residential portion of the plat be 44 ft. wide.
the
b. That the configuration of the driving lanes and turn lanes
through the commerical portion of 193rd is resolved prior to
final plat approval.
c. That the right-of-way for Evans Avenue is 80 ft. wide, the
driving surface 46 ft. wide, and Evans is provided with
barrier concrete curb and gutter.
d. That 193rd Avenue be a through street with all other streets
intersecting it being provided with stop signs. Further,
that all signage within the plat is the responsibility of the
developer.
e.
That all the residential streets within the
193rd be 32 feet wide to face of curb to
surmountable concrete curb and gutter.
plat other than
face of curb with
f.
That
for
plat
the developer provide the necessary temporary easements
the temporary cul-de-sacs within the plat prior to final
approval.
g.
That all final plans for streets within the plat be approved
by the City Engineer prior to final plat approval.
.
.
.
Planning commission Minutes
March 31, 1992
Page 5
h.
That a small unattached triangle of property in the southwest
corner of the intersection of 193rd Avenue and Dodge Street
be eliminated.
i.
lots utilizing 193rd Avenue for access are required
turnaround within the lot to avoid backing into the
Further that this requirement be identified in the
agreement for the lots.
That all
to have a
street.
purchase
9. STREET LIGHTS
The Planning Commission recommended street lights in the following
locations:
a. The north end of Evans Avenue.
b. The northwest corner of the intersection of 193rd Avenue and
Evans Street.
c. The north end of Dodge Street.
d. In the northwest corner of the intersection of Dodge Street
and 193rd Avenue.
e.
In the northeast corner of the intersection of Carson Circle
and 193rd Avenue.
f. On the north end of Carson Circle.
g. In the northwest corner of the intersection of 193rd Avenue
and Baldwin Street.
h. The north end of Carson Street.
i. In the northeast corner of the intersection of Auburn Street
and 193rd Avenue.
j. On the north end of Baldwin Street.
10. PARK DEDICATION
That the developer pay $350 per
(specific recommendations will
Commission).
for park dedication fees
coming from the Park and Rec.
lot
be
11. That slopes of 30% or more are protected by easements in favor of
the City that allow no cutting of vegetation except for disease
control, as approved by staff.
12. That the easement for the powerline on the east side of the plat
is defined prior to final plat.
13. That the locations of stump burying sites are identified, approved
by staff, and protected by easements prior to final plat approval.
Planning Commission Minutes
March 31, 1992
Page 6
.
14. That, as proposed by the developer, the services of a forester are
retained to determined what trees must be removed for road and
house construction. Also, that trees that are to be saved be
fenced, flagged or roped off at the drip line to avoid mechanical
damage. Further, that no grading or filling with heavy equipment
be allowed over the root area of the trees that are to be saved.
Lastly, that the authority of the forester to make decisions on
trees during house construction is established through the
purchase agreement on the lots and the covenants for the plat.
15.
That the
in size
from the
property
minimum size lot within this plat is 10,000 square feet
with 80 ft. of frontage. Also, that setbacks are 30 ft.
front property line, and 10 ft. from the side and rear
lines.
16. That a Developers Agreement and Letter of Credit for the
improvements in the first phase are established for this plat.
Further, that the developer has one year from the date of final
plat approval for the completion of the improvements within the
first phase. Lastly, that asbuilts are provided for these
improvements.
.
17. That a development plan for house sites is approved by staff prior
to final plat approval of either phase. Also, that the soil
borings (locations determined by staff) are accomplished to
determine lowest floor elevations.
18. That the developer pay $7,500 for his share of the stop light to
be located at the intersection of 193rd Avenue and Highway 169
prior to recording the commerical portion of this plat.
19. That prior to final plat review of the first phase, the developer
reimburse the City for the cost of reviewing both phases of the
plat to that point.
20. That the temporary cul-de-sacs be provided with bituminous berms.
21. That the developer provide an Escrow Account or Letter of Credit
to cover the estimated cost for the City Engineer to prepare plans
and specs for the improvements within this plat prior to that work
commencing.
22.
That after grading of the commerical area
is immediately established with grass
developer until it is self sustaining.
of this plat, that area
that is cared for by the
The Planning Commission
Avenue, due to MnDOT
Highway 169, would not
Planning Commission.
further indicated that adjustments to Evans
not allowing grading within the right-of-way of
trigger the preliminary plat back to the
.
COMMISSIONER MINTON SECONDED THE MOTION. THE MOTION CARRIED 6-0.
E. CONDITIONAL USE PERMITS
.
.
.
Planning Commission Minutes
March 31, 1992
Page 7
COMMISSIONER TVEITE MOVED TO TABLE THE CONDITIONAL USE PERMIT ON THE
COMMERCIAL PORTION OF THE PLAT UNTIL A SPECIFIC SITE PLAN IS AVAILABLE
FOR REVIEW. COMMISSIONER SPOTTS SECONDED THE MOTION. THE MOTION
CARRIED 6-0.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF THE CONDITIONAL USE
PERMIT FOR THE RESIDENTIAL PORTION OF THE PLAT WITH THE SAME
STIPULATIONS CONTAINED IN THE PLANNING COMMISSION'S RECOMMENDATIONS ON
THE PRELIMINARY PLAT AND A SPECIFIC LOT BY LOT DEVELOPMENT PLAN BEING
APPROVED BY STAFF PRIOR TO FINAL PLAT APPROVAL. HE SITED THE FINDING
OF FACT FOR APPROVAL THAT THE REQUEST MEET THE SEVEN STANDARDS FOR
APPROVING A CONDITIONAL PERMIT. COMMISSIONER SPOTTS SECONDED THE
MOTION. THE MOTION CARRIED 6-0.
4. Consider Ordinance Amendment/Section 900.20(6)/General
Regulations-Vision and Clearance (Fences) By the City of Elk River/P.H.
Mr. Rohlf introduced this item.
to enforce an ordinance with
"workmanlike", and "reasonable".
somewhat abstract concepts.
He indicated his concern with trying
language that contained words such as
Mr. Rohlf felt that these were
COMMISSIONER MINTON MOVED TO APPROVE THE VERSION OF THE ORDINANCE
AMENDMENT SUPPLIED BY THE CITY ATTORNEY WITH THE FOLLOWING CHANGES:
1.
THE PLANNING COMMISSION RECOMMEND WORDS COMPLETE AND SUBSTANTIAL
BE ADDED AND "WORKMANLIKE" BE ELIMINATED.
iii. THE PLANNING COMMISSION ADDED BARBLESS WIRE TO THE LIST OF FENCES
PROHIBITED IN RESIDENTIAL AREAS.
COMMISSIONER EBERLEY SECONDED THE MOTION. THE MOTION CARRIED 6-0.
5. Proposed Modifications to TIF Plans No. 1 and No. 3 for Review and
Comment
The Planning Commission discussed the proposed amendments to the TIF
plan and the fact that part of the excess funds would be spent within a
City Park. It was the consensus of the Planning Commission that the
modifications to plan No. 1 and 3 did not contradict the City's
Comprehensive Plan. They appreciated the opportunity to review this.
6. Consider Ordinance Amendment to Growth Management Plan and Official
Map By the City of Elk River/P.H.
Steve Rohlf indicated that this item should be tabled. His rationale
for tabling this issue was the need for staff to discuss whether an
official map with an actual surveyed centered line is appropriate or
just an amendment to the City's Comprehensive Plan. He went into the
pros and cons of both ways of identifying a proposed future roadway.
COMMISSIONER TVEITE MOVED TO TABLE
COMMISSIONER EBERLEY SECONDED THE MOTION.
THIS ITEM INDEFINITELY.
THE MOTION CARRIED 6-0.
.
.
.
Planning Commission Minutes
March 31, 1992
Page 8
7.
other Business
The Planning Commission discussed the following items under other
business:
The Planning Commission Work Goals
Mr. Rohlf indicated that the City Council would like the Planning
Commission to review the sign ordinance regarding whether or not
signage should be based on the size of the building. Specifically
whether large commerical and industrial buildings should have greater
latitude with the size of their freestanding and wall signage. The
Planning Commission agreed to add this to their work plan.
Discussion was held regarding what role the Planning Commission would
have with revisiting the downtown development Plan. It was the
consensus of the Planning Commission they should work with the downtown
redevelopment group, if that group desired them to. The Planning
Commission further requested that Mr. Rohlf provided them with the
Governor's Design Team information to aid them in their review.
COMMISSIONER MINTON MOVED TO APPROVE THE PLANNING COMMISSION WORK
AS REVISED. COMMISSIONER VANVALKENBURG SECONDED THE MOTION.
MOTION PASSED 6-0.
PLAN
THE
8.
Adjournment
There being no further business, COMMISSIONER EBERLEY MOVED
THE MEETING. COMMISSIONER MINTON SECONDED THE MOTION.
CARRIED 6-0.
TO ADJOURN
THE MOTION
The meeting of the Elk River Planning Commission adjourned at approximately
10:00 p.m.
~"Y submitted,
~1(rU/
Stephen Rohlf .-,
B&Z Administrator