7.1. SR 09-19-2005 Item# 7.l MEMORANDUM TO: Mayor and City Council FROM: Phil Hals, Street Department Superintendent DATE: September 19,2005 SUBJECT: Salt/Sand Storage Building TIle City received bids on July 14, 2005 for a cast in place concrete "\valled salt/ sand storage building with lnetal roof system, llo\ve~ler all bids \vere rejected since dle lo\vest bid \vas $268,000 or $118,000 o\Ter budget. Staff re\Tie\ved other options and concluded tllat the most economical and functional structure \vould be a fabric CO\Tered roof \vitll concrete salt/ sand retaining \valls. T\vo companies submitted the follo\ving bids for a fabric covered salt/ sand storage building on i\ugust 12, 2005: Greystone Construction Base Bid $ 90,435 Alternate 1 Building \v / T -panels $137,725 Alternate 2 Building \v / Cast in Place \'V'alls $159,980 Ebert Construction 122,900 168,500 230,900 Staff recommends accepting tlle Greystone Construction bid for "Alternate 2" \vhich includes dle cast in place foundation and \vall system for tile salt/ sand retention. TIle T- panels are $22,255 less expensiv-e, but also pro\ride 180/0 less storage area. The cast in place \valls \vill pro,ride more protection for dle fabric from ground le,Tel damage. The building \vill be 100 feet long, 80 feet \vide \vith the poured concrete \vall of 10 feet and the arcll lleight of 35 feet for a total of 45 feet, \vlucll is allo\ved by ordinance in tills zone. Recommendation: Staff recommends tllat Council appro\Te the bid froin Greystone Constluction for the 80' by 108' fabric cO\Tered salt/ sand storage building including "i\lternate 2" for the cast in place concrete \valls for a total cost of$159,980.