10-21-1986 PC MIN
.
.
.
SPECIAL MEETING OF THE ELK RIVER PLANNING COMMISSION
HELD AT VANDENBERGE JR. HIGH SCHOOL GYMNASIUM
TUESDAY, OCTOBER 21, 1986
Members Present: Chairman Wilson, Commissioners Kropuenski, Barrett
Temple, Fuchs and Morton
Members Absent: None
Staff Present: Stephen Rohlf, Building and Zoning Administrator; David
Sellergren; City Attorney; Terry Maurer, City Engineer
John Klovning; Consultant, Kay Kruse, Stanton, Consultant's
Assistant
Proposed aDF Plant Conditional Use and Variance Request/Public Hearing
1. The meeting was called to order at 7:00 p.m. by Chairman Wilson.
Commissioner Kropuenske made an announcement to the group that the
Governor's Design Team would be in Elk River October 24th and 25th at the
Elk River Senior High School at 7:00 p.m.
Chairman Wilson introduced the City Staff, members of the Planning
Commission, and City Consultants.
It was noted that on Page 3 of the staff's memo to the Planning
Commission, Item 5, the date for the solid waste permit hearing should be
October 28, not October 21.
Chairman Tral1e- explained that the format for the discussion would be as
follows:
1. Address the five site plans presented by NSP.
2. Comments and questions from the Planning Commission staff and public
on each individual site plan.
3. Review of the conditional use permit and variance.
4. Comments and questions from the Planning Commission, staff and
public.
Mr. Don Chmiel, Senior Permitting Consultant for NSP explained the
reasons why they chose the site on 165th Avenue, as follows:
1. Properly zoned for proposed use.
2. Access to major highway.
3. Adequate size parcel (37 acres).
4. Price of land reasonable.
5. Within union jurisdiction.
6. Close proximity to burn facility.
7. Lower transportation costs.
.
.
.
Page 2
Planning Commission Minutes
October 21, 1986
Mr. Chmiel stated that the environmental concerns were addressed in the
EIS (Environmental Impact Study) such as traffic, odor, noise abatement,
etc., and that they feel they have developed a plan which will alleviate
those concerns. Mr. Chmiel commented that the Elk River plant is
designed after their Baltimore, Maryland plant and that some improvements
have been included to make this the best facility possible using the most
up-to-date technology.
The site plan for Resource Recovery Facility were reviewed and discussed
as follows:
1. Landscape Plan
Chairman Wilson opened the public hearing at this time.
Mr. Chmiel reviewed the landscape plan. No comments from those present
were made at this time.
2.
Signs. Electric and Gas
Mr. Chmiel explained where the following signs would be placed; stop
signs, parking area designations including handicapped, emergency,
handling area, ingress and egress. He stated that the total amount of
signage would be 362 square feet including a 12 ft. by 8 ft. exterior
sign for Anoka County Resource Recovery Facility, a 12 ft. by 8 ft. sign
to show where the citizens drop off would be. and 5 ft. by 3 ft. signs
showing visitor parking and receiving building. Mr. Chmiel stated that
the signs would be metal and non-illuminated.
3.
Ingress and Egress
Mr. Chmiel explained the routing of traffic through the proposed facility
including the primary entrance, emergency second entrance, citizens
refuse disposal area, and receiving area. Mr. Chmiel stated that the
proposed receiving building will be 160 ft. by 360 ft. long, the
processing building will be 125 ft. by 344 ft. long, the administration
building will be 83 ft. by 112 ft. long, the service building will be 83
ft. by 120 ft. long and the transfer station will be 83 ft. by 75 ft.
long.
Mr. Chmiel stated that there will be 165 parking spaces for employees and
visitors. He further explained where the hot load area, fire
protection, water storage, well and drainfie1d areas will be.
Mr. Rohlf
lane on
questioned
165th was
whether or not the proposed widening for a bypass
acceptable to Terry Maurer, City Engineer.
.
.
.
Page 3
Planning Commission Minutes
October 21, 1986
Commissioner Kropuenske asked what the water storage capacity would be
for fire protection. and was told 200.000 gallons by Mr. Chmiel.
Discussion was carried on regarding the possibility of a fire in the
proposed facility, the probability that a pumper truck would not be able
to keep up emptying the 10,000 gallon wash water holding tank
whether or not the site would be able to retain the large quantity
of water that may be needed to fight a fire. and what level of
contamination. water running off the property would have.
Mr. Peter
that from
fire and a
Jones of NSP stated that he felt this was not a serious issue;
a practical aspect these would be a very low probability for
very low probability of contamination.
4. Building Elevation
Mr. Chmiel stated that a variance is needed because the building height
will exceed the City Ordinance's maximum allowance by 24 to 30 feet.
He explained that a 53 ft. long segment of the processing plant (the
flail mill area) will reach a height of approximately 64 ft. 8 inches and
further. that the solid waste receiving building would reach a height of
52 ft. 8 inches.
Commissioner Fuchs questioned what the type of construction material
would be. Mr. Norm Schiefe1 stated that the building would be all steel
with steel I-Beams. Commissioner Fuchs further questioned what the
likelihood for fire would be. Mr. Norm Schiefe1 stated that there would
be very little combustible material and low probability for fire.
Mr. Chmiel stated that depending on which contractor received the bid
award, at this time there is a 10 inch to 6 foot difference in the
possible maximum height of the building and that a variance for a maximum
of 70 ft. 8 inches would cover the issue.
Further discussion was carried on regarding fire protection measures.
Mr. Chmiel stated that the flail mill area would be protected by both
he10n and sprinklers. Mr. Chmiel commented that the Baltimore
facility has been approved by the State Fire Marshal and this facility
will be build like it.
5. Drainage Plan
Mr. Chmiel explained the flow and flow containment and how the contours
will be designed to direct flows back to the retention pond.
Mr. Terry Maurer stated that he had just recieved this evening. the
calculations and information he had requested from NSP on the drainage
and will not be able to make a judgement at this time whether or not the
information is adequate. He also stated that just from paging through
the documents. it appears his questions and concerns have been answered.
.
.
.
Page 4
Planning Commission Minutes
October 21, 1986
----------------------------
Discussion was carried on regarding the underground water flow toward the
river. the probability of the retention pond becoming full and
discharging onto Mr. Specht's property, and what the potential for
groundwater pollution on would be.
Mr. K10vning stated that with the remote likelihood of a fire occurring;
this facility is planned to have a better means of containment for water
than the Baltimore facility.
Mr. Jones stated
problem, but that
amount of time
taken.
that he
they felt
and that
realized that an overflow could be a serious
they could recapture the site in a reasonable
they would insure that proper action would be
Mr. Rohlf expressed his concerns for the volume of water that is likely
to run off onto Mr. Specht's property on occasion
Mr. Jones suggested that approval of this item could be contingent upon
the City Engineer's approval and that perhaps the City Engineer could
meet with their (NSP's) engineer to resolve this issue.
Mr. Tom Woods, representing himself and the concerned citizens group.
expressed his concern that the likelihood of fire is much greater than
the City is being told it is. Mr. Woods reviewed statistics for
shutdowns of RDF facilities taken from a 1984 Waste Age survey.
Mr. Peter Vanderpool questioned Mr. Wood's information; whether it was a
survey of National or International RDF facilities. and the time frame of
the shutdowns-minutes, hours, days and whether the shutdowns were
temporary or permanent.
Mr. Gene Haas, Superintendent of the proposed plant, stated that he felt
there was a very low probability for fire. He stated that if a fire was
to occur, he agreed that there would be a great deal of water, but that
the severity of the fire would depend on how much material was in the
building at the time and where in the building the fire occurred. He
further stated that no building is designed to handle a large quantity of
water, but felt that the apron conversion pits would handle some of the
water. Mr. Haas stated that it would not be feasible to have a drain
system because the MSW would plug up any drain. Mr. Haas further stated
that contamination of run off water would be minimal as the outside area
will be kept very clean with a type of dry cleaning compound and swept up
with a sweeper.
.
.
.
Page 5
Planning Commission Minutes
October 21, 1986
DRAFT CONDITIONAL USE PERMIT
Mr. Se11ergren gave a brief history of the conditional use process from
the first draft to the present 3rd draft. which is the result of meetings
among city staff. Mr. K10vning. Ms. Kruse. Stantion, and himself. Mr.
Se11ergren then reviewed the highlights of the draft CUP itself for the
Planning Commission. staff and audience present.
Mr. Roger Miller, Attorney representing NSP. then expressed the following
comments:
The scope of permit is over-extended. Some of the conditions imposed
affect the processing plant unfairly. since it is tied to the generating
operation. NSP objects to permit language which ties the processing
facility with the UPA generating facility. NSP feels that the City
ordinance and laws of this State do not grant the City the authority to
impose the conditions on the processing plant and on the UPA plant as
well. They feel that the second "Whereas" should be deleted because it
is not within the rights of the City to include it.
Mr. Miller offered his comments on "Exhibit A - Conditional Use Permit"
items as follows:
Item 1-
he feels
processing
The description of the facility includes the generating plant.
the City has no lawful authority at a site other than the
site for This permit.
Item 6.
This item should only include the processing facility.
Item 7.
include the
park vehicles
The permittee obj ects to the term "Facility" as it would
generating facility. also. that they should be able to
on adjacent land. if they own the land.
Item 10. Mr. Miller stated that he believes the intent is to control
trucks hauling MSW, but as the language now stands, it would cause
problems for their trucks hauling the RDF and rejects. He explained that
the State has denied them an access from 169 and if the City denies them
the use of Main Street, they will be denying them access to the power
plant.
Item 11. The
rejects be from
keep the facility
permittee is
4:00 am to
clean and to
requesting that the hours for transporting
8:00 pm., to allow them the opportunity to
get into the landfill.
Item
could
12. This item should only apply to the process facility. or they
not wash any trucks at UPA if the generating facility is included.
Item 16. The definitions should be clarified as follows:
a.
north should be east
should read "one half mile east on Hwy. 10" from intersection of
165th
b.
.
.
.
Page 6
Planning Commission Minutes
October 21. 1986
Item 17. This item should include only roads associated with the
processing facility.
Item 20. "Residue" should be deleted. City should waive disposal; is
adequately regulated by the landfill.
Item 21A. Permittee asks that a maximum of $30.000 be required for these
costs.
B. Should be "Processing Facility" not "Facility". Mr. Miller
explained that they understood the hold harmless clause was included
primarily because of the height encroachment, but did not feel they
should indenmify the city for acts of negligence. ommission. or
willful activities.
C. The permittee does not feel it is appropriate to release the City in
this manner and they are not prepared to waive their rights.
D. The Permitte questions the costs of enforcement. They believe it is
appropriate to charge for permit costs and litigation costs for
consultants and attorney fees. within reason.
Item 24. Mr. Miller stated that they object to the language g~v~ng the City
the right to revoke. amend. or impose additional conditions.
Discussion was carried on regarding access to the UPA generating site.
It was explained that UPA wished to construct a frontage road along the
west side of Highway #169 to UPA and trucks would be traveling 300 ft.
west on Main Street to access the proposed frontage road.
Mr. Sel1ergren explained the City's position that the processing plant.
burn facility and truck movement should all be considered integral parts
of the RDF process and included in the conditional use permit. Mr.
Se11ergren stated that on the basis described, he felt the position would
be legally defensible. if challenged.
Mr. Tom Woods stated that a petition with 600 signatures has been
presented to the City opposing the proposed RDF facility and burning
plant. He explained that he believed the two operations should be
considered jointly and that the attempt to separate them was a move to
avoid local control. Mr. Woods stated that they (the citizen's group)
felt that issuance of a permit would be in violation of the City's
Ordinance. and the proposed RDF facility would endanger and injure its
citizens. would have a detrimental affect on the community, and would
affect the citizen's rights to use and enjoy their property. He also
cited there would be violations regarding traffic. dust. odor. etc.
.
.
.
Page 7
Planning Commission Minutes
October 21. 1986
Mr. Woods expressed his concern over pollutants. expecially dioxins. Mr.
Woods stated that he felt the site was the worst possible location for
such a facility because the area is lower than surrounding areas. He
felt this would create maximum air pollution in an area that is a home
and market garden area. Mr. Woods cited comments of a Danish study
regarding the negative impact of dioxins created by RDF. He further
stated that he felt the permit should be delayed until more study could
be done regarding dioxins.
Mr. Woods concluded that Anoka County. NSP and UPA selected the site and
the City was disinfranchised, and further. that (1) they don't want the
involvement of the citizen's of Elk River (2) they don't want to pay if
there are problems (3) they don't want the City to have the power to shut
them down. and finally. that he finds the proposal unacceptable and asks
that the City deny the permit.
Mrs. Marlene Hentges expressed her concern regarding the negative traffic
conditions which would be created by issuing the permit and allowing the
facility to be built.
Commissioner
burn plant
operation.
Barrett expressed his
and traffic movement
support that the processing plant.
should be considered as part of one
Discussion was carried on regarding
where distinction needed to be
generating facilities.
points of clarification in the permit
made between the processing and the
Mr. Se11ergren stated that the following clarification could be made at
this time.
Item 6 - line 4 - insert the word "processing" before facility.
Item 7 - last line - insert the word "on" after "or". and add the words
"not owned by permittee" after the word lands".
Item 10 - line 1 - after the word "all" insert "MSW".
Item 11 line 1 delete the word "rejects", and also. that the
following be added "Rejects may be transported between the hours of 4:00
am and 8: 00 pm."
Item 12 - line 1 - Insert the word "processing" before facility". Also
the following sentence should be added. "No RDF or Residue trucks may be
washed at the burns facility."
Item 16 line 3 - "East" should be inserted in place of "north". and
line 5 - "on Highway 1110" should be added after the word "east".
Item 17 - line 3 - insert the word "processing" before the word facility"
in each instance.
Page 8
Planning Commission Minutes
October 21, 1986
.
Discussion was carried on regarding the conditions of the permit.
Further discussion was caried on regarding truck access to UPA and the
number of trucks travelling there.
Discussion of the PCA permit followed. as well as discussion of the
likelihood of a shutdown if a violation occurred.
emou SnONlR FUCHS MOVED TO TABLE A MOTION TO RECOMMEND THAT THE CITY
COUNCIL GRANT THE CONDITIONAL USE PERMIT AND VARIANCE REQUEST FOR THE RDF
FACILITY UNTIL A 4TH DRAFT OF THE PERMIT INCORPORATING THE CHANGES AND
CONCERNS ADDRESSED AT THIS MEETING HAS BEEN RECEIVED AND REVIEWED BY THE
PLANNING COMMISSION AND CITY STAFF. COMMISSIONER MORTON SECONDED THE
MOTION. THE MOTION PASSED 6-0.
November 12, 1986 was established as the date for continuation of the
public hearing.
There being no further business. COMMISSIONER FUCHS MOVED THAT THE
MEETING BE ADJOURNED. COMMISSIONER BARRETT SECONDED THE MOTION. THE
MOTION PASSED 6-0.
The meeting adjourned at 10:27 p.m.
. Respectfully submitted.
J)~oiWL ,{J~
Deborah Kleckner ~
Recording Secretary
.