Loading...
LEACHATE_13COE O E OE OEOEOEOEO E O E OE O E OE O E OE O E OE O E O E O E O E F F F F EDGE OF WATEREDGE OF WATER EDGE OF WATER AS P HA L T G R AV E L GR A V E L GR A V E L G R A V E L ASPHALT SB960 965 965 961 96 1961962 962 962 963 963963964 964 966 966 967 967 968 968 969 9 6 0 9 57 9 5 8 9 5 9 9 6 1 9 5 5 9 6 0 9 5 4 9 5 6 9 5 7 9 5 8 9 5 9 9 6 1 9 5 5 9 6 0 9 5 4 95 6 95 7 9 5 8 9 5 9 9 6 1 96 2 955954 9569579589559 6 0 9549569 5 795 8959 9 6 1 960 957 958 959 965 961962963 964 960 960961955954 956957958 959 959 956 957 958 959 965 962 963 964 966 967 9 6 0 9 5 6 9 5 7 95 8 9 5 9 9 6 1 955954 956957 960 959 957 958 960 957 957 958 958959 961 P A P A P A PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PAPAPAPAPAPAPAPAPAPAPA PA PA PA PA PA PA PA PA 96 1 962961 9 6 2 960 965PA PA PA PA PA >>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > > >>>>XXXX >>>>>>>>>>>>>>>XXXXXXX Xl ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll ll ll lSHEET DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2019, All Rights ReservedcH:\WASTEMAN_PR\R16115896\CAD\C3D\115896C201.dwg 3/1/2019 4:02:53 PMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. REVISION DATENO. R 7533 SUNWOOD DR NW, SUITE 206 RAMSEY, MINNESOTA 55303 Phone: (763) 433-2851 Email: Ramsey@bolton-menk.com www.bolton-menk.com OF Kevin F. Bittner21814 03/01/2019 ELK RIVER LANDFILL INC. WASTE WATER FORCEMAIN KFB KGA KFB R16.115896 46 R PARKING LOT EROSION CONTROLFEETSCALE 0 15 30 LS 1 VV2 2 1 S T A V E N U E NW GREAT NORTHERN CORRIDOR TRAIL 12 DITCH CHECK - BIOLOG DITCH CHECK - BIOLOG PROTECT EXISTING WETLAND STABILIZED DITCH CHECK - BIOLOG PREASSEMBLED SILT FENCE EROSION CONTROL BLANKET EROSION CONTROL LEGEND EXISTING/PROPOSED PACONSTRUCTION EXIT DRAINAGE FLOW GRADING LIMITS BITUMINOUS PAVING CONTRACTOR: Minger Construction RECORD PLAN ZGN 12-22-2020