LEACHATE_15SHEET
DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2019, All Rights ReservedcH:\WASTEMAN_PR\R16115896\CAD\C3D\115896C201.dwg 3/1/2019 4:37:06 PMDESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
REVISION DATENO.
R
7533 SUNWOOD DR NW, SUITE 206
RAMSEY, MINNESOTA 55303
Phone: (763) 433-2851
Email: Ramsey@bolton-menk.comwww.bolton-menk.com
OF
Kevin F. Bittner
21814 03/01/2019
ELK RIVER LANDFILL INC.
WASTE WATER FORCEMAIN
KFB
KGA
KFB
R16.115896 46
STORMWATER
POLLUTION PREVENTION
PLAN (SWPPP)
PERMANENT STORMWATER MANAGEMENT SYSTEM:
Type of storm water management used if more than 1 acre of new impervious surface is created:
DOCUMENT RETENTION
The following documentation will be retained for a period of not less than 3-years from the date of submittal of the
NOT in compliance with Part III.E of the Permit.
1.The final SWPPP
2.Copies of all stormwater related permits required for the project
3.Records of all inspection and maintenance conducted during construction
4.Copies of all permanent operation and maintenance agreements; including all right‐of‐way, contracts,
covenants and other binding requirements regarding perpetual maintenance, and
5.All required calculations for design of the temporary and permanent BMPs.
PROJECTLOCATION
1-MILEBOUNDARY
RECEIVINGWATERS
WASTE WATER FORCEMAIN
CITY OF ELK RIVER
SHERBURNE COUNTY, MINNESOTA
PROJECT LOCATION:
RECEIVING WATERS:
Receiving waters, including surface water, wetlands, Public Waters, and stormwater ponds, are identified on the USGS 7.5 min quad map
within one mile of the project boundary. Receiving waters that are impaired, the impairment, and WLA are listed as follows. All specific
BMPs relative to construction activities listed in this permit for special and impaired waters have been incorporated into this plan. All
specific BMPs listed in approved TMDLs and those BMPs listed for construction related waste load allocations have also been incorporated.
DESCRIPTION OF CONSTRUCTION ACTIVITIES AND STORMWATER MANAGEMENT:
Construction activities include: trenchless forcemain, lift station, parking area, temporary erosion and sediment
control, and permanent stabilization.
The proposed project is to construct a lift station and wastewater forcemain to convey the landfill leachate to the Elk
River wastewater treatment system.
The existing drainage will not be modified due to construction related activities. The majority of the project will be
constructed using trenchless technology. The open trench locations are shown in the above figure.IMPLEMENTATION SCHEDULE AND PHASING: The Contractor is required to provide an updated schedule and site management plan
meeting the minimum requirements of Section 1717.2.C and 1717.2.D of the Minnesota 2016 Standard Specifications.
1)Submit SWPPP Updates to Engineer. Submittal shall include any requested changes to the SWPPP, including but not limited to:
Trained Personnel, Locations for Stockpiles, Concrete Washout, Sanitation Facilities, Types and Locations of Erosion &
Sediment Control. Failure to submit updates shall be considered acceptance of the SWPPP as designed with no changes.
2)Install perimeter sediment control, inlet protection, and construction exit.
3)Install trenchless forcemain, pretect all access pits with erosion control measures
4)Install lift station
5)connect existing pipes to new wastewater system
6)Add additional temporary BMPs as necessary during construction based on inspection reports.
7)Ensure final stabilization measures are complete.
8)Provide digital copy of all Field SWPPP Documentation including Inspection Reports and SWPPP Revisions to the Owner.
9)Submit Notice of Termination (NOT) to MPCA. NOTE: The NOT must be submitted to MPCA before Final Stabilization is
considered complete.
LEGEND
SPECIAL ENVIRONMENTAL CONSIDERATIONS:
The SWPPP Designer and Construction SWPPP Manager must have appropriate training. Documentation showing training
commensurate with the job duties and responsibilities is required to be included in the SWPPP prior to any work beginning on the
site. Training documentation for the SWPPP Designer is included on this sheet. The Contractor shall attach training documentation to
this SWPPP for the Construction SWPPP Manager prior to the start of construction. This information shall be kept up to date until the
project NOT is filed.
GENERAL STORMWATER DISCHARGE REQUIREMENTS
All requirements listed in Part III of the Permit for the design of the permanent stormwater management system and discharge
have been included in the preparation of this SWPPP. These include but are not limited to::
1.The expected amount, frequency, intensity, and duration of precipitation.
2.The nature of stormwater runoff and run-on at the site
3.Peak flow rates and stormwater volumes to minimize erosion at outlets and downstream channel and stream bank erosion.
4.The range of soil particle sizes expected to be present on the site.
RESPONSIBLE PARTIES:
The Contractor and Owner must apply for coverage under the MPCA's General Stormwater Permit for Construction Activity as
required by the National Pollutant Discharge Elimination System (NPDES) Phase II program. Coverage under the permit will begin
automatically 7 calendar days after the electronic submittal date or after the postmarked date of a complete application. [Longer
time frames apply to sites that disturb areas greater than 50 acres.]
The Contractor shall provide one or more trained Construction SWPPP Manager(s) knowledgeable and experienced in the application
of erosion prevention and sediment control BMPs that will oversee the implementation of the SWPPP, and the installation, inspection
and maintenance of the erosion prevention and sediment control BMPs. A Construction SWPPP Manager must be available for an
on-site inspection within 72 hours upon request by the MPCA.
ADDITIONAL COMPENSATION
Payment for all work associated with Erosion and Sediment Control shall be as described in the Project Manual. Unless otherwise
authorized by the Owner no additional payment shall be made for any work required to administer and maintain the site erosion and
sediment control in compliance with the Minnesota Pollution Control Agency (MPCA) - General Stormwater Permit for Construction
Activity (MN R100001) including but not limited to inspection, maintenance, and removal of BMPs or addition of BMPs to
accommodate Contractor phasing.
SWPPP DESIGNER
FEETSCALE
0 1500 3000
Wet Sedimentation Basin
Infiltration/Filtration
Regional Pond
X Permanent Stormwater Management Not Required
COUNTY TOWNSHIP RANGE SECTION LATITUDE LONGITUDE
Sherburne T33N R26W 3,4 43.3833°‐93.1557°
BMP SUMMARY QUANTITY UNIT
SILT FENCE, TYPE HEAVY DUTY 3000 LF
EROSION CONTROL BLANKET CATEGORY 3P 24160 SY
SEEDING, MIXTURE 25-121 5 ACRE
COMMON TOPSOIL BORROW 1,000 CY
NAME OF WATER BODY
TYPE (ditch,
pond, wetland,
lake, etc.)
Appendix A
Special Water?
Flows to Impaired
Water Within 1
Mile?
USEPA Approved
TMDL?
RICE LAKE LAKE NO YES NO
TIBBETS BROOK STREAM YES YES YES, NOT FOR
CONST
UNNAMED STREAM STREAM NO NO NO
Impairments: TIBBETS BROOK IMPAIRED FOR E.COLI
COMPANY CONTACT PERSON PHONE
OWNER:City of Elk River JUSTIN FEMRITE 763-635-1051
SWPPP DESIGNER:Bolton & Menk, Inc.JASON COOK 763-433-2851
CONTRACTOR:
CONSTRUCTION SWPPP MANAGER:
PARTY RESPONSIBLE FOR LONG TERM O&M:City of Elk River JUSTIN FEMRITE 763-635-1051
1)Was an environmental review required for this project or any part of a common plan of development or sale
that includes all or any portion of this project?NO
2)Does any portion of the site have the potential to affect threatened or endangered species or their critical
habitat?NO
3)Does any portion of this site discharge to a Calcareous fen.NO
4)Will any portion of the site potentially affect properties listed on the National Register of Historic Places or a
known or discovered archeological site?NO
5)Have any Karst features have been identified in the project vicinity?NO
6)Is compliance with temporary or permanent stormwater management design requirements infeasible for this
project?NO
7)Has the MN DNR promulgated "work in water restrictions" for any Public Water this site disharges to during fish
spawning?NO
Total Project Size (disturbed area) =6.6 ACRES
Existing area of impervious surface =0.3 ACRES
Post construction area of impervious surface =0.6 ACRES
Total new impervious surface area created =0.3 ACRES
Planned Construction Start Date:APRIL, 2019
Estimated Construction Completion Date:NOVEMBER,
2019
PROJECT AREAS:
PROJECT LOCATION
R
SWPPP PLAN
14
PROJECTLOCATION
PROJECT BOUNDARY
NATIONAL WETLANDS INVENTORY
IMPAIRED, SPECIAL OR PROTECTED WATERS
1-MILE BOUNDARY
RICE LAKE
TIBBETSBROOK
RECEIVINGWATERSUNNAMED
TIBBETSBROOK
CONTRACTOR: Minger Construction
RECORD PLAN
ZGN 12-22-2020