LEACHATE_17C
COCO
VV
VV
V
B
CLVT CLVT
CO
CO >PAPAPA1028
1253B
1253C
1260E
1253B
1253B
1260C
162
1256
1253B
1253E
1253B
543
1253B
1253B
1253C
1260C
1288
158C
1260B
261
1253E
1028
1260C
1253E
1253C
1288
1253B
1254
1253B
SHEET
DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2019, All Rights ReservedcH:\WASTEMAN_PR\R16115896\CAD\C3D\115896C201.dwg 3/1/2019 4:44:26 PMDESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
REVISION DATENO.
R
7533 SUNWOOD DR NW, SUITE 206
RAMSEY, MINNESOTA 55303
Phone: (763) 433-2851
Email: Ramsey@bolton-menk.comwww.bolton-menk.com
OF
Kevin F. Bittner
21814 03/01/2019
ELK RIVER LANDFILL INC.
WASTE WATER FORCEMAIN
KFB
KGA
KFB
R16.115896 46
LEGEND
PROJECT BOUNDARY
SOIL TYPE
NATIONAL WETLANDS INVENTORY
STEEP SLOPES (>33.3%)
SOIL TYPE SUMMARY
Map Unit
Symbol Soil Name Hyd. Soil
Group Erodibility
1260C STONE LAKE A PHEL
1260E STONE LAKE A HEL
261 ISAN A/D NHEL
1028 PITS PHEL
1253C SANBURN A PHEL
158E ZIMMERMAN A HEL
NHEL - Not Highly Erodible Land
PHEL - Potentially Highly Erodible Land
HEL - Highly Erodible Land
LOCATION OF SWPPP REQUIREMENTS IN PROJECT PLAN
DESCRIPTION SHEET NO.
SITE MAP 1
FINAL STABILIZATION 11-19
SOILS 15
EROSION & SEDIMENT CONTROL DETAILS 12
NARRATIVE & NOTES 13-14
FEETSCALE
0 250 500
R
SWPPP SOILS
16CONTRACTOR: Minger Construction
RECORD PLAN
ZGN 12-22-2020