Loading...
LEACHATE_17C COCO VV VV V B CLVT CLVT CO CO >PAPAPA1028 1253B 1253C 1260E 1253B 1253B 1260C 162 1256 1253B 1253E 1253B 543 1253B 1253B 1253C 1260C 1288 158C 1260B 261 1253E 1028 1260C 1253E 1253C 1288 1253B 1254 1253B SHEET DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2019, All Rights ReservedcH:\WASTEMAN_PR\R16115896\CAD\C3D\115896C201.dwg 3/1/2019 4:44:26 PMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. REVISION DATENO. R 7533 SUNWOOD DR NW, SUITE 206 RAMSEY, MINNESOTA 55303 Phone: (763) 433-2851 Email: Ramsey@bolton-menk.comwww.bolton-menk.com OF Kevin F. Bittner 21814 03/01/2019 ELK RIVER LANDFILL INC. WASTE WATER FORCEMAIN KFB KGA KFB R16.115896 46 LEGEND PROJECT BOUNDARY SOIL TYPE NATIONAL WETLANDS INVENTORY STEEP SLOPES (>33.3%) SOIL TYPE SUMMARY Map Unit Symbol Soil Name Hyd. Soil Group Erodibility 1260C STONE LAKE A PHEL 1260E STONE LAKE A HEL 261 ISAN A/D NHEL 1028 PITS PHEL 1253C SANBURN A PHEL 158E ZIMMERMAN A HEL NHEL - Not Highly Erodible Land PHEL - Potentially Highly Erodible Land HEL - Highly Erodible Land LOCATION OF SWPPP REQUIREMENTS IN PROJECT PLAN DESCRIPTION SHEET NO. SITE MAP 1 FINAL STABILIZATION 11-19 SOILS 15 EROSION & SEDIMENT CONTROL DETAILS 12 NARRATIVE & NOTES 13-14 FEETSCALE 0 250 500 R SWPPP SOILS 16CONTRACTOR: Minger Construction RECORD PLAN ZGN 12-22-2020