LEACHATE_5 Bolton & Menk, Inc. 2019, All Rights ReservedcH:\WASTEMAN_PR\R16115896\CAD\ENV\Plant 3D\Waste Management Lift Station 1\Orthos\DWGs\Meter MH Vault 13.dwg 2/28/2019 11:32 PMTOP PLAN - METER VAULT
SCALE: 3/8"=1'-0"
1
?
1
?
2'-6" CLEAR
OPENING
℄
VALVE/
METER
VAULT
15'-8"1'-6"1'-4"7'-8"2 #5 DIAG. EA
CORNER (TYP)
2 ADD'L #5 EA SIDE OF
OPENING (TYP)
30"x36" CLEAR OPENING ACCESS
HATCH W/ SAFETY GRATING CAST
INTO TOP SLAB. VERIFY SIZE AND
LOCATION WITH ENGINEER.3'-0"6" SCH 40 WELDED STEEL PIPE
VENT WITH SEEPAGE COLLAR
CAST INTO TOP SLAB. INCLUDE
BIRD SCREEN.
NOTE:
SEE SECTION 1 FOR
ADDITIONAL TOP SLAB
REINFORCING
R
PLAN - METER VAULT
SCALE: 3/8"=1'-0"R12'-0"6'-0"℄
VALVE/
METER
VAULT
1
?1
?
6" DIP
FORCEMAIN
6" MJ
COUPLING
6" HDPE FORCEMAIN
℄ ELEV.=953.52
1'-6"2'-6"
6" GATE
VALVE
6"
METER
6" DIP
FORCEMAIN
30"x36" CLEAR OPENING ACCESS
HATCH W/ SAFETY GRATING CAST
INTO TOP SLAB. VERIFY SIZE AND
LOCATION WITH PUMP
MANUFACTURER.
1'-0"1'-0"
PRECAST CONCRETE
VALVE/METER VAULT
FE
2
SLOPE GROUT
TO SUMP
SEE REINFORCEMENT
SCHEDULE SHEET 7
18"X18"X3"
SUMP
6" GATE
VALVE
6" HDPE FORCEMAIN
℄ ELEV.=953.52
12" HDPE
CASING PIPE12" HDPE
CASING PIPE
6" MJ
COUPLING
SECTION - METER VAULT
SCALE: 3/8"=1'-0"
1
D#
BASE ELEV.=951.502'-014"NOTES:
1.ALL INTERIOR PIPING IN WET WELL SHALL BE
STAINLESS STEEL AS SHOWN.
2.ALL INTERIOR PIPING IN VALVE/METER VAULT SHALL
BE FLANGED FITTINGS AS SHOWN.
3.ALL EXTERIOR PIPING SHALL BE MECHANICAL JOINT
WITH MEGALUG RESTRAINT JOINTS.
4.FLEXIBLE WATERTIGHT SEAL TO BE PROVIDED AT ALL
PIPE PENETRATIONS AT VALVE VAULT AND LIFT
STATION. FLEXIBLE WATERTIGHT SEAL TO BE
APPROVED BY ENGINEER.
5.CONTRACTOR SHALL VERIFY EXISTING FORCEMAIN
ELEVATION.
NOTE: PIPING ROTATED FOR CLARITY
SEE PLAN FOR ORIENTATION.
12" COMPACTED
GRANULAR FILL
SLOPE GROUT TO
SUMP
PIPE SUPPORT
(TYPICAL)
PIPE SUPPORT
(TYPICAL)
10'-0"x18'-0"x12"
THICK BASE 9"18"X18"X3"
SUMP3"1'-6"
#5 @ 8" O.C. EW TOP (TYP)
#5 @ 12" O.C. EW BOTTOM (TYP)
2" CLEAR COVER EF
6" HDPE FORCEMAIN
℄ ELEV.=953.52
12" HDPE
CASING PIPE
6" SCH 40 WELDED STEEL
PIPE VENT WITH SEEPAGE
COLLAR CAST INTO TOP
SLAB. INCLUDE BIRD
SCREEN.
30"x36" CLEAR OPENING ACCESS
HATCH W/ SAFETY GRATING CAST
INTO TOP SLAB. VERIFY SIZE AND
LOCATION WITH PUMP
MANUFACTURER.2'-6"PRECAST CONCRETE
VALVE/METER VAULT
ELEV.=971.00
12" THICK
PRECAST TOP
SLAB
REFER TO SITE PLAN FOR
GRADING AROUND LIFT
STATION AND VALVE/METER
VAULT.
ELEV.=970.00
3 EQUAL SECTION HEIGHTSREINFORCING
#5 @ 8" O.C. EW BOTTOM (TYP)
#5 @ 12" O.C. EW TOP (TYP)
2" CLEAR COVER EF
6" DIP
FORCEMAIN
6" MJ
COUPLING
6" HDPE FORCEMAIN
℄ ELEV.=953.52
1'-6"2'-6"
6" GATE
VALVE
6"
METER
FE
2
6" GATE
VALVE
12" HDPE
CASING PIPE
6" MJ
COUPLING VALVE EXTENSIONSTEM WITH NUTVALVE BOX
CAST INTO
TOP SLAB
VALVE EXTENSIONSTEM WITH NUTVALVE BOX
CAST INTO
TOP SLAB
DATE LIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF
THE STATE OF MINNESOTA.
SHEET
Bolton & Menk, Inc. 2019, All Rights ReservedcH:\WASTEMAN_PR\R16115896\CAD\ENV\Plant 3D\Waste Management Lift Station 1\Orthos\DWGs\Meter MH Vault 13.dwg 3/1/2019 4:00:02 PMDESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
REVISION DATENO.
R
7533 SUNWOOD DR NW, SUITE 206
RAMSEY, MINNESOTA 55303
Phone: (763) 433-2851
Email: Ramsey@bolton-menk.com
www.bolton-menk.com
OFSINATURE:PRINTED NAME:
TYPED OR Tejpal Singh Bala
4957403/01/2019
ELK RIVER LANDFILL INC.
WASTE WATER FORCEMAIN
TSB
TMJ
TSB
R16.115896 46METER MANHOLE VAULT 13 PLAN & SECTION
5CONTRACTOR: Minger Construction
RECORD PLAN
ZGN 12-22-2020
8643210
Graphic Scale for 3/8"=1'-0"