Loading...
5.1. PCSR 04-26-2022 ��i City of Elk ' Request for Action River To Item Number Planning Commission 5.1 Agenda Section Meeting Date Prepared by Public Hearings Aril 26, 2022 Chris Leeseber , Senior Planner Item Description Reviewed by Elk River Extreme Motor Park Zack Carlton, Community Development Director 21591 US Highway 169 Reviewed by ■ Conditional Use Permit for track expansion and roofed viewing deck, Case No. CU 22-09 Action Requested Approve,by motion,a Conditional Use Permit with the following conditions to satisfy the standards set forth in Section 30-654: 1. No more than five Special Event Recreational Camping events per year may occur on the properties that are regulated by this Conditional Use Permit. 2. The hours of operation shall be: a. Sunday through Wednesday 7:00 a.m. —9:00 p.m. b. Thursday 7:00 a.m. — 10:00 p.m. c. Friday and Saturday 7:00 a.m. — 11:00 p.m. d. Five (5) three (3) day events per year,by special event permit,will be granted for extended hours to midnight. 3. Motorized events are prohibited within 1,000 feet of any residence,livestock shelter, and/or arena,regardless of when they were erected. 4. All motorized and non-motorized trails must be set back 50 feet from the north, east,and south property lines,and 45 feet from all delineated wetlands. 5. Staff will continually work with the applicant on the location of future trials to ensure they are not impacting wetlands and/or required buffers. 6. All ingress/egress functions related to the subject parcel/CUP shall occur at Brook Road and all access points be removed on US Highway 169 by August 2024, or at a future CUP,whichever occurs first. 7. Existing structures used for any type of gathering, assembly, spectators,viewing, and/or customers shall be reviewed by the Building Official for compliance with all state and local building codes. 8. Camping areas shall be as identified on the site plan dated 3/24/2022 and shall not be closer than 50 feet to any property line. 9. An amendment to this Conditional Use Permit will be required for future expansions/additions not shown on the site plan dated 3/24/2022. 10. Staff approval of the Safety and Crisis Communication Plan. a. This plan shall be reviewed annually by all parties prior to May 1. 11. Staff approval of an on-site traffic/distribution plan that demonstrates: a. Logical on-site distribution of participants, spectators, and public safety. b. Adequate on-site stacking for admission and egress. The Elk River Vision A Y�elcoming community nvith revolutionary and spirited resourcefulness, exceptional P U W E H E o s r service, and community engagement that encourages and inspires prosperity ,g /` UR c. Adequate off-site stacking for access and egress without impacting U.S. Highway 169. 12. The Aggregate Commercial 6th Addition plat (Case File P 22-05) shall be recorded. 13. Noise generated on the property via the Conditional Use Permit shall comply with those outlined in the MPCA Guide to Noise Control. 14. The changeable copy sign shall not exceed 70 square feet and must comply with the standards set forth in Sec. 30-864 (e). A sign permit is required. 15. A Minnesota Department of Natural Resources (DNR) Appropriation Permit shall be required for any water use that is above 10,000 gallons a day or totaling 1 million gallons or more within a year. This includes snow-making applications and spraying for dust control and other construction needs. 16. Conditional Use Permit (CU 18-10) will become void upon the recording of this permit. Background/Discussion The subject property is east of Highway 169 between the 213th and 221"Avenue alignments. The property is zoned Extreme Commercial Recreation (XCR) t where Off-Road Racing Facilities require a Conditional Use Permit. _ �. u r CR 33 r The applicant requests an amendment to the previously approved CUP to permit expansion of their large track construct two roofed m viewing structures, and install a changeable copy sign (approximately 70 sq. ft.). RR i Overall, the current functions/activities on site will continue as they i2 , have, but with the addition of a few additional structures and a track expansion. The conditions from the 2018 CUP have been - CR 12 incorporated into this amendment. _Id To complete the track expansion,ERX has applied for a Platted 9 Exemption to plat a portion of the property to include the expanded track. This application will be reviewed by the City Council. 6y Transportation/Circulation The site has three access points to and from Highway 169. The Figure i submitted site plan shows two access points to be used for spectators and one for participants/riders.A third future access is shown directly across from 213th Avenue. By the end of 2024, the 169 Redefine project will be complete and the conversion of US Highway 169 to a freeway will greatly affect traffic patterns,primarily overserved with a lack of openings in traffic and providing minimal opportunities to safely enter/cross US Highway 169. Staff has spoken with the applicant regarding a future access at Brook Road and they understand the long-term vision for the connection that would then provide access to the interchange at CR 33 and Highway 169. The applicant is in ownership of the necessary properties to establish a connection to Brook Road. Changeable Copy Sign Section 30-880 states the subject parcel is allowed one freestanding sign, not to exceed 150 square feet with a maximum height of 30 feet. One freestanding sign may be permitted for every 1,000 feet of street frontage measured along a single street. Additional sign(s) shall be subject to the size and height limitations of the first allowed freestanding or monument sign and may be placed no closer than 500 feet to any other freestanding or monument sign. The applicant is proposing a 30-foot-tall sign with approximately 70 sq. ft. of changeable copy. They are exploring two overall square footages. The Planning Commission review is only for the changeable copy and the overall sign will require a building permit. With the standards set forth in Sec. 30-864 (e),the use should not endanger,injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety,morals, comfort, convenience or general welfare of the neighborhood or the city. Applicable Regulation In approving a Conditional Use Permit,the council may impose such specific conditions with regard to the development or operation of the proposed use as it considers necessary to satisfy the seven standards set forth in section 30-654 and the requirements contained in this article and to promote compatibility with and minimize any potentially adverse effects upon adjacent properties, the neighborhood or the city. The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 7. Weill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral nv fare of the neighborhood or the city. The property has been operating as an off-road racing facility for several years and as the main uses on the campus are racing in nature,varying levels of noise are expected. By far, the most common complaint the city receives about ERX is noise,with traffic being second. To help the general welfare of the area,hours of operation need to be in place. Staff recommends the current hours of operation continue as follows: a. Sunday through Wednesday 7:00 a.m. —9:00 p.m. b. Thursday 7:00 a.m. — 10:00 p.m. C. Friday and Saturday 7:00 a.m. — 11:00 p.m. d. Five (5) three (3) day events per year,by special event permit,will be granted for extended hours to midnight. The applicant is requesting the hours operation on Friday and Saturday be extended by one hour from 7:00 a.m. — 12:00 a.m. 2. mill be consistent with the Comprehensive Plan. The property has a land use designation of Highway Business. The Highway Business category primarily consists of a mix of auto-oriented retail and service businesses,restaurants, and community and regional scale shopping centers. Highway Business uses are located along Highway 169 and Highway 10 and have high visibility from these corridors. The proposed use is consistent with the Comprehensive Plan. Staff does not see a need to impose specific conditions to satisfy this standard. 3. mill not impede the normal and orderly development and improvement of surrounding vacant property. While all the properties abutting the subject parcel on the east side have homes and other structures on them, they are larger parcels (16-70 acres) and could be subdivided in the future. Staff recommends no motorized events shall occur within 1,000 feet of any residence,livestock shelter, and/or arena, regardless of when they are erected. It is understood this can affect future uses on the subject parcels,but this is to ensure the normal and orderly development will not be impeded on surrounding properties. 4. mill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, mater and sewer systems,parks and schools;and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. As stated before,by the end of 2024, the 169 Redefine project will be complete and with the conversion of US Highway 169 to a freeway,this will greatly affect traffic patterns in the area. Staff recommends that all ingress/egress functions related to the subject parcel/CUP occur at Brook Road and all access points be removed on US Highway 169 by August 2024, or at a future CUP,whichever occurs first. Staff will work with the applicant on the location of this Brook Road access. Portions of the subject parcels are now located in the Future Urban Service District.Although the current project does not require city services, some of the permitted and conditional uses in the XCR district will require city services and this will have to be addressed in the future. MnDOT has expressed concerns with past snow-making activities that have created hazardous conditions to the highway system. State statute X160.2715 - Right-Of-Way Use;Misdemeanors states it shall be unlawful to obstruct any highway or deposit snow or ice thereon. 5. mill not involve uses, activities,processes, materials, equipment and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke,fumes,glare, odors, dust or vibrations. Again, the main uses on the campus are racing in nature where varying levels of noise are expected. With hours of operation and the recommended condition of noise generated on the property via the Conditional Use Permit shall comply with those outlined in the MPCA Guide to Noise Control,this should regulate excessive noise. As for excessive traffic, the recommend condition of an alternate access point should limit excessive slowing down/stopping traffic on Highway 169. 6. Vill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. The subject parcels that are a part of the CUP have a significant number of wetlands throughout. The applicant is having a wetland delineation completed on the parcels shown on the exhibit labeled "Wetland Delineations". Section 30-1852 of the ordinance outlines setbacks from wetlands. While the site plan dated 3/24/2022 shows the approximate locations of existing and future trails, staff will continually work with the applicant on the location of future trials to ensure they are not impacting wetlands and/or required buffers/setbacks. Other development/structures not shown on the site plan dated 3/24/2022 will require an amendment to the CUP. 7. mill fully comply n ith all other requirements of this Code, including any applicable requirements and standards for the issuance of a license orpermit to establish and operate the proposed use in the city. There are numerous structures on the parcels and staff is working with the applicant to determine which structures have received building permits. Staff is recommending that all current structures on site used for any type of gathering,assembly, spectators,viewing, and/or customers shall be reviewed by the Building Official and Fire Marshal for compliance with state and local ordinances. If denial of such a permit should occur,it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. Financial Impact None Council Meeting If acted on,this item will go to the May 15, 2022, City Council meeting. Attachments ■ Location Map ■ Site Plan dated 3/24/2022 ■ Applicant's Narrative ■ Site Photos ■ Parking Exhibit ■ Building Use Chart ■ Wetland Delineations ■ Changeable Copy Sign Exhibits ■ Possible Trails at ERX ■ Chalet Plans ■ Section 30-1852 P Q R Spectator Entrance Parking Special Event Camping Area Race Pits Storage Shed Concert Stage Outdoor Storage Possible Special Event Camping Area Possible Bathrooms Welcome Arch Future Expansion VIP Structure Future Road Connecting to 169 Future Changeable Copy Sign Future Ice Machine Future Structure Future Storage Structure revision date | 3/24/2022 KEY “THE FIELD” “THE RIDGE” HWY 169 “THE MEADOW” P F Q R R “BACK 40”260 parking spots200 parking spots700 parking spots500 parking spots 1000 parking spots Storage Shed 12x20 Chalet 60x22 shed 60x22 shop 12x36 shed Shed 12x24 C.U.P. NARRATIVE – 21591 US HWY 169 NW Background ERX was launched in the winter of 2008 and is recognized today as one of the fastest-growing motorsports facilities in the Midwest. With a focus on family-friendly events and grassroots motorsports activities, ERX has been quickly embraced by motorsports enthusiasts of all kinds. ERX was created by Todd Plaisted and Chris Carlson, two Elk River businessmen who are long- time Powersports enthusiasts. Plaisted and Carlson both enjoy participating in Powersports activities with their families. They saw an opportunity to create a facility that would address their love for racing and provide value for the Elk River community. Their original intent was to provide a facility for snocross racing and training. Today, ERX is a year-round complex hosting both snowmobile events in the winter and off-road truck and SxS racing, concerts and extreme 5k’s in the summer months. ERX hosts events for local and regional organizations and non- profits such as Day of the Dozers, Children’s Minnesota fundraiser and the ‘Livin Country Music Festival, whose mission is to promote a positive outlook on life, reduce the stigma associated with depression/mental illness, and ultimately prevent suicide through various activities, events, and outreach. Future uses of the facility may include additional concerts, festivals, product demonstrations and endurance events such as “Tough Mudders” or “Running with the Bulls.” ERX has a long history of growth in the City of Elk River dating back to June of 2008 when we received our first IUP to operate. We’ve built a great relationship with city staff and look forward to our new development opportunity. Plat Update ERX would is proposing an update to a small triangle area on the northeast side of the off-road track (PID: 75-878-0105) to include a track adjustment and put up a viewing deck with a roof to increase seating capacity. ERX has been working with the Minnesota Department of Health for the past six years to develop a strategy for camping at ERX. Discussions have centered around the possible need for ERX to develop an on-site campground, or if there is a way to provide the space on a rental basis to to groups hosting events at ERX, in which they would apply for their own permits. It was determined that any organization can apply for the Special Event Camping Area License (SECA) and that the SECA license is not land specific. This means that ERX Motor Park can utilize their two camping events twice per year. However, if ERX choose to rent out the facility, the Page 2 company renting the facility would be able to apply for and obtain a camping permit following all guidelines that it would be allowed. In 2018, the City of Elk River approved this, and this would be a condition that we would like to keep. ERX Motor Park would also like to utilize land on property owned by Plaisted Companies (PID: 75-110-1105) for a SECA License during large events. The process for applying for a SECA license is very specific in nature. Each company, ERX included, needs to submit a site plan review, and pay for the plan review and the license for their specific event days. Upon obtaining a license, the Minnesota Department of Health comes out to inspect the property for each license. Because of the incredible success of the events ERX has hosted thus far, we applied and obtained a CUP that would combine all track elements (off-road and snocross) on a single plat. During our meeting with City staff on September 14, 2016, it was indicated once approved, this would eliminate the need to apply for a special event permits in the future for our larger events that stay within land boundaries and use of Outlot A and Plaisted Property. On April 16, 2018, ERX and City Staff brought to the City Council Work Session a Concept Review for an Ordinance Amendment and CUP Amendment that showed where the future of ERX was headed. Council found no issues with moving forward. Detailed Description From the very beginning, Mr. Plaisted and Mr. Carlson have implemented a few fundamental principles which have been consistently used to guide the organization through the years: • ERX will be family and community focused. o It will be a facility that will provide safe, family-friendly activities, with the goal of creating value within the local communities and the powersports industry. • ERX will utilize an operating philosophy grounded in integrity, and benevolence and charitable activities will be a key part of the operation. o Free admission has been, and will continue to be offered to charities, ministries, schools, and non-profits. ERX is proud to have partnered with several outstanding non-profit organizations through the years, including but not limited to Big Brothers and Big Sisters, MN Adult and Teen Challenge, Boys and Girls Club of MN and the Fellowship of Christian Athletes (FCA) Three River’s Community Foundation and Children’s Hospitals of MN. Most recently, ERX has donated the use of their property to the YMCA of MN for their summer youth motorcycle training program, the “National Youth Project Using Minibikes (NYPUM).” • ERX will encourage development. Page 3 o Since the beginning, ERX has hosted events designed to promote improved skills and safety. These events have included the ERX Learn2Ride Clinics (Snocross), Motocross Clinics, YMCA Youth Motorcycle training, Avalanche Awareness Classes, Youth Snowmobile Safety Training and Day of the Dozers. Brief overview of the vision ERX is recognized as the top testing and development facility in the country for amateur and professional Snocross and Off-Road racers. As a direct result, the large manufacturers supporting this industry, such as Polaris, Arctic Cat, Honda and BRP, are investing in the Elk River area as well as ERX through corporate events and leased shop space for their factory teams. At least two of the manufacturers have expressed interest in moving part of their corporate racing operations to Elk River to gain improved access to ERX. ERX has built a national caliber off-road truck track that professional drivers have quoted as being the “most fun they have had racing, ever.” ERX strives to become the number one track of this nature in the nation. During our meeting with city staff on July 28, 2016, ERX indicated that we would like to offer overnight parking and camping to spectators for these events. City staff indicated it wouldn’t be a problem being it was only a couple times a year. Scope of Project/Proposal Currently, six buildings/structures are on the 43.7-acre site that also includes the off-road truck track and regional snocross track (county map attached), including: • A 624 square foot office • A 2,400 square foot shop • A 1,320 square foot storage facility • A 3,250 square foot facility (chalet) • A 240 square foot shed • A 480 square foot shed Future facility expansion plans near the Regional Track include an addition to the existing ERX Chalet which would house bathrooms and concessions, and an additional storage shed. Future improvements near the off-road truck track include a two-level announcing tower which would house an announcing booth on the upper level, and a concession stand on the lower level. A scoring shelter, grandstand bleachers, a two-level viewing structure on the north and west side and a semi-permanent viewing structure on the east and south side of the off-road track will also be added, in addition to a storage shed. In the meantime, we will continue to utilize temporary/portable bleacher units, and portable shipping containers. The 13.29-acre site (housing our regional track) has been operating as ERX since 2008 and has served as a feeder system to ISOC, the national Snocross racing series. Riders who were Page 4 introduced to the sport of snocross at ERX are now winning national championships and are recognized as some of the best emerging racers in the world. As a direct result, ERX is quickly acquiring a reputation as a facility which develops and builds future champions. In the spring of 2016, the ERX team built an off-road truck racing track that has hosted one national race and testing sessions for professional teams. In 2017, ERX hosted two national races and testing sessions. ERX is slated to host one off-road truck race in the summer of 2022. In addition to providing a safe, yet challenging track for testing and training, ERX provides the following events on a regular basis: 1. ERX Grassroots Snocross Series This series is 13 years strong, and is hosted on Thursday nights, focusing on first-time, amateur and youth racers. The largest classes are youth oriented, and the largest specific groups of racers are the 120cc class, which features riders from ages 4 to 12 years old. Competitors follow the six-race series with hopes of capturing the ERX Season Points Championship. We have racers traveling from Ontario, Manitoba, North Dakota, Wisconsin, Michigan, Iowa, and Ohio. Average attendance for this race is approximately 1,000 people; we don’t anticipate attendance to ever exceed 1,500 people. 2. ERX Off-Road National Professional and armature off-road truck and SxS racers make their way annually each July to battle on one of the top short course tracks in the country. The ERX Off-Road National is the premier event at ERX Motor Park. This event draws approximately 6,000 racers and fans from across the United States over this three-day event. 3. Midwest Vintage Snowmobile Show: The Midwest Ride-in The Midwest Ride-In event has grown into the largest vintage snowmobile event in the world. The Ride-In is a show full of old-school snowmobile and memorabilia that draws collectors and memory seekers from far and wide. This event is held annually the last weekend in January and draws upwards of 2,500 people from all over the Midwest. 4. Extreme 5k This is the ERX version of the “Tough Mudder.” 18 obstacles, automated chip timing and scoring and a lot of fun! 700 runners make their way to ERX in May to test their limits. This event supports a charitable group each year. Future motor events at ERX could include grassroots off-road truck racing, regional off-road truck racing, and motocross racing. Future non-motorized events (Active Recreation and Physical Endurance Events) at ERX could consist of concerts, festivals, dealer demo shows, trade shows, and physical endurance events. Page 5 In 2017 ERX completed the EAW process as required by the city; this was triggered by our anticipation of hosting events in the future which would exceed 5,000 participants. To date, the largest attendance at any of our events was approximately 4,500 at peak attendance. We anticipate future off-road truck races and larger extreme Snocross races to exceed 5,000 participants and spectators. If we were to consider hosting an event on this site that would exceed 19,999 peek participant and spectator attendance, we will work with the city to ensure all necessary requirements are put into place prior to the event. Hours of Operation Current hours of operation are Sunday through Wednesday 7am-8pm, Thursday 7am to 10pm, Friday and Saturday 7am to 11pm. 2022 and beyond Proposed hours of operation: Sunday through Wednesday 7am-8pm, Thursday 7am-10pm, Friday and Saturday 7am-12am. Number of Employees ERX Motor Park is staffed by a dedicated team of 20 employees from Plaisted Companies, Envision Company, and Carlson Motorsports. We also utilize a community of volunteers during our larger events. Traffic Traffic and other key elements have been addressed in further detail in our completed EAW. Based on these findings, ERX will work with MnDOT and City staff to ensure safe entrance and exit with Hwy 169. Number of Parking Stalls (existing & additional) There are 260 parking stalls on the upper paved lot, 200 parking stalls on the bottom lot near the chalet, and another 700 parking stalls in the areas to the south and east of the upper paved lot of ERX. We also have over 500 parking spots located directly adjacent to ERX on property owned by Envision (Carlson Family, PID: 75-833-0105). Over 1,000 additional spots are also available approximately 0.25 miles to the NE on property owned by Plaisted Companies (PID: 75-110-0105). Signage/Outdoor Storage There are two permanent signs on the property. One of the signs is 14 foot high by 4 foot wide. The other sign is 15 foot high by 8 foot wide. ERX will have event sponsor signs up during and in between events. ERX will comply with all city codes set forth in the Elk River Zoning Ordinance. In the future, we anticipate constructing a monument sign on ERX Properties that would exceed 30 square feet of changeable copy. We are including a changeable copy sign in this CUP application. We will work with city staff and apply for any applicable sign permit(s). Page 6 Utility Plan This property isn’t currently in the Urban Service District therefore we don’t require city services currently. Wetland Delineation In 2016, Anderson Engineering performed wetland delineation on the rest of this property. All wetlands have been preserved. ERX is working with Anderson Engineering to perform an updated wetland delineation. Grading Except for the off-road truck track and the special event camping area, there will be no grading changes from the current state, at which time, ERX will apply for necessary permit(s). Camping As part of this CUP, per City staff’s request, ERX is including unplatted Outlot A (PID: 75-725- 0010) as a special event camping area. ERX will ensure all codes are met with the Minnesota Department of Health. "Special event recreational camping area" means a recreational camping area which operates no more than two times annually per event planning company and for no more than 14 consecutive days. In 2018, the City Council approved allowing ERX to have two special event camping events and have three other special event camping events available for other organizations as long as they complete the MDH requirements. Impact to the Neighbors of ERX Motor Park The ownership and leadership team at ERX Motor Park realizes that there is a possibility of impacting our neighbors of the facility. To combat this, in the past we have stopped by our neighbors that are the closest to the event site, explained to them what was going on, offered them tickets, and dinner on us. We will continue to go above and beyond to make sure that our neighbors know what events we have coming to the facility. When it comes down to having events that may impact with noise, concerts, races, etc. we will assess the direction of the noise of such events. For concerts for example, we would position the stage so that the sound would have to travel over natural terrain (a hill) and through the woods before reaching the neighbors. Economic Impact for the City of Elk River Athletes, sponsors, business owners, attendees and event planners come to Elk River, MN from all over the US, Canada and several Scandinavian and European countries to ERX Motor Park. As these individuals travel here for ERX, the Elk River area experiences a significant positive financial impact. The impacts are most significant during the winter snocross seasons as teams and athletes continue to call Elk River “home” in their attempts to locate near the ERX track. Teams support local businesses by utilizing local restaurants, hotels, municipal liquor stores, grocery stores and gas stations. During large ERX events, the Elk River community is filled with Page 7 teams, families and spectators as they spend multiple days in the area participating in events at ERX. Since our inception, there’s been a handful of families who have purchased land in the Elk River area to be closer to ERX, thus: 1) providing part-time housing for their family and team, 2) operating their respective business(es) and racing team operations 3) leasing available space and 4) patronizing local businesses. Chalet - 50’ x 50’ x 26.44’Shed - 12’ x 20’ x 10.4’Storage Shed - 22’ x 60’ x 12.6’ Shop - 40’ x 60’ x 21’Storage Shed - 12’ x 36’ x 11’Lighted Sign - 4’ x 1’ x 14’Large Sign - 8’ x 8’ x 15’ ERX BUILDINGS AND SIGNS [SEE MAP ON PAGE 3] ERX BUILDINGS AND SIGNS [SEE MAP ON PAGE 4] Storage Shed - 21’ x 24’ x 11’ 50’ 20’ 12’ 40’ 60’ 36’12’ 8’8’ 60’ 22’ 50’ 50’ 50’ 50’ PotentialExpansion Parking (260 stalls) Parking ExistingDrainfield Future Drainfield Site Entrance(200 stalls) Shed StorageShed Potential FutureStorage Shed Existing Track Incidental Pond (from previous gravel mining) Shop Chalet Compacted Recycled Asphalt Compacted Class V Asphalt Participant / Sponsor Parking Spectator Parking All water sheet drains to pond See pg. 1 for building / sign photos and dimensions. ERX Buildings and Signs Purpose: To describe the use is of each building Updated: April 21, 2022 Building Letter Building Location Use Chalet 50x50 Main Winter Building Warming Chalet Shed 12x20 By Regional Track/Main Building Storage Storage Shed 60x22 Mid-property Storage of winter equipment Shop 60x40 Mid-property Main ERX Storage and Repair Shop Storage Shed 12x36 Building closest to 169 Sign Storage Storage Shed 12x24 On Outlot A Storage 4x1x14 lighted sign By 12x36 storage shed middle entrance of 169 8x8x15 sign By regional track on 169 NOTE: This is the sign that would be replaced with a changeable copy sign should we choose to add this. 2 Copyright 2005, By Albrecht Sign Company, Inc. All Designs Presented Are The Sole Property Of Albrecht Sign Company Inc., And May Not Be Reproduced In Part Or Whole Without Written Permission From Albrecht Sign Company Inc Photo Renderings Are Not To Scale. Colors In This Drawing Are For Representation Purposes Only And May Differ From Finished Product, Physical Color Samples Can Be Provided Upon Request Revision 01 02 03 04 05 06 07 08 09 Update Customer Signature of Approval Type Units Type Units LED Module Power Supply DESIGN | FABRICATION | INSTALLATION | SERVICE 7775 Main St. N.E., Fridley, MN 55432 P: 763.754.2899 | F: 763.767.7316 www.albrechtsigncompany.com This sign is intended to be installed in accordance with the requirements of Article 600 of the National Electrical Code and/or other applicable local codes. This includes proper grounding and bonding of the sign. The location of the disconnect switch after installation shall comply with Article 600.6(A)(1) of the National Electrical Code. Client Name: ERX Motor Park Client Address: 21591 US-169, Elk River, MN 55330 Start Date: 11/5/2020 Last Revision Date: N/A Job Number: N/A Drawing Revision: N/A Sales Representative: CJ Designer: RD NOTES: Verify install location. Option 1 Scale: 1/8" = 1' 3 Copyright 2005, By Albrecht Sign Company, Inc. All Designs Presented Are The Sole Property Of Albrecht Sign Company Inc., And May Not Be Reproduced In Part Or Whole Without Written Permission From Albrecht Sign Company Inc Photo Renderings Are Not To Scale. Colors In This Drawing Are For Representation Purposes Only And May Differ From Finished Product, Physical Color Samples Can Be Provided Upon Request Revision 01 02 03 04 05 06 07 08 09 Update Customer Signature of Approval Type Units Type Units LED Module Power Supply DESIGN | FABRICATION | INSTALLATION | SERVICE 7775 Main St. N.E., Fridley, MN 55432 P: 763.754.2899 | F: 763.767.7316 www.albrechtsigncompany.com This sign is intended to be installed in accordance with the requirements of Article 600 of the National Electrical Code and/or other applicable local codes. This includes proper grounding and bonding of the sign. The location of the disconnect switch after installation shall comply with Article 600.6(A)(1) of the National Electrical Code. Color: N/A N/A E01 - Option 1 PylonPaint Finish: Vinyl: Digital Print: Black MP Black N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AOther: Single Face: Double Face: Quantity:1 Square Feet: Illuminated: Non-Illuminated: 71.8 Face View Detail Scale: 1/4" = 1' Plan View Scale: 1/4" = 1' A Client Name: ERX Motor Park Client Address: 21591 US-169, Elk River, MN 55330 Start Date: 11/5/2020 Last Revision Date: N/A Job Number: N/A Drawing Revision: N/A Sales Representative: CJ Designer: RD GS6 Daktronics EMC - RGB - 15.85mm Face View Scale: 1/4" = 1' B Sch. 40 Steel pipe - Size TBD. A Steel angle frame painted MP Black. Saddled over SCH 40 steel pipe. B 75.0000°6'-2 7/8"6'-8 7/8"10'-4 13/16" 10'-7 13/16" 6'-6 3/16"5"5"30'-0"10'-3 7/16" 4 Copyright 2005, By Albrecht Sign Company, Inc. All Designs Presented Are The Sole Property Of Albrecht Sign Company Inc., And May Not Be Reproduced In Part Or Whole Without Written Permission From Albrecht Sign Company Inc Photo Renderings Are Not To Scale. Colors In This Drawing Are For Representation Purposes Only And May Differ From Finished Product, Physical Color Samples Can Be Provided Upon Request Revision 01 02 03 04 05 06 07 08 09 Update Customer Signature of Approval Type Units Type Units LED Module Power Supply DESIGN | FABRICATION | INSTALLATION | SERVICE 7775 Main St. N.E., Fridley, MN 55432 P: 763.754.2899 | F: 763.767.7316 www.albrechtsigncompany.com This sign is intended to be installed in accordance with the requirements of Article 600 of the National Electrical Code and/or other applicable local codes. This includes proper grounding and bonding of the sign. The location of the disconnect switch after installation shall comply with Article 600.6(A)(1) of the National Electrical Code. Client Name: ERX Motor Park Client Address: 21591 US-169, Elk River, MN 55330 Start Date: 11/5/2020 Last Revision Date: N/A Job Number: N/A Drawing Revision: N/A Sales Representative: CJ Designer: RD NOTES: Verify install location. Option 2 Scale: 1/8" = 1' 5 Copyright 2005, By Albrecht Sign Company, Inc. All Designs Presented Are The Sole Property Of Albrecht Sign Company Inc., And May Not Be Reproduced In Part Or Whole Without Written Permission From Albrecht Sign Company Inc Photo Renderings Are Not To Scale. Colors In This Drawing Are For Representation Purposes Only And May Differ From Finished Product, Physical Color Samples Can Be Provided Upon Request Revision 01 02 03 04 05 06 07 08 09 Update Customer Signature of Approval Type Units Type Units LED Module Power Supply DESIGN | FABRICATION | INSTALLATION | SERVICE 7775 Main St. N.E., Fridley, MN 55432 P: 763.754.2899 | F: 763.767.7316 www.albrechtsigncompany.com This sign is intended to be installed in accordance with the requirements of Article 600 of the National Electrical Code and/or other applicable local codes. This includes proper grounding and bonding of the sign. The location of the disconnect switch after installation shall comply with Article 600.6(A)(1) of the National Electrical Code. Color: 3630-22 N/A E01: Option 2 PylonPaint Finish: Vinyl: Digital Print: Black MP Black N/A N/A N/A Poppy Red 3630-143 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AOther: Single Face: Double Face: Quantity:1 Square Feet: Illuminated: Non-Illuminated: 142.8 Face View Detail Scale: 1/4" = 1' Plan View: EMC Frame Scale: 1/4" = 1' A Client Name: ERX Motor Park Client Address: 21591 US-169, Elk River, MN 55330 Start Date: 11/5/2020 Last Revision Date: N/A Job Number: N/A Drawing Revision: N/A Sales Representative: CJ Designer: RD GS6 Daktronics EMC - RGB - 15.85mm Face View Scale: 1/4" = 1' B Sch. 40 Steel pipe - Size TBD. A Steel angle frame painted MP Black. Saddled over SCH 40 steel pipe. 3" x 3" Steel angle frame painted MP Black. 5" Deep aluminum cabinet, faces and returns painted MP Black. Copy routed and backed w/ white acrylic. Poppy red vinyl applied. Lit w/ bright white LEDs. 5" Deep face lit fabricated aluminum cabinet, f-trim and return painted MP Black. .177 White polycarb face w/ Black and Poppy Red vinyl applied to faces. Lit w/ bright White LEDs. 3" x 3" Steel square tube cross members painted MP Black. B 75.0000°10'-3 7/16"6'-6 3/16"5"5"6'-8 7/8"1'-6"7"3'-8"6'-2 7/8"10'-7 13/16" 10'-4 13/16"13'-4 7/8"9'-7 9 /16 "4'-3"28'-6"30'-0" Possible Trails at ERX Purpose: To show that possible areas that trails could exist on ERX Property. It is understood that trails will be able to be placed anywhere on ERX property and are fluid and are dependent on wetlands and property lines. Updated: April 21, 2022 40' - 0"50' - 0"SERVICERETAIL SALESUPUPCONC. APRONOBSERVATION AREAEXIST. COLUMN, TYP.SCORINGSCORINGANNOUNCERBOOTHDNDNMAIN LEVELMEZZANINECONC. APRONPROVIDE A.D.A.-COMPLIANT HARDWARE, SIGNAGE & THRESHOLD (1/2" MAX.)NORTHPROVIDE (2)A.D.A.-COMPLIANT PARKING STALLS,(1) STANDARD & (1) VANERX MotorParkELK RIVER, MN2016-11-21 1" = 10'-0"A2.1FLOOR PLAN1 Created: 2022-03-09 08:49:18 [EST] (Supp. No. 54) Page 1 of 2 Sec. 30-1852. Performance standards. (a) Wetland buffer strip. A minimum 25-foot buffer strip from the delineated boundary of a wetland or ordinary highwater level of a stormwater pond is hereby established. Wetland buffer strips shall meet the following standards: i. No principle or accessory structures, patios, paving, or other impervious surfaces shall be permitted within the wetland buffer strip. ii. Alterations are prohibited within the wetland and wetland buffer strip, unless a vegetation management plan or other approval is granted by the city. iii. The applicant shall establish and maintain wetland and wetland buffer strip vegetation in accordance with the requirements found in section 30-1853. iv. The applicant shall maintain the required wetland buffer strip monuments at each lot line where it crosses a wetland buffer strip and at 200-foot intervals along the edge of the wetland buffer strip. Each monument shall state "Wetland Buffer: Under the City Code, no mowing, clearing or removal of vegetation in the buffer area is allowed. Call the City of Elk River for more information." The city reserves the right to eliminate this requirement if it deems it impractical. v. The city, at its sole discretion, following the city's master park trail plan, may allow nature trails comprised of natural materials, to be located within the wetland buffer strip. vi. Leisure activities such as hiking, nature studies, canoeing, boating and horseback riding, including facilities such as nature trails and docks which allow for such activities are permitted in the wetland buffer strip. vii. Final plats for all subdivisions shall provide an easement over all wetlands and wetland buffer strips for the purposes of identification and protection. viii. Properties platted prior to June 19, 2006, shall be exempt from the vegetation management requirements described in subsections ii—iv above. (b) Wetland buffer strip setback. A minimum 20-foot setback from wetland buffer strips is hereby established by the city. i. No principle or accessory structures, patios, paving, or other impervious surface shall be located within this setback. ii. Nature trails, at the city's approval, may be located within the wetland buffer strip setback. iii. On property that was platted prior to June 19, 2006, uncovered decks and permeable pavement can be located within this setback. (c) Exceptions. Properties platted prior to adoption of the wetland buffer strip and wetland buffer strip setback performance standards set forth in this section may not be configured to accommodate the required performance standards. For this reason, exceptions to the performance standards for properties platted prior to June 19, 2006, may be approved by the planning manager pursuant to the site plan review process. Applicants for site plan review shall pay the fee specified in the city's fee schedule. Site plan approvals and required conditions shall be made by the planning manager on a case by case basis, with the goal of maintaining consistency with the performance standards to the maximum extent reasonably possible. Appeals from staff determinations and conditions may be made pursuant to the appeal procedures set forth in section 30-634. Created: 2022-03-09 08:49:18 [EST] (Supp. No. 54) Page 2 of 2 (d) Fences. Fences may encroach into the wetland buffer strip setback, but at no time shall they be allowed within the wetland buffer strip or in delineated wetlands. Properties platted prior to June 19, 2006, shall be exempt from this requirement. (Ord. No. 06-07, § 2, 6-19-2006; Ord. No. 16-24, § 1, 11-21-2016; Ord. No. 17-07, § 1, 4-17-2017; Ord. No. 18-12, § 1, 7-16-2018) Wver April 26, 2022 Heidi, Thank you for your email on April 22, 2022, regarding the Planning Commission memo and conditions. We have commented on each of your seven bullet points below. We will also share this with the Planning Commission, so they are aware of your concerns. • Hours of operation — Thank you for the notation on page 3 however the hours requested are not reflected on page 1 under bullet point number 2 That is correct, page 3 states: Staff recommends the current hours of operation continue as follows. We are recommending it stay the same but have noted you are requesting the change. I will make this clear during the meeting and the commission will make their recommendation. Bullet 4 — I have a message out to our guys to confirm this is standard... why is the city suggesting a 45' setback when it appears code states 25' foot? Sec. 30-1852. - Performance standards. (a)Wetland buffer strip. A minimum 25-foot buffer strip (b)Wedand buffer strip setback. A minimum 20-foot setback from wetland buffer strips The combined setbacks require a 45' setback for all improvements. • Bullet 6 — ohhhh man — sneaky, sneaky... I cannot commit to this. I don't think I should have to either if MNDOT is working with us at this time. This is a long term goal, but will take many, many, many years of planning to change the whole movement of ingress/egress throughout the property. This simply is not in the cards right now and move to strike this almost immediately. We continue to be transparent with our analysis and recommendations. Access through the project site; area has frequently been discussed whether via a frontage road or as identified in the Gravel NIining Area Land Use, "Transportation, and Utility Plan. We also discussed this during our meeting on February 17, 2022, specifically ongoing traffic concerns and how including the Lemmon property will provide access onto the property to alleviate ingress/egress traffic issues currently taking place on Highway 169. Staff makes recommendations to the Planning Commission, and then they make their recommendations to the City Council. The Council will consider the comments from the Planning Commission, staff, and outside agencies, along with your comments and concerns to {etertnitie what conditions will be required for approval. Please consider this condition as the start of a conversation 13065 Orono Parkway Elk River, MN 55330 763.635.1000 P a i E R E 0 1 1 NATUR E1kRiverMN.gov regarding long-term safety and access for the site, especially as traffic patterns begin to change due to improvements in Anoka, Ramsey, and Elk River. The platooning effect of cars moving through Elk River will cease, and gaps in traffic will become harder and harder to find. • The only structure that is used for ERX events/gathering/assembly is the chalet and that was brought up to code in 2016. I don't think that this should be listed in this way. It sounds like, you're going to send Bob out to inspect again to add additional costs to the chalet that we already paid for? That's not fair what if your codes changed since then. Not fair. Along with the chalet, the Carlson Motorsports building, the shipping container viewing area, and the bridge over the track entrance are also some structures used for gathering, assembly, spectators, viewing, and/or customers. It is unclear what the structures on 75-110-1100 are used for. I was told the chalet was brought up to mechanical and egress code but may need a restroom as it has a retail component to it also. While the city tries to be helpful with guidance, our role is not to design and determine what is required, this is what a registered architect would do for you, determine what requirements are needed per all the codes, including ADA regulations. Yes, it is saying these building/structures need to be reviewed by the Building Official for compliance. Fairness is holding all commercial businesses to city and state regulations. As ERX is a bona fide commercial business, each application for a building permit, and when required by the building official for enforcement of any provisions of this article, two sets of plans and specifications shall be submitted. All plans and specifications, except for single- family dwellings, or any other buildings exempted by Minnesota Statute or the Minnesota State Building Code, shall be prepared and signed by a registered architect or a registered professional engineer duly qualified by registration as required by Minn. Stats. � 326.02. State statue 1300.0120 Subpart 4 outlines when permits shall not be required. As you can see, every structure on site over 200 square feet requires a building permit, regardless of the use. To get a better understating of all the functions on site is why I asked for a list of all structures, their current uses, and what permits have been issued. • Bullet point 9 — assuming the date will change if the map changes? Prior to CUP approval? Correct • Bullet point 14 — is this consistent with city code... or is this with the plans that I sent you? Keep in mind — those plans were from two years ago and I'd like noted that the plans sent were an EXAMPLE of the type of sign that could be used. During our phone conversation I noted that we need to know the height, location, and size of changeable copy sign so it would not be left open ended. Code allows up to 30 sgft without a CUP and all changeable copy signs must comply with the standards set forth in Sec. 30-864 (e). A sign permit is required for all signs. The 70 sgft is based on what you submitted. Please let me know if you have a desire for a larger changeable copy sign and we can update the recommendation during the meeting. • Clarification — I could still erect a VIP Viewing structure because it's listed as future on the map correct? NK'hen/if the CUP is approved, yes, the VIP viewing structure can be constructed once a commercial building permit has been issued. Does the memo indicate something otherwise?