5.6 ERMUSR 05-10-2022UTILITIES COMMISSION MEETING TO:FROM: ERMU Commission Chris Kerzman –Engineering Manager MEETING DATE: AGENDA ITEM NUMBER: May 10, 2022 5.6 SUBJECT: Field Services Facility Expansion Project Update ACTION REQUESTED: Adopt resolution 22-9, Awarding and Approving the Assignment of Construction Contract to RJM Construction. BACKGROUND: During bidding, there were three categories that RJM Construction did not receive conforming quotes for and carried an allowance in their contract. The three categories that were not awarded were Final Cleaning, Waterproofing & Weatherproofing, and Vehicle Wash. At previous commission meetings ERMU has awarded the contracts for Waterproofing & Weatherproofing and Vehicle Wash. RJM has since reached out to additional vendors and has only received one conforming quote for Final Cleaning. DISCUSSION: Over the past month, the contractor was able to pour the concrete on the lower levels of the north portion of the building for the workshops, locker rooms, and lunchrooms, as well as complete installation of the masonry and steel stud walls. The plumbing and electrical contractors are working on rough-ins, and the stairs have been installed. The painters are continuing work in the garage, inventory, maintenance and wash bays, as well as the lighting, HVAC, and fire protection controls work. Upcoming work for the next month is expected to include pouring of the topping on the second level, exterior siding and stone installation, window installation, and framing of the offices on the second floor. Garage doors are scheduled to ship on May 6, but the contractor has not yet received a shipping confirmation. During development of the guaranteed maximum price, RJM carried an allowance of $40,000 for final cleaning. With the quote for final cleaning coming in at $15,980, the remainder of the allowance will be returned to the project contingency with any unused funds at the end of the project returned to ERMU. ATTACHMENTS: Letter of Recommended Award Quote Category 1C Quote Category 1C Proposal Resolution 22-9 - Awarding and Approving the Assignment of Construction Contract to RJM Construction ______________________________________________________________________________ Page 1 of 1 123 124 BB-220065 Proposal Number Prepared on 5/2/2022for:CellDirectEmail Justin Rice–Senior Project Manager(952) 334-8925justin.rice@rjmconstruction.com Client Address: Job Project: RJM ConstructionElk River Municipal Utilities Field Services Building 830 Boone Avenue North1437 Main Street NW Golden Valley, MN 55427Elk River, MN 55330 Area(s) to be ServicedSquare Footage Main Floor Approximately: 48,000 Second Floor(including Mezzanine) Approximately:10,000 Work To Be Performed: Provide post construction final cleaning of newly built facility including: 1.Wash all windows (inside & out) including all glass, frames, mullions and ledges. 2.Dust walls as needed including all wall mounted signs, corner guards, stainless steel counters, objects and devises. 3.Wipe down all doors, door frames, kick plates and associated hardware. 4.Wipe clean all case work inside and out including lockers, cabinets, countertops & plumbing fixtures. 5.Clean and polish allsinks. 6.Clean and sanitize bathrooms rooms including walls, partitions, floors, grab bars,baby changing station, mirrors & plumbing fixtures. 7.Autoscrub and/or damp mop all hard surface floors. 8.Vacuum all carpeted floors including edges. 9.Hand clean all base materials as needed. Base Bid – Labor,Materialsand Equipment: $ 14,813.44 $1,166.56 Base Bid – 7.875% Sales Tax: Base Bid – Total:$ 15,980.00 Exclusions: Overhead Surfaces in high bay areas. Note: This Quotation for1 final cleanincludes allUnion labor@ PREVAILING WAGE RATES(Construction and General LaborersCommercial Cleaners Classification), Supervision, materials and equipment. Should additional labor be required beyond the Scope of Work and authorized by RJM, there will be an additional charge of $98per hour. Price is good for 30 days. Project is to be turned over for final cleaning: 1mobilization; areas that are partially complete may be subject to additional cost. ACCEPTANCE OF PROPOSAL. All work to be completed in a workmanlike manner according to standard practices. Any alterations or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman’s Compensation Insurance. Owner agrees to supply MidwestSpecialty Maintenance with 110-voltpower and water to complete the cleaning process. Payment terms of Net 30 are acceptable. In the event payments are not madeas outlined herein, the undersigned agrees to pay all costs of collection and attorney’s fees incurred by Midwest Specialty Maintenance. The above prices, specifications and conditions are hereby accepted.You are authorized to complete the work as specified. Date of Acceptance Authorized Signature Purchase Order # ______________________ Printed Name ___________________________________ We look forward to serving you. 5/2/2022 Brian Bumgarner, General ManagerDate Midwest Specialty Maintenance, Inc. 9225 East River Road NW Coon Rapids, MN 55433 Phone (763) 493-2555 Fax (763) 493-2545 125 RESOLUTION NO. 22-9 BOARD OF COMMISSIONERS ELK RIVER MUNICIPAL UTILITIES A RESOLUTION OF THE BOARD OF COMMISSIONERS OF ELK RIVER MUNICIPAL UTILITIES AWARDING AND APPROVING ASSIGNMENT OF CONSTRUCTION CONTRACT TO RJM CONSTRUCTION FOR THE ELK RIVER MUNICIPAL FIELD SERVICES FACILITY PROJECT WHEREAS, Elk River Municipal Utilities (ERMU) and Contractor (RJM) have entered into a certain Standard Form of Agreement between Owner and Construction Manager dated January 12, 2021 (“Contract”), whereby Contractor undertakes the construction management of project known as the ERMU Field Services Facility Expansion Project (“Project”); and WHEREAS, at its February 9, 2021 meeting the Utilities Commission authorized advertisement of bids and quotes. The project was advertised from February 27, 2021 to March 24, 2021, and bids were opened and publicly read on March 24, 2021; and WHEREAS, the Project bid documents included the proposed contract for the Work (as defined in the Contract); and WHEREAS, the Contract requires that ERMU assign to RJM all of ERMU’s rights in and to contracts for the construction of the Work (as defined in the Contract) which have been competitively bid and awarded by the Utilities Commission; and WHEREAS, no quotes were received at the time of bid opening, and RJM has since received quotes for this quote category; and WHEREAS, the low bidder for quote category 1C – Final Cleaning is Midwest Specialty Maintenance, Inc. with a quoted amount of $15,980.00; NOW, THEREFORE, in consideration of the mutual promise and agreements made in the Contract and other good and valuable consideration the receipt and sufficiency of which is hereby acknowledged: 1. ERMU herby grants, transfers and assigns to RJM all of its right, title and interest in and to the contract identified below as included in the bid documents. 126 2. RJM herby consents to and accepts this Assignment and agrees to perform all of its obligations under the Contract for the benefit of ERMU. RJM will enter into contract in the same form included in the bid Documents with the contractor awarded the bid by ERMU. 3. This Assignment shall be binding upon and inure the benefit of ERMU and RJM and their respective heirs, successors and assigns, as the case may be. 4. This Assignment may be signed in more than one counterpart, together shall constitute an original document. QUOTE CATEGORYCOMPANY AMOUNT Midwest Specialty 1C- Final Cleaning Maintenance, Inc. $15,980.00 NOW, THEREFORE BE IT HEREBY RESOLVED BY THE BOARD OF COMMISSIONERS OF ELK RIVER MUNICIPAL UTILITIES, that quote category 1C be awarded to Midwest Specialty Maintenance, Inc., and the assignment of construction contract for quote category 1C to RJM Construction for the Elk River Municipal Utilities Field Services Facility Expansion Project in the amount of $15,980.00 is approved. th day ofMay 2022. This Resolution Passed and Adopted this 10 John J. Dietz, Chair Theresa Slominski, General Manager 127