Loading...
4.9 SR 05-16-2022Request for Action To Item Number Mayor and Ci T Council 4.9 Agenda Section Meeting Date Prepared by Consent May 16, 2022 Ryan Sandhoefner, Engineer 1 Item Description Reviewed by Change Order 1: 2022 Street Improvements Justin Femrite P.E., Public Works Director Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the following change order for the 2022 Street Improvement project. Background/Discussion CO 1 — Holt St Improvements ■ Holt St is a frontage road that lies between 1971h Ave and Jackson Ave, just west of TH169. A resurfacing (edge mill and overlay) project is recommended to restore the aged surface that is currently impacting its rideability due to cracking, potholes, and patches from utility relocate work completed in the past year. With the closure of 1971h Ave, a window of time is available to complete this work before the heavier traffic demands expected in 2023. Financial Impact CO 1 - $119,157.24 ■ Pavement Management funds used for the entire cost Mission/Policy/Goal Meet Changing Needs - Agile Attachments ■ Change Order 1 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei l_ y. M TUREJ Updated.• August 2020 on reverse side PROJECT: 2022 Street Improvements OWNER: City of Ells River 13065 Orono Parkway Elk River, MN 55330 CONTRACTOR: North Valley, Inc. CONTRACT FOR: 2022 Street Improvements SECTION 00671 Change Order 2022 Street improvements Elk River, Minnesota No. DATE OF ISSUANCE: 5/11/2022 You are directed to make the following changes in the Contract Documents. Description: Purpose of Change Order: Addition of Holt St Resurfacing Attachments (List documents supporting change): North Valley Quote, Site Map CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price $ 338.381.70 Original Contract Time Substantial Completion: 10/15/2022 Final Completion:10 r 15 ' 2022 Previous Change Orders No. to No. Net change from previous Change Orders _ _ $ 0 Days Contract Price prior to this Change Order _ Contract Time prior to this Change Order Substantial Completion:10/15/2022 $ 338,381.70 Final Completion: 10/15/2022 Net Increase (Decrease) of this Change Order Net Increase (Decrease) of this Change Order 0 days for Substantial Completion $119,157.24 days for Final Completion Contract Price with all approved Change Orders Contract Time with all approved Cha pe Orders Substantial 10/151822 Completion: $ 457,538.94 Final Completion: 10 15 /2022 By city � lgi ETCDC No. , D: APPROVED: By City of Elk River n za;i1P " By Ala,,A t/dlky 3. —,x, Change Order 00671 - 1 Change Order Instructions A. General Information 2022 Street Improvements Elk River, Minnesota This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Time. Changes that have been initiated by a Work Directive Change must be incorporated into a subsequent Change Order if they Affect Price of Time. Changes that affect Contract Price or Contract Time should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. For supplemental instructions and minor changes not involving a Change in the Contract Price or Contract Time, a Field Order may be used. B. Completing the Change Order Form Engineer initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or Both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to price or to the time, cross out the part of the tabulation that does not apply. Change Order 00671 - 2 20015 Iguan�hSRieet NW, Suite 100 Nowthen, MN 55330 (763) 274-2580 Fax (763) 274-2584 PLEASE ACCEPT OUR SUB QUOTE FOR THE FOLLOWING PROJECT: BID DATE: 5/4/2022 BID TIME: GENERAL CONTRACTOR: CITY OF ELK RIVER PROJECT DESCRIPTION: ADDITIONAL WORK (HOLT ST PROJECT NO: ESTIMATOR: STEWART PACKER ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT PRICE EXTENDED AMOUNT MOBILIZATION 100 LS $ 3.472.08 $ 3,472.08 EDGE MILL (1.25'' - 0'') 4,355,00 SY $ 1.37 $ 5,96635 1.5" BITUMINOUS WEAR COURSE 1,100.00 TN $ 88.50 $ 97,350 00 4'' SOLID 2 LINE - MULTI COMP 870.00 LF $ 0.46 $ 400,20 24'' SOLID LINE - MULTI COMP 48.00 LF $ 8.68 $ 41664 4'' BROKEN LINE - MULTI COMP 100.00 LF $ 0.46 $ 46.00 4'' DOUBLE LINE - MULTI COMP 2,520.00 LF $ 0.90 $ 2,268.00 PAVEMENT MESSAGE - MULTI COMP 123.60 SF $ 8.68 $ 1,072.85 CROSSWALK - MULTI COMP 30600 SF $ 7.38 $ 2,25828 MANHOLEADJUST (IRON RING) 10.00 EA $ 271.26 $ 2,712.60 GATE VALVE ADJUST (IRON RING) 10.00 EA $ 92.23 $ 922,30 BITUMINOUS PATCHING IF NEEDED 10.00 SY $ 64.44 $ 644,40 TRAFFIC CONTROL 1.00 LS $ 1.627.54 $ 1,627 54 TOTAL: $ 119,157.24 BOND IS INCLUDED, CANNOT DEDUCT FOR ONE NO TRAFFIC CONTROL PRICE INCLUDES TAX RETAINAGE HELD PER OWNERS SPECIFICIATIONS THIS QUOTE IS PER THE AGC STANDARD SUB -CONTRACT AGREEMENT FOR HIGHWAY/HEAVY- INDUSTRIAL DIVISION (1956 EDITION, REVISED 1966, REVISED 1980 AND RIDER 1986 REVISION) UPON REQUEST, NORTH VALLEY, INC. SHALL BE PROVIDED WITH THE LEGAL DESCRIPTION OF THE PROPERTY, THE NAME AND ADDRESS OF THE OWNER. NORTH VALLEY, INC. SHALL NOT BE OBLIGATED TO COMMENCE OR CONTINUE SUBCONTRACT WORK UNLESS ADEQUATE ASSURANCE OF PAYMENT IS RECEIVED. QUOTE MAY BE WITHDRAWN IN 10 DAYS. COMMENTS: BID GOOD FOR ITEMS AND MATERIALS QUOTED ABOVE ONLY PRICES GOOD FOR "2022" ASPHALZ 100% RECYCLABLE Page 1 Affirmative Action / Equal Opportunity Employer 2022 Street Improvements Holt St 1:9,028 0 0.05 0.1 0.2 mi 0 0.07 0.15 0.3 km city E