Loading...
4.11 SR 06-06-2022Request for Action To Item Number Mayor and Ci r Council 4.11 Agenda Section Meeting Date Prepared by Consent June 6, 2022 Ryan Sandhoefner, Engineer 1 Item Description Reviewed by Accept Proposal for the Construction of 13 Justin Femrite P.E., Public Works Director Reviewed by Lights along the Highway 10 Trail Cal Portner, City Administrator Action Requested Approve, by motion, the quote to authorize Design Electric Inc. to construct 13 trail lights between Gary Street and the western limits of the Lake Orono bridge. Background/Discussion As part of the federal grant received for the construction of the Highway 10 trail, lighting was a component that was to be included along the full length. The lighting installed last year, with the MnDOT TH 10 reconstruction project, was confined to the limits of the MnDOT project which stopped on the east side to the Lake Orono Bridge. The remaining segment to finish the lighting system west of the bridge to Gary Street was intended to be done locally (and is part of our planned local cost share for the overall pro)ect). To complete this element, 13 additional trail lights are included in the attached quotation. The style and spacing of the lights is consistent with the existing lights on the east side of the bridge. Two quotes were obtained ranging from $92,377.06 to $103,878.50. Staff recommends acceptance of the low quote submitted by Design Electric Inc. in the amount of $92,377.06. Financial Impact The local cost share for the TH 10 Trail project as include in the CIP, was detailed to come from the Park Dedication fund. Mission/Policy/Goal Opportunity to live, work, and play. Attachments Design Electric - Quote The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei ly. M TUREJ Updated.• August 2020 Page 1 of 1 PROPOSAL DESIGN 4807 Heatherwood Road CD-Fl 4k% PO Box 1252 ELECTRIC INC. 5t Cloud, MN 56301-56302 COMMERCIAL INDUSTRIAL TRANSPORTATION Phone: (320) 252-1658 www.DesignElect.com Fax: (320) 252-4276 PROPOSAL SUBMITTED TO: PHONE DATE CITY OF ELK RIVER 05.19.2022 STREET JOB NAME (13) TRAIL LIGHTING CITY, STATE AND ZIP CODE JOB LOCATION ELK RIVER, WEST SIDE OF ORONO BRIDGE FAX/EMAIL DATE OF PLANS ATTN: JOB PHONE RYAN SANDHOEFNER We hereby submit specifications and estimates for: ELK RIVER WEST SIDE OF ORONO BRIDGE (14) ADDITIONAL TRAIL LIGHTING DESCRIPTION QTY UNIT U/M EXTENSION MOBILIZATION 1 $ 1,440.00 EA $ 1,537.00 LIGHT POLES 13 $ 5408.63 EA $ 70,312.00 LIGHT CABINET 1 $ 7,164.50 EA $ 7,164.50 LIGHT CABINET PAD 1 $ 1,207.49 EA $ 1,207.49 #2 XHHW WIRE CU 330 $ 3.65 LF $ 1,204.88 #6 XHHW WIREE CU 5680 $$/�1.93 LF $ 10,951.19 P SCDE A��i BASE 1 $1999.32 EA sls,qS3.13 " on 1 1.5 14DPE SCu 190 $4�.48 L7�$9,190.97 BORING n7Z RIVE YS 20 $12.90 LF $298. NOTES: THESE ARE ESTIMATED QUANTITIES. FINAL INVOICE WILL BE FOR UNITS USED NO GPS AS BUILTS INCLUDED NO FINAL RESTORATION INCLUDED NO CONCRETE REMOVAL INCLUDED CITY TO PAY ELK RIVER UTILITY FEES NO BORING INCLUDED CITY TO PROVIDE BOLTS FOR SCREWINGS REVISED QUOTE AS OF 05.19.2022 We propose hereby to furnish material and labor - complete in accordance with the above specifications, for the sum of: Dollars 92377.06 Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a professional manner Authorized Signature: according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Note: This proposal may be withdrawn by us if not accepted Worker's Compensation Insurance. Price above is based on standard AGC contract and insurance within 30 days. limits. We reserve the right to charge for any attorney fees that would be associated with collecting any money owed on this contract. There is no bond included unless noted otherwise. Acceptance of Proposal — The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payments will be made as outlined above. Signature: Date of Acceptance: Signature: