Loading...
9.0 PRSR 06-08-2022 Memorandum To: Parks and Recreation Commission From: Michael Hecker, Parks and Recreation Director Date: June 8, 2022 Subject: Director’s Report This report is a monthly highlight of department activities related to recent collaborations, strategic planning, staff changes/developments, and park operations. Active Elk River - Orono Park & YAC The YAC buildings were completed in time for the Ice Breaker tournament. This project is mostly complete except for the punch list items. Orono Park is making satisfactory progress, except for the splash pad and pickleball courts. The park will remain closed until the final lift is completed. The latest information on the pickleball courts is attached. YAC athletic fields #4, #5, #6 YAC fields 4-6 are currently closed due to severe turf dieback. Staff is continuing to investigate determining the cause of the turf damage. The likely scenarios are detailed in the attached memo. Tonya Love Farewell Tonya Love resigned after 18-years with the city taking a new job in the private sector. Her farewell was on May 25. We will miss the unofficial department historian. Ali will fill in as the Parks Commission Secretary and other administrative duties until the position vacancy is filled. WTRP Nature Play Area and Shelter Project The electrical subcontractor failed to install proper grounding underneath the water feature. Unfortunately, this means the water feature is inoperable and in violation of the state-adopted electrical code. Also, the nearby pavilion has not had a final inspection by the state and is also not code compliant. A letter from our attorney to the contractor addressing these issues is attached. Both features will be closed until further notice. Trott Brook Park Tennis Court Project Excavation work started on this project May 19. All work should be substantially completed before Friday, July 1. Item: 9 Rivers Edge Commons Park Dock Our consultant verified that the permanent portion of the upper dock/ramps/walkway (lower part is removed each fall) doesn’t increase the flood stage for the Mississippi River. The city is the Local Government Unit for these no-rise certificates, but we had our consultant sign this one to create some separation. It was sent to the DNR for review last week for their approval/OK. The operation plan was also sent to the DNR for their review. Now we have to wait for the river to go down a couple of feet so public works can safely remove the trees that are in the way which will likely take a week to complete. Fireworks on Independence Day Our Fireworks company, RES PRO, has committed to shooting this year’s show on Independence Day. The shooting location will be the Oak Knoll Athletic Complex following concerns from ISD #728. We plan to have the same fireworks show as 2021, but it will look different to some residents because of its changed location. RES PRO does all the fireworks shows for the Twins, Vikings, and Saints. Summer Programming & Events Summer youth sports and enrichments camps are set to start June 13. We have two, new youth summer leagues of t-ball and soccer, all of which are full! We also have kayak and paddle boarding classes and are hosting a Minnesota Twins Playball clinic on June 25 at the John Bath Fields at Lions John Weicht Park. We had to cancel some of our programs due to the lack of seasonal staff. Towards the end of summer, we will be doing movies in the park as well, more details to come. The Farmers Market has a new high for sponsor participation as well as a fantastic lineup of vendors with a healthy waitlist. Opening day is June 16 with limited edition 2022 insulated tote bags to the first 500 shoppers. Both the Riverfront Concert Series and Entertainment in the Park start on June 16 with a fantastic line up of performers. Story Strolls return to Woodland Trails after a successful first year in 2021. The first story will be set up for June 6 with four rotating stories until August 6. Memorandum To: City Council From: Justin Femrite & Tim Sevcik Date: May 27, 2022 Subject: Update on Youth Athletic Field Conditions YAC fields 4-6 are currently closed due to severe turf dieback. Staff is still looking into determining the cause the turf damage which is likely the result of one of three scenarios: 1) Improper mixing of herbicides used in treatment of crabgrass, dandelions and clover; 2) a combination of turf related disease and stress from herbicide treatment; or 3) a batch of chemical that was improperly manufactured. Public works has been conducting herbicide treatments on athletic fields for 12-years. All herbicide applications are conducted by Minnesota Department of Agriculture licensed pesticide applicators of which we have 3 on staff. The chemicals used in this treatment have been utilized for at least 6- years and are standard commercial grade herbicides utilized for treatment of athletic fields. Staff has never previously had an issue utilizing these, or any other herbicide treatments thus making us feel like scenario 1 is unlikely (but not off our list of possibilities). Staff has had the fields inspected by a turf specialist from Reinders who found signs of an unspecified turf disease present however based on the patterns of dieback it is not believed scenario 2 is the likely culprit. Samples of the turf, soil and herbicide from the containers used in treating the fields were collected by Nutrien Ag Solutions this week and sent off for laboratory analysis to see if a chemical related cause can be determined. Additionally, staff reviewed GPS data from the tractor that conducted the herbicide applications on the fields and inspected containers of chemical to determine if a mixing error had occurred. Based on GPS data, we are able to determine the sequence of spraying of fields at OKAC and YAC. OKAC fields 1-2 and the infield of YAC 5 along with 3 passes along the warning track of field 5 were treated with the first tank of herbicide spray. The remainder of field 5, all of fields 6 and 4, and one pass along the warning track of fields 2-3 were applied with the second tank mix. Fields 1-3 were treated with the third tank mix. No impacts to the turf were observed from tanks 1 and 3. While looking at the containers of herbicide purchased from Nutrien Ag Solutions, it was determined that two different manufacturer lots of chemical were used; two containers utilized in tanks 1 and 3 from the same lot, and 1 container from a second lot used in tank 2 which ultimately was used on YAC 4-6. Nutrien Ag Solutions informed staff that they have heard of bad lots of Mec-Amine-d, the broadleaf herbicide utilized in the treatment, in the past but were not aware of any currently. While it is likely the Mec-Amine-d herbicide caused the dieback of the turf, the second chemical utilized for crab grass treatment is the greater hurdle going forward. Dimension herbicide is a pre- emergent crabgrass preventer applied to the turf which creates a barrier on the soil surface inhibiting seed germination. This chemical has a residual effect for up to four months which means reseeding is not likely to be successful. Staff is currently running a number of test plots on YAC 6 to determine the viability of reseeding to include different seed types, different seeding techniques, and resodding of the fields. We will observe these test plots over the next several weeks to determine which, if any will be successful for reestablishing turf. COUNTY HIGHWAY NO. 40EM>>>>>>>>D&U E a s e m e n t Per D o c . N o . 6 1 8 6 4 4 OHLOHLOHLOHLOHLOHLOHLOHLOHLOHLWETWETWET W E T WETWETWE T WET WET WET WET WETWETWETWETWETWETWETWETWETWETWETWETWETWETWETW E T WE T WETWETWET WETWET WET WE T WETWETWETWETWET WETWETWETWETWETWE T WETWETWETWETWET FP100FP1 0 0 FP100FP100FP100FP100FP100FP100FP100FP100F P 1 0 0 FP100FP100FP100F P 1 0 0 FP100 F P 1 0 0 FP100FP100 FP100 FP100FP100FP100FP100FP10 0 FP100FP100 FP10 0 FP100FWFWFWFWFWFWFWFWFWFW FWFWFWFWFWFWF W FW FW FW FW FW FW FW FW FW FW FW F W FW FW FWFWFWFWFWFWFWFWFWFWFWFWFWFWFWFWFW FWFWFW FW FW FW FW FW FW FW F W ISGInc.com CAD FILE NAME Architecture + Engineering + Environmental + Planning 26553 CONCEPT FILE LOCATION: S:\PROJECTS\26000 PROJ\26500-26599\26553 FOSTER PROPERTY-ELK RIVER MN\26553 CIVIL-SURVEY\CIVIL_NON PRODUCTION DRAWINGS\26553 CONCEPT.DWG ISG PROJECT NO. 22-26553 FOSTER PROPERTY DEVELOPMENT ELK RIVER, MINNESOTA - 2022/05/05 CONCEPTUAL LAYOUT - PARK N0 SCALE IN FEET 200 400 PUBLIC OUTLOT APPROXIMATELY 88 ACRES 5 43 2 1 1 2 3 4 5 POTENTIAL ACCESS LOCATION / PICNIC AREA POTENTIAL PICNIC / RESTING AREA POTENTIAL PICNIC / RESTING AREA POTENTIAL PICNIC / RESTING AREA POTENTIAL TRAIL CROSSING / RESTING AREA 6 6 POTENTIAL WOOD DUCK HOUSE AREA 7 8 7 POTENTIAL TRAIL CROSSING 8 POTENTIAL PARKING AREA PUBLIC OUTLOT APPROXIMATELY 13 ACRES