7.1 PRSR 07-13-2022
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity. Updated: August 2020
Request for Action
To
Parks and Recreation Commission
Item Number
7.1
Agenda Section
Public Hearings
Meeting Date
July 13, 2022
Prepared by
Michael Hecker, Parks and Recreation Director
on
Final Plat: Jabez Third Addition Case No. P 22-
09
Reviewed by
Chris Leeseberg, Senior Planner
Reviewed by
Action Requested
Recommend, by motion, park dedication for the Final Plat for Jabez Third Addition be paid at the applicable
commercial rate when the lot is released for recording.
Background/Discussion
The subject property is two acres in size, zoned Focused Area Study
(E), and is located near the northwest intersection of 171st Avenue and
Ulysses Street. The proposed plat consists of one lot to be utilized for
a commercial oil change facility.
Park dedication is eligible for Lot 1 at a commercial rate. The exact
amount will be determined at the time of recording.
Parks and Recreation Master Plan
The neighborhood Parks Service Area text in Chapter 5 of the master
plan states, recreation facilities should be developed when 300 or more
households within cluster developments or on lots less than 2-acres are
located within 1.5 miles of the park.
The property does not meet this criterion; therefore, staff recommends
dedication be paid in the form of cash.
Parks and Recreation Trail Master Plan
An existing sidewalk is located east of the site across Ulysses Street
Financial Impact
None
Mission/Policy/Goal
Responsibly to grow
Attachments
Location Map
Final Plat
Site Plan
Master Trail Plan (partial)
∆BLOCK 1LOT 1Sherburne County, MNVICINITY MAPSec. 11, Twp. 32, Rng. 2611SITE
TIRESTRASHRECYC.OE OE OE
OEOEOEOEOEOEOEUG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UGUGUG UGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
UEUEUEUEUEUEUEUEUEUEUEUE UEUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT UT
20.0'36.0'29.0'312753.5'R=20'L=31.4'R=20'L=31.7'8.9'R=10'L=18.6'148.3'175.3'R=100'L=20.7'83.2'R=20'L=30.6'204.0'PROPOSED BITUMINOUS PAVEMENTPROPOSED CONCRETE PAVEMENTPROPOSED CHARGING STATIONS3' CURB CUT3' CURB CUT3' CURB CUTBOLLARD (TYP.)TRASH ENCLOSURESTORAGE AREASWITCH GEARE15E12WHFSBENCHBENCHCHARGINGCHARGINGE27E27E28E39E38E7E23E40E9E8E13E19E16E36E35E3E21E20E24E42E6E1E47E43E32E31E41E50E49E4812G5Y12G5A12G5V12G1T12G1P12G5812G5612RVV12G3H14PYE12HWPSPINKLERRISER15.0'36.0'5.0'PROPOSED BUILDING170'X74'24.0'32.2'24.0'9.0'
9.0'20.0'20.0'20.0'20.0'25.0'20.0'95.7'133.5'74.0'170.0'PROPOSED LIGHT POLEPROPOSED LIGHT POLE40.0'16.0'"ADA PARKING" SIGN"NO PARKING" SIGN15.0'21.9'171ST AVE NW10.0'10.0' GOPHER STATE ONE CALL MINNESOTA TOLL FREE 1-800-252-1166TWIN CITY AREA 651-454-0002CALL 48 HOURS BEFORE DIGGING:SITE BASE
SITE PLANC210:41 AM N:\Projects Current\22-0139.00 E.R. Ford\Civil\CAD Files\site plan.dwg5/31/2022
SITE PLAN NOTES:1.PAINTED PAVEMENT MARKING DIMENSIONS ARE SHOWN TO FACE OFCURB. ALL OTHER DIMENSIONS ARE SHOWN TO BACK OF CURB.2.ALL CONCRETE RAMPS, SIDEWALKS AND ACCESSIBLE HANDICAPPEDPARKING STALLS TO CONFORM TO CURRENT A.D.A. REQUIREMENTS.3.CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICAL LOCATIONOF EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION.4.CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES PRIOR TOTHE START OF CONSTRUCTION.5.CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE CITY,COUNTY AND STATE REGULATIONS.6.SITE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PLANSAPPROVED BY THE CITY.7.LANDSCAPING AND TURF ESTABLISHMENT PER LANDSCAPE PLANS &SPECIFICATIONS.SITE PLAN INFORMATION:PARCEL AREA:·2.00 ACRES ±EXISTING ZONING:·FAST PUD (E)PRINCIPAL STRUCTURE SETBACKS:·FRONT: 30'·SIDE:25'·REAR:20'ACCESSORY STRUCTURE SETBACKS:·FRONT: 25'·SIDE:10'·REAR:10'SITE DATA EXISTING PROPOSEDBITUMINOUS AREA0 SF 31,494 SFCONCRETE AREA 0 SF 14,599 SFBUILDING AREA 0 SF 12,580 SFPERVIOUS AREA 87,120 SF 28,447 SFTOTAL AREA 87,120 SF 87,120 SFTOTAL IMPERVIOUS0 % 67.3 %PARKING REQUIREMENTS:·MINIMUM PARKING STALL DIMENSIONS:20' X 10' (90° PARKING)PARKING STALLS:·TOTAL STALLS PROVIDED: 52·TOTAL ADA STALLS PROVIDED: 3 (1 VAN ACCESSIBLE)·TOTAL ADA STALLS REQUIRED:3 (1 VAN ACCESSIBLE REQUIRED)SCALE: 1" = 20'020'PROPOSED CONCRETE PAVEMENTPROPOSED TURF ESTABLISHMENTPROPOSED BITUMINOUS PAVEMENTCONCRETE CURB AND GUTTER - B612 (INFLOW)LEGEND:PROPOSED SIGNDESCRIPTIONDATENO.
REV
FILE NO.:
DWG FILE:
CHECKED BY:
DRAWN BY:
DESIGN BY:
DATE: SHEET NO.LAND SURVEYING
CIVIL ENGINEERING
ENVIRONMENTAL SERVICES
13076 FIRST STREET, BECKER, MN 55308-9322
TEL: 763-262-8822 FAX: 763-262-8844
BOGART, PEDERSON
& ASSOCIATES, INC.
City of Elk River, Sherburne County, MN
05/26/2022
22-0139.00
CJD
MVW
MVW
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
171ST AVE NW
CORNERSTONE QUICK LANE I hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Engineer under the laws of the
State of Minnesota.
Signed:
Date: Lic. No.
Christopher J. Dahn
58628 PROPOSED BOLLARD