Loading...
9.0 PRSR 07-13-2022 Memorandum To: Parks and Recreation Commission From: Michael Hecker, Parks and Recreation Director Date: July 13, 2022 Subject: Director’s Report This report is a monthly highlight of department activities related to recent collaborations, strategic planning, staff changes/developments, and park operations. Orono Park Orono Park, including the beach and restrooms, were open for the Independence Day weekend. The Minnesota Department of Health were scheduled to inspect the splash pad on July 8. The contractor had to order missing parts for the volleyball nets. The stone veneer used for our wayfinding was discontinued by the manufacturer and the pavilion contractor is working on a substitute. The concrete ribbon for the pickleball courts is poured and failed parking lot curbing was replaced. We have opened the city website to promote and reserve the three Orono Park shelters and new pavilion. A ribbon cutting/plaque dedication is planned for Tuesday, August 2, 2022, at 5:30 pm. Park Commissioners and City Council are encouraged to attend. We plan to have food trucks at the event. This is the same night as the Police Departments Night to Unite event. The police are planning to host their annual event in three parks – Orono, Lion John Weicht and Trott Brook. Orono Park Pickleball Court New Look removed the Orono Park pickleball court bituminous and concrete ribbon and regraded the site. Bituminous replacement is expected within the next two weeks. The final bituminous lift needs 30 days to cure before the final acrylic and lines are installed. Trott Brook Tennis Court This project is nearly complete and as with the pickleball courts, we have a 30-day wait for the acrylic coating and striping. We will not install the nets until the entire process is completed around August 1. Item: 9 Unmanned aircraft in city parks Michael spoke with the farmer of the Rice Lake Park agricultural field who continues to farm the land. As per the Quit Claim Deed, the property shall be used for public park purposes only, upon the termination of the lifetime right of Richard Thompson to use it for agricultural crop purposes. Based on the June discussion with the Commission, YAC is not an option for drones. Michael was in contact with the Northwest Radio Control Club President informing him that park sites are not an option currently. It was recommended the Club pursue the county fairgrounds or private property. Property for sale adjacent to Camp Cozy At the May meeting, the Commission discussed the potential property for sale adjacent to Camp Cozy. The Commission requested more information. As staff reviewed the property, it was discovered the property is no longer for sale. Country Crossings Basketball Court The basketball court is complete and ready for play. YAC Based on the results of our turf test plots at YAC, we are preparing to reseed the areas killed off by the herbicide. We have consulted with a seeding expert to formalize a reseeding and fertilizing plan that is expected to maximize the regrowth. Our goal is to have the three fields looking green by August and fully ready for use by the spring of 2023. Rivers Edge Commons Park Dock The tree removal was completed in late June to prepare for the dock installation. The dock installation will begin on July 11, and it will be a 2–3-day process. WTRP Nature Play Area and Shelter Project Staff met with the state electrical inspector at Woodland Trails. This is an abject failure by Killmer Electric. We will continue to push them for an expedient resolution while the inspector turns the case over to state enforcement. Unfortunately, this means the water feature is inoperable and in violation of the state-adopted electrical code. It will continue to be closed until further notice