5.2 ERMUSR 07-12-2022��i Elk River � Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Chris Kerzman — Engineering Manager MEETING DATE: AGENDA ITEM NUMBER: July 12, 2022 5.2 SUBJECT: Field Services Facility Expansion Project Update ACTION REQUESTED: None DISCUSSION: Over the past month, the majority of the drywall has been installed on the second floor. The remaining windows are waiting on site grading, which is currently being held up by concrete installation. Garage doors arrived during the week of June 23, with multiple doors that will need panels changed after installation, but they are being installed to secure the building. Upcoming work for the next month is expected to include continued work in the upper level such as drywall, painting, electrical installation, and plumbing fixtures. There are various locations throughout the garage that need concrete issues addressed, but with garage doors installed, the majority of work in the garage will be complete in July. Staff is expecting that we will get a temporary certificate of occupancy near the end of the month to begin transferring inventory. Staff expects to present a verbal update on the initial structural steel contractor's default and overall project schedule at the commission meeting. Page 1 of 1 :.